Attachment_2_Phasing_Plan.pdf
PDF 2 MB Posted
- Attached to
- Waterfront Support Facility East (B343) Structural Repairs Federal contract opportunity
- Solicitation number
- N4008517B6134
About this file
Phasing Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| Amendment1.pdf | ||
| Attachment_Bid_Form_REV1.pdf | ||
| Attachment_1_Bid_Form.pdf | ||
| Attachmen__5_Project_Specifications.pdf | ||
| Solicitation_N4008617B6134.pdf | ||
| Attachment_4_Repair_Location_Plan.pdf | ||
| Attachment_6_Typical_Concrete_Repair_Details.pdf | ||
| Attachment_3_Structural_Steel_Reference_Drawings.pdf | ||
| Wage_Determination.pdf | ||
| Attachment_7_Lighting_Replacement_Plan.pdf | ||
| Attachment_8_Miscellaneous_Electrical_Requirements_and_Notes.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PHASE 1 WORK ZONE:
1ST BAY OF B343 (DD FLOOR & MEZZANINE LEVELS)
LAYDOWN PLATFORM
FREIGHT ELEVATOR SERVICE RAMP (NOT SHOWN)
(NOT TO SCALE)
PHASE 1 WORK & LAYDOWN AREA.
TIMEFRAME: 7/1/18-9/14/18
(NO BOAT IN DOCK)
PROPOSED PHASE 1 LAYDOWN
AREA: ~5000 SQUARE FEET ON DRY
DOCK 2 FLOOR (NOT TO SCALE)
MAJOR WORK ITEMS, PHASE 1:
-SALT WATER CONTROLS
-REMOVE EXISTING STEEL COATING
SYSTEM
-STEEL REPAIRS
-APPLY NEW COATING SYSTEM TO STEEL
-CONCRETE REPAIRS
-REMOVE/REPLACE FREIGHT ELEVATOR
SHAFT FENCING
PHASING NOTES, PHASE 1:
-ALL PHASE 1 MAJOR WORK ITEMS SHALL
BE LIMITED TO THE WORK ZONE
FOOTPRINT INDICATED ON THIS SHEET.
-ALL CURING OF COATINGS & CONCRETE
MUST BE COMPLETE BY 9/14/18
-ALL PHASE 1 WORK MUST BE 100%
COMPLETE BY 9/14/18
B343 Repairs Phasing Plan
DAL 7/25 1 of 3
PHASE 2A WORK ZONE:
EAST OF COLUMN LINE C, INCLUDING MEZZANINE
LEVEL AND DRYDOCK FLOOR LEVEL
(NOT TO SCALE)
PHASE 2A WORK & LAYDOWN AREA.
TIMEFRAME: 10/18-7/19
(BOAT IN DOCK)
ALL PHASE 2A LAYDOWN MUST
BE WITHIN THE PHASE 2A WORK
ZONE
PHASE 2 WORK ZONE:
CONTRACTOR TO PROVIDE TEMPORARY BARRIER
BETWEEN B343 AND DD2. BARRIER SHALL EXTEND
FROM DD FLOOR TO PLATFORM LEVEL. BARRIER
TO REMAIN IN PLACE UNTIL CONSTRUCTION
ACTIVITIES ARE COMPLETED.
MAJOR WORK ITEMS, PHASE 2:
-CONSTRUCT TEMPORARY BARRIER
-SALT WATER CONTROLS
-REMOVE EXISTING STEEL COATING
SYSTEM
-STEEL REPAIRS
-APPLY NEW COATING SYSTEM TO STEEL
-CONCRETE REPAIRS
BID OPTIONS
-REPAIR LIGHTING (MEZZANINE LEVEL)
-REMOVE/REPLACE TEMPORARY WOODEN
WALL (MEZZANINE LEVEL)
PHASING NOTES, PHASE 2:
-ALL PHASE 2 MAJOR WORK ITEMS SHALL
BE LIMITED TO THE WORK ZONE
FOOTPRINT INDICATED ON THIS SHEET.
-CONTRACTOR PERSONNEL SHALL NOT
ENTER THE DRY DOCK BEYOND THE
WORK/LAYDOWN ZONE INDICATED ON
THIS SHEET
ACCESS TO ELEVATOR MUST BE MAINTAINED
THROUGHOUT CONSTRUCTION.
MEZZANINE LEVEL
SHOWN, DRY DOCK
FLOOR SIMILAR. SEE
SECTION VIEW.
DAL 7/25 2 of 3
PHASE 2B WORK ZONE:
WEST OF COLUMN LINE C, INCLUDING MEZZANINE
LEVEL AND DRYDOCK FLOOR LEVEL
(NOT TO SCALE)
PHASE 2B WORK & LAYDOWN AREA.
TIMEFRAME: 10/18-7/19
(BOAT IN DOCK)
ALL PHASE 2B LAYDOWN MUST
BE WITHIN THE PHASE 2B WORK
ZONE
PHASE 2 WORK ZONE:
CONTRACTOR TO PROVIDE TEMPORARY BARRIER
BETWEEN B343 AND DD2. BARRIER SHALL EXTEND
FROM DD FLOOR TO PLATFORM LEVEL. BARRIER
TO REMAIN IN PLACE UNTIL CONSTRUCTION
ACTIVITIES ARE COMPLETED.
MAJOR WORK ITEMS, PHASE 2:
-CONSTRUCT TEMPORARY BARRIER
-SALT WATER CONTROLS
-REMOVE EXISTING STEEL COATING
SYSTEM
-STEEL REPAIRS
-APPLY NEW COATING SYSTEM TO STEEL
-CONCRETE REPAIRS
BID OPTIONS
-REPAIR LIGHTING (MEZZANINE LEVEL)
-REMOVE/REPLACE TEMPORARY WOODEN
WALL (MEZZANINE LEVEL)
PHASING NOTES, PHASE 2:
-ALL PHASE 2 MAJOR WORK ITEMS SHALL
BE LIMITED TO THE WORK ZONE
FOOTPRINT INDICATED ON THIS SHEET.
-CONTRACTOR PERSONNEL SHALL NOT
ENTER THE DRY DOCK BEYOND THE
WORK/LAYDOWN ZONE INDICATED ON
THIS SHEET
ACCESS TO ELEVATOR MUST BE MAINTAINED
THROUGHOUT CONSTRUCTION.
MEZZANINE LEVEL SHOWN, DRY
DOCK FLOOR SIMILAR. SEE
SECTION VIEW.