18Q0212-01_questions_180412.docx

DOCX document 15 KB Posted

Attached to
Dive Boat 60DS1501 Engineering and Design Services Federal contract opportunity
Solicitation number
N3904018Q0212
Issued by
Department of the Navy Naval Sea Systems Command

About this file

18Q0212-01 questions 180412

View the file

Other files for this federal contract opportunity

Other files attached to Dive Boat 60DS1501 Engineering and Design Services, newest first.
File Type Posted
18Q0212-01_Request_for_Quote_Sheet_180412.doc DOC document
18Q0212_Drawings_Binder_180406.pdf PDF
18Q0212_Request_for_Quote_Sheet_180406.doc DOC document
18Q0212_Combined_Synopsis_180406.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3904018Q0212-01 Questions & Answers

04/12/2018

Q1) Period of Performance is: Award date +60 days. (estimated 4/9/18-6/9/18); please correct the date.

A1) Those dates are old; apologies for missing that in the revision. The POP is still award+60 days.

Q2) The solicitation states that Security Requirements: 52.204-2 & DD254 may be applicable. Please advise as to is or is not applicable.

A2) The security language was removed from the FBO notice, as I believe it will not be applicable.

Q3) What are the "Ideas" layers in reference to Autocad?

A3) This is an acronym that means “Integrated design and engineering analysis system,” which means that the plans should consider all changes to all systems involved. A little more detail can be found here: https://www.sae.org/publications/technical-papers/content/680728/.

Q4) Would PNS permit a contractor to obtain NMD-R access post award?

A4) PNS does not have access to the system, and is not aware of the timeline required to gain access to NMD-R. There is a document online (found at the link below) that contains help desk phone numbers for user accounts (on slide 36), that may be used to gain more information. http://www.portengineerprogram.org/CP06-4-NMD-Planning/html5.html.

If it takes a long time to gain access, it would be inadvisable to wait until after award to pursue access. At the close of the POP, all tasks must be complete; this includes publishing the finished product to NMD-R.

Q5) A5)