Attachment_2_Phasing_Plan.pdf

PDF 2 MB Posted

Attached to
Waterfront Support Facility East (B343) Structural Repairs Federal contract opportunity
Solicitation number
N4008517B6134
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

Phasing Plan

View the file

Other files for this federal contract opportunity

Other files attached to Waterfront Support Facility East (B343) Structural Repairs, newest first.
File Type Posted
Amendment_2.pdf PDF
Amendment1.pdf PDF
Attachment_Bid_Form_REV1.pdf PDF
Attachment_1_Bid_Form.pdf PDF
Attachmen__5_Project_Specifications.pdf PDF
Solicitation_N4008617B6134.pdf PDF
Attachment_4_Repair_Location_Plan.pdf PDF
Attachment_6_Typical_Concrete_Repair_Details.pdf PDF
Attachment_3_Structural_Steel_Reference_Drawings.pdf PDF
Wage_Determination.pdf PDF
Attachment_7_Lighting_Replacement_Plan.pdf PDF
Attachment_8_Miscellaneous_Electrical_Requirements_and_Notes.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PHASE 1 WORK ZONE:

1ST BAY OF B343 (DD FLOOR & MEZZANINE LEVELS)

LAYDOWN PLATFORM

FREIGHT ELEVATOR SERVICE RAMP (NOT SHOWN)

(NOT TO SCALE)

PHASE 1 WORK & LAYDOWN AREA.

TIMEFRAME: 7/1/18-9/14/18

(NO BOAT IN DOCK)

PROPOSED PHASE 1 LAYDOWN

AREA: ~5000 SQUARE FEET ON DRY

DOCK 2 FLOOR (NOT TO SCALE)

MAJOR WORK ITEMS, PHASE 1:

-SALT WATER CONTROLS

-REMOVE EXISTING STEEL COATING

SYSTEM

-STEEL REPAIRS

-APPLY NEW COATING SYSTEM TO STEEL

-CONCRETE REPAIRS

-REMOVE/REPLACE FREIGHT ELEVATOR

SHAFT FENCING

PHASING NOTES, PHASE 1:

-ALL PHASE 1 MAJOR WORK ITEMS SHALL

BE LIMITED TO THE WORK ZONE

FOOTPRINT INDICATED ON THIS SHEET.

-ALL CURING OF COATINGS & CONCRETE

MUST BE COMPLETE BY 9/14/18

-ALL PHASE 1 WORK MUST BE 100%

COMPLETE BY 9/14/18

B343 Repairs Phasing Plan

DAL 7/25 1 of 3

PHASE 2A WORK ZONE:

EAST OF COLUMN LINE C, INCLUDING MEZZANINE

LEVEL AND DRYDOCK FLOOR LEVEL

(NOT TO SCALE)

PHASE 2A WORK & LAYDOWN AREA.

TIMEFRAME: 10/18-7/19

(BOAT IN DOCK)

ALL PHASE 2A LAYDOWN MUST

BE WITHIN THE PHASE 2A WORK

ZONE

PHASE 2 WORK ZONE:

CONTRACTOR TO PROVIDE TEMPORARY BARRIER

BETWEEN B343 AND DD2. BARRIER SHALL EXTEND

FROM DD FLOOR TO PLATFORM LEVEL. BARRIER

TO REMAIN IN PLACE UNTIL CONSTRUCTION

ACTIVITIES ARE COMPLETED.

MAJOR WORK ITEMS, PHASE 2:

-CONSTRUCT TEMPORARY BARRIER

-SALT WATER CONTROLS

-REMOVE EXISTING STEEL COATING

SYSTEM

-STEEL REPAIRS

-APPLY NEW COATING SYSTEM TO STEEL

-CONCRETE REPAIRS

BID OPTIONS

-REPAIR LIGHTING (MEZZANINE LEVEL)

-REMOVE/REPLACE TEMPORARY WOODEN

WALL (MEZZANINE LEVEL)

PHASING NOTES, PHASE 2:

-ALL PHASE 2 MAJOR WORK ITEMS SHALL

BE LIMITED TO THE WORK ZONE

FOOTPRINT INDICATED ON THIS SHEET.

-CONTRACTOR PERSONNEL SHALL NOT

ENTER THE DRY DOCK BEYOND THE

WORK/LAYDOWN ZONE INDICATED ON

THIS SHEET

ACCESS TO ELEVATOR MUST BE MAINTAINED

THROUGHOUT CONSTRUCTION.

MEZZANINE LEVEL

SHOWN, DRY DOCK

FLOOR SIMILAR. SEE

SECTION VIEW.

DAL 7/25 2 of 3

PHASE 2B WORK ZONE:

WEST OF COLUMN LINE C, INCLUDING MEZZANINE

LEVEL AND DRYDOCK FLOOR LEVEL

(NOT TO SCALE)

PHASE 2B WORK & LAYDOWN AREA.

TIMEFRAME: 10/18-7/19

(BOAT IN DOCK)

ALL PHASE 2B LAYDOWN MUST

BE WITHIN THE PHASE 2B WORK

ZONE

PHASE 2 WORK ZONE:

CONTRACTOR TO PROVIDE TEMPORARY BARRIER

BETWEEN B343 AND DD2. BARRIER SHALL EXTEND

FROM DD FLOOR TO PLATFORM LEVEL. BARRIER

TO REMAIN IN PLACE UNTIL CONSTRUCTION

ACTIVITIES ARE COMPLETED.

MAJOR WORK ITEMS, PHASE 2:

-CONSTRUCT TEMPORARY BARRIER

-SALT WATER CONTROLS

-REMOVE EXISTING STEEL COATING

SYSTEM

-STEEL REPAIRS

-APPLY NEW COATING SYSTEM TO STEEL

-CONCRETE REPAIRS

BID OPTIONS

-REPAIR LIGHTING (MEZZANINE LEVEL)

-REMOVE/REPLACE TEMPORARY WOODEN

WALL (MEZZANINE LEVEL)

PHASING NOTES, PHASE 2:

-ALL PHASE 2 MAJOR WORK ITEMS SHALL

BE LIMITED TO THE WORK ZONE

FOOTPRINT INDICATED ON THIS SHEET.

-CONTRACTOR PERSONNEL SHALL NOT

ENTER THE DRY DOCK BEYOND THE

WORK/LAYDOWN ZONE INDICATED ON

THIS SHEET

ACCESS TO ELEVATOR MUST BE MAINTAINED

THROUGHOUT CONSTRUCTION.

MEZZANINE LEVEL SHOWN, DRY

DOCK FLOOR SIMILAR. SEE

SECTION VIEW.