SpecSection_03-35-00.pdf

PDF 55 KB Posted

Attached to
Camp Geiger and Camp Johnson PEBs Federal contract opportunity
Solicitation number
N4008518B6167
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

Spec Section 03 35 00

View the file

Other files for this federal contract opportunity

Other files attached to Camp Geiger and Camp Johnson PEBs, newest first.
File Type Posted
Amend0005_186167.pdf PDF
Amend0004_186167.pdf PDF
Amend0003_186167.pdf PDF
SpecSection_03-35-01.pdf PDF
Amend0001_186167.pdf PDF
N4008517B0060_Specs.pdf PDF
N4008517B0060_Dwgs1of4.pdf PDF
N4008517B0062_Dwgs2of3.pdf PDF
N4008517B0062_Dwgs1of3.pdf PDF
N4008517B0062_Specs.pdf PDF
N4008517B0060_Dwgs3of4.pdf PDF
Solicitation_186167.pdf PDF
N4008517B0060_Dwgs2of4.pdf PDF
N4008517B0062_Dwgs3of3.pdf PDF
N4008517B0060_Dwgs4of4.pdf PDF
N4008518B6167_PreSolic_186167.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 03 35 00

CONCRETE FINISHING

PART 1 GENERAL

1.1 SUMMARY

A. Section Includes:

1. Precautions for avoiding staining concrete before and after application.

1.2 REFERENCES

A. American National Standards Institute (ANSI):

1. ANSI B101.1 Test Method for Measuring Wet SCOF of Common Hard-Surface Floors.

2. ANSI B101.3 Test Method for Measuring Wet DCOF of Common Hard-Surface Floors.

B. ASTM International (ASTM):

1. ASTM C779 Standard Test Method for Abrasion Resistance of Horizontal Concrete Surfaces.

2. ASTM C805 Standard Test Method for Rebound Number of Hardened Concrete.

3. ASTM C1028 Standard Test Method for Determining the Static Coefficient of Friction of Ceramic Tile and Other Like Surfaces by the Horizontal Dynamometer Pull-Meter Method.

4. ASTM D3359 Standard Test Methods for Measuring Adhesion by Tape Test.

5. ASTM G23 Practice for Operating Light-Exposure Apparatus (Carbon-Arc Type) With and Without Water for Exposure of Nonmetallic Materials (Withdrawn 2000).

C. National Floor Safety Institute (NFSI):

1. Certified as High Traction by the National Floor Safety Institute (NFSI), Phase 2 testing.

D. USGBC LEED Version 4

1. Indoor VOC Emission Test; California Department of Public Health CDPH/EHLB/Standard Method Version 1.2, 2017.

E. Health Product Declaration Collaborative (HPD)

1. HPD v1.0.

2. HPD v2.1.

1.3 SUBMITTALS

A. General: Submit listed submittals in accordance with Conditions of the Contract and Section 01 33 00 - Submittal Procedures.

B. Product Data: Submit product data, including manufacturer’s Spec-Data sheet, installation instructions and technical bulletins for specified products.

C. Certificates: Manufacturer’s certification that the installer is acceptable.

D. Maintenance Data: Maintenance instructions, including precautions for avoiding staining after application.

1.4 QUALITY ASSURANCE

A. Installer Qualifications: Acceptable to the manufacturer.

1.5 DELIVERY, STORAGE & HANDLING

A. General: Comply with Division 01 Product Requirements section.

B. Delivery: Deliver materials in manufacturer’s original, unopened, undamaged containers with identification labels intact.

C. Storage and Protection: Store materials protected from exposure to harmful environmental conditions and at temperature and humidity conditions recommended by the manufacturer.

D. Handling: Protect materials from dirt, corrosion, oil, grease and other contaminants.

1.6 RELATED SECTIONS

A. Provide Joint Sealer in concrete joints, see Section 03 35 00.

PART 2 PRODUCTS

2.1 MATERIAL

A. Provide Cure-Seal Hardener as specified.

1. Basis of design is Curecrete Distribution, Inc., Ashford Formula, Telephone: (800) 998-5664, Email:

info@ashfordformula.com; Website: www.ashfordformula.com.

2. Equal products by other manufacturers are acceptable.

B. Cure-Seal-Hardener: Shell be a water-based, chemically reactive penetrating sealer and hardener that densifies concrete to seal against water molecules, but allows air and water vapor to pass, so that concrete can achieve full compressive strength for minimized surface crazing and elimination of dusting.

1. Abrasion Resistance to Revolving Disks: At least a 32.5% improvement over untreated samples when tested in accordance with ASTM C779.

2. Surface Adhesion: At least a 22% increase in adhesion for epoxy when tested in accordance with ASTM D3359.

3. Hardening: As follows when tested in accordance with ASTM C39:

a. After 7 Days: An increase of at least 40% over untreated samples.

b. After 28 Days: An increase of at least 38% over untreated samples.

4. Coefficient of Friction: 0.86 dry, 0.69 wet when tested in accordance with ASTM C1028.

5. Rebound Number: An increase of at least 13.3% over untreated samples when tested in accordance with ASTM C805.

6. Light Exposure Degradation: No evidence of adverse effects on treated samples when tested in accordance with

ASTM G23.

7. Test Method for Measuring Wet SCOF of Common Hard-Surface Floors in accordance with ANSI B101.1.

8. Test Method for Measuring Wet DCOF of Common Hard-Surface Floors in accordance with ANSI B101.3.

9. Certified as High Traction by the National Floor Safety Institute (NFSI), Phase 2 testing.

10. Certified Compliant according to California Department of Public Health CDPH/EHLB/Standard Method Version 1.2, 2017.

PART 3 EXECUTION

3.1 MANUFACTURER’S INSTRUCTIONS

A. Compliance: Comply with manufacturer’s product data, including product technical bulletins, product catalog installation instructions and product carton instructions for installation.

3.2 EXAMINATION

A. Do not begin installation until substrates have been properly prepared and are suitable for application of product.

B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.

3.3 PREPARATION

A. Clean surfaces thoroughly prior to installation.

B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.

C. Do not use frozen material. Thaw and agitate prior to use.

D. If construction equipment must be used for application, diaper all components that might drip oil, hydraulic fluid or other liquids.

3.4 INSTALLATION

A. New Concrete: Apply cure-seal hardener to new concrete as soon as the concrete is firm enough to work on after troweling; with colored concrete, wait a minimum of 30 days before application.

Apply in accordance with manufacturer’s written instruction.

1. Spray on at rate of 200 ft2/gal (5 m2/L) or as per manufacturer’s written instructions if different.

2. Keep surface wet with cure-seal-hardener for a minimum soak-in period of 30 minutes without allowing it to dry or become slippery. If slipperiness occurs before the 30 minute time period has elapsed, apply additional cure-seal-hardener, as needed, to keep the entire surface in a non-slippery state for the first 15 minutes; for the remaining 15 minutes, mist the surface as needed with water to keep the material in a non-slippery state. In hot weather conditions, follow manufacturer’s special application procedures.

3. When the treated surface becomes slippery after this period, lightly mist with water until slipperiness disappears.

4. Wait for surface to become slippery again, and then flush entire surface with water to remove all cure-seal-hardener residue.

5. Squeegee surface completely dry, flushing any remaining slippery areas until no residue remains.

6. Wet vacuum or scrubbing machines can be used in accordance with manufacturer’s instructions to remove residue.

3.5 PROTECTION

A. Protect installed floors for at least 3 months until chemical reaction process is complete.

1. Do not allow traffic on floors for 3 hours after application.

2. Do not allow parking of vehicles on concrete slab.

3. If vehicles must be temporarily parked on slab, place drop cloths under vehicles during entire time parked.

4. Do not allow pipe cutting using pipe cutting machinery on concrete slab.

5. Do not allow temporary placement and storage of steel members on concrete slabs.

6. Clean up spills immediately and spot-treat stains with degreaser or oil emulsifier.

7. Clean floor regularly in accordance with manufacturer’s recommendations.

END OF SECTION