QASP_Matrix_-_Haki_Roof.pdf

PDF 9 KB Posted

Attached to
HAKI Roof Systems Rental
Solicitation number
N39040-16-T-0165
Issued by

About this file

QASP Matrix

View the file

Other files

File Type Posted
16-T-0165_RFQ_SF18.pdf PDF
Attachment_2_CAP.doc DOC document
QASP_-_Haki_Roof.pdf PDF
Attachment_1_Parts_List.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment (A)

QUALITY ASSURANCE SURVEILLANCE PLAN, (MATRIX)

HAKI ROOF SYSTEM

IN SUPPORT OF US NAVY’S SUBMARINE MAINTENANCE PROGRAM

ABOARD 688 CLASS SUBMARINES

Deliverable or Service

Requirement

Measurement/ Metric

Performance Standards Maximum Error Rate

Method of Surveillance

Procedures to be taken when performance standards are met/not met

Haki Roof System

Quality

Timeliness

Responsiveness

Contractor's ability to provide and maintain all equipment identified in Section C of the contract.

Delivery of equipment must be on time per the contract.

Within twenty-four (24) hours of initial notification of the need for repair, the Contractor shall have a technician on the job-site to repair the rental equipment. The defective unit(s) shall be repaired within forty-eight (48) hours of initial notification or, if the original defective unit(s) cannot be made operational, replaced within seventy-two (72) hours of initial notification.

0%

Inspections conducted by Contracting Officer’s Representative (COR) and/or Technical POC

Customer feedback

Positive and negative performance by the Contractor will be recorded accordingly in the COR monthly report and included in the contract file for future evaluation of past performance.

File details come from the government source that posted it. Updated .