Attachment_7_QASP_Matrix.pdf
PDF 31 KB Posted
- Attached to
- Non-Subsafe Outside Machinists Federal contract opportunity
- Solicitation number
- N39040-17-T-0100
About this file
QASP Matrix
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N39040-17-T-0100-0004_Amendment.pdf | ||
| N39040-17-T-0100-0003_Amendment.pdf | ||
| N39040-17-T-0100-0002_Amendment.pdf | ||
| N39040-17-T-0100.pdf | ||
| N39040-17-T-0100-0001.pdf | ||
| Attachment_6_QASP_Non-Subsafe.pdf | ||
| Attachment_1_Manning_Table.pdf | ||
| Attachment_5_PAST_PERFORMANCE_INFORMATION_FORM.pdf | ||
| Attachment_4_Past_Performance_Report_Form.pdf | ||
| Attachment_8_SOW__FBO_Attachment.pdf | ||
| Attachment_3_Status_Report_Requirement.pdf | ||
| Attachment_2_DD_254.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN, (MATRIX)
OUTSIDE MACHINIST TRADE FOR NON-SUBSAFE WORK
IN SUPPORT OF US NAVY’S SUBMARINE MAINTENANCE PROGRAM
ABOARD SUBMARINES
Deliverable or
Service Requirement
Measurement/ Metric
Performance Standards Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met
Workforce Training / Qualifications
Quality
Timeliness
Responsiveness
Contractor shall provide and maintain quality personnel who meet all training requirements as identified in Paragraph 2.1.2 of the Performance Work Statement
(PWS).
Contractor shall provide and maintain quality personnel who meet all outside machinist skill requirements as identified in Paragraph 2.1.1 of the PWS.
Contractor shall submit verification of personnel qualifications as identified in Paragraph 2.3.2 of the
PWS.
All training records shall be provided to Portsmouth Naval Shipyard (PNS) Training Department at least one week prior to a personnel’s travel date as identified in Paragraph 2.3.2 of the
PWS.
Contractor’s ability to respond to concerns with workforce personnel as well as the approach used to resolve problems.
0%
100% Verification of all Training Records by PNS training department.
Positive performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance
Negative performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance
Contracting officer will review all documented performance reports prior to exercising options. Inability of the contractor to meet required standards of PWS and this document may result in options not being exercised.
All positive and negative findings will be reported in the Contractor Performance Appraisal Rating System (CPARS).
OUTSIDE MACHINIST TRADE FOR NON-SUBSAFE WORK
Requirement
Measurement/ Metric
Performance Standards Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met
Workforce Performance
Contractor workforce shall perform all tasks detailed in in Paragraph
2.1.1. Work instructions shall be
issued as required throughout the term of the contract.
The contractor shall be required to have the appropriate number of personnel per shift as detailed in Paragraph 1.4 of PWS.
Contractor shall maintain a stable work force with minimum turnover of personnel.
All required tasks shall be completed in accordance with project schedules.
Contractor’s ability to respond to performance/quality and scheduling concerns and approach used to resolve problems.
5% error rate of hours per month
10% turnover of personnel per life of contract
Customer Feedback
Unannounced inspections by the COR and/or technical point of contact
100% review of all monthly reports
Weekly/bi-weekly meeting between PNS resource/contracting departments and contractor
100% verification of time and attendance records via
SUPDESK
report and included in the contract file for future evaluation of past performance
Negative performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance
Contracting officer will review all documented performance reports prior to exercising options. Inability of the contractor to meet required standards of PWS and this document may result in options not being exercised.
All positive and negative findings will be
OUTSIDE MACHINIST TRADE FOR NON-SUBSAFE WORK
Requirement
Measurement/ Metric
Performance Standards Maximum Error Rate
Method of Surveillance
Procedures to be taken when performance standards are met/not met
Management Performance
Contractor management shall manage worker assignment to projects and shifts, provide oversight, resolve conflict, discipline, maintain onboard counts, attendance, time-off, manage travel, maintain a safe work environment and work performance as specified in Paragraph 2.3 of PWS.
Contractor management / supervision shall be required to immediately report all injury or near-miss to PNS as specified in paragraph 2.3.5.
Contractor management shall present weekly status reports for review at status meetings
Contractor’s ability to respond to safety and discipline concerns and approach used to resolve problems.
Customer Feedback
Unannounced inspections by the COR and/or technical point of contact
100% review of all monthly reports
Weekly/bi-weekly meeting between PNS resource/contracting departments and contractor report and included in the contract file for future evaluation of past performance
Negative performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance
Contracting officer will review all documented performance reports prior to exercising options. Inability of the contractor to meet required standards of PWS and this document may result in options not being exercised.
All positive and negative findings will be
| IN SUPPORT OF US NAVY’S SUBMARINE MAINTENANCE PROGRAM |
| IN SUPPORT OF US NAVY’S SUBMARINE MAINTENANCE PROGRAM |
| IN SUPPORT OF US NAVY’S SUBMARINE MAINTENANCE PROGRAM |
File details come from the government source that posted it. Updated .