SOW_Classic_80574003.doc

DOC document 35 KB Posted

Attached to
500 KW Classic and New Design Commutators
Solicitation number
N3904018Q0173
Issued by

About this file

Statement of Work Classic Design Commutator

View the file

Other files

File Type Posted
SF18_RFQ_Document.pdf PDF
Procedures_New_80574002.doc DOC document
SOW_New_80574002.doc DOC document
Procedures_Classic_80574003.doc DOC document
SOW_New_80574001.doc DOC document
Procedures_New_80574001.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

STATEMENT OF WORK

Work consists of disassembly, data recording, and manufacturing 500 KW commutators. The commutators, government furnished material (GFM), will have already been removed from their shafts. The GFM will be supplied to the contractor as an example of the commutators to be manufactured by this procedure. The front and back clamp rings may be reused on the new commutators provided they are suitable for reuse. The commutator core barrel shall be manufactured new. All copper and insulating materials shall be replaced. All studs, nuts, washers and locking plates shall be replaced. The commutators shall be completely stripped, re-insulated, copper bars replaced, spin seasoned, electrically tested, machined, and balanced in accordance with the Commutator Refurbishment Procedure enclosed. A separate copy of the Commutator Refurbishment Procedure, Enclosure I Part II, shall be completed for each commutator refurbished.

1. The refurbishment of the 500 KW commutators called for in this procedure can be performed without reference to any original equipment manufacturer (OEM) armature drawings. The refurbishment of these commutators must meet the specifications in the Commutator Refurbishment Procedure herein.

2. The contractor is to complete and forward a detailed commutator data and dimension sheet on the first commutator refurbished during initial disassembly. The data sheet is to be forwarded to the Portsmouth Naval Shipyard (PNS) contracting official for review and approval prior to reassembly. Subsequent commutators are to be compared to the original data sheet during disassembly. Any discrepancies are to be noted and forwarded to PNS.

3. The commutators to be refurbished by this procedure are to be built to the dimensions of the original commutator data sheet that was completed by the contractor, and the dimensions provided in the Commutator Refurbishment Procedure enclosed.

4. In the event no carcass is available for refurbishment, all parts will be manufactured new in accordance with this procedure. These commutators will be completed within 45 calendar days of the request from PNS in writing.

5. Dimensional tolerances unless otherwise specified in the contract shall be the same as standards used for high quality commutator manufacture and/or the “Twenty Eighth Edition of Machinery’s Handbook”.

6. The contractor awarded the contract shall notify PNS prior to subcontracting any of the work such as, segment manufacture or commutator balance or spin seasoning to a different contractor. PNS reserves the right to verify the subcontractor has extensive experience in the field. In the event that PNS deems the subcontractor unqualified, the subcontractor shall not be used.

7. The commutator contractor shall contact the local Defense Contract Management Agency (DCMA) representative and PNS Technical Point of Contact 10 days prior to shipment of the commutators so that an on site representative can review the refurbishment data before shipment. The local DCMA and/or a PNS representative shall also be allowed to do spot checks on the commutators during manufacturing to ensure that the requirements of the contract are being followed.

Encl (1) Part (1)