135 FootBoomlift: JLG 1350SJP Telescopic Boom Lift
The lift must have foam filled tires. The lift must be equipped with a generator that provides 120VAC power to allow for the use of tools in the basket and on the ground. The units shall be self-propelled hydraulic boom lifts with a 135 foot platform height. The manlift shall be capable of being lowered
I ' into the dry-docks by an overhead crane without special handling gear. The contractor shall provide a sketch for th~ unit rented which includes lifting/rigging configuration, weight, and center of gravity location. OEM fall protection anchorages for two Workers shall be provided in personnel basket, these anchorage points will be clearly marked.
·CUN 1. The rental period will be 7 continuous months between April 1, 2016 and October 31, 2016.
GUN 2, Betweef\l the months of November 2016andtf1-\tl 2017 it is anticipated that we (PNSY) will heed the 135 foot manlift for shorter periods of work. The actual time the man lift will be rented for is unknown. The minimum period would be 1 Monfu.
A. Government intended use is for maintenance of cranes, facilities, utilities, dry-dock repairs, and submarine work. Rental will be on a firm fixed price regardless of the hours used.
B. The contractor shall maintain a stringent maintenance program in accordance with Manufacturers' recommendations, applicable American National Standard (ANSI) specifications and Scaffolding
Industry Association (SIA) specifications. Contractor shall be responsible for all preventative maintenance (PM) and repairs, except for daily checks of liquid levels. The unit shall have no visible fluid leaks during operation or sitting idle. Upon completion of regularly scheduled PMs, contractor will
1 , ·1eave a copy of the completed maintenance/inspection record with the point of contact. All preventive maintenance/inspection records must clearly show what maintenance/inspection has been performed
~nd must be signed and dated by the individual who performed the maintenance/inspection. A statement or certification to the effect that maintenance has been performed will not suffice. The record must reveal the actual elements of inspection and maintenance being performed. Up to date
. inspections will be kept with the equipment at all times. It is the sole responsibility of the contractor to insure ·preventive maintenance on all boom lifts is kept up to date. If records are not up to date and records are not ~rovided as set forth in these specifications, the equipment will be inoperable to the government and the government will not pay for the downtime caused by inadequate or incomplete records. The contractor shall provide forty-eight (48) hour notification to the Government prior to providing preventative maintenance of the boom lift on site. During the course of the re.ntal period the government may request that the boom lift be swapped out if there is an increase in frequency of
'breakdowns.
C. The equipment shall be delivered in fully functional, safe operating condition. The contractor will deliver equipment with the aforementioned certification records that demonstrate the equipment maintenance is up to date with current standards listed in this contract. This will require the equipment to be delivered with the annual maintenance inspectidn and any subsequent periodic
Inspections as applicable. In addition, the contractor shall provide an operation and safety manual
'and a manual of responsibilities with each boom lift. A joint inspection of each lift shall be performed by the Contractor and a shipyard licensed operator using enclosure (2) of NAVSHIPYD PTSMHINST
I ' 11262.2 before the unit is accepted by the Government. The equipment acceptance will be delayed if the accurate paperwork is not delivered and the invoice will be adjusted accordingly. The rental period does not begin until the government has accepted the boom lift. The contractor shall notify the
Contracting Officer's Representative (COR) or Technical Point of Contact a minimum of 48 hours prior to delivery of units.
I ,, I i
135 Foot Boomlift: JLG 1350SJP Telescopic Boom Lift
b. The contractor shall be responsible for repair of any equipment failure not arising out of abuse or negligence by the Government. In the event of a breakdown, service shall be provided within four (4) hours of notification to the contractor. In the event the equipment cannot be returned to service within twenty-four (24) hours, causes a work stoppage or major disruptibn to schedules, a replacement shall be provided by the contractor at no charge to the Government. Contractor shall validate all
'completed repairs to the boom lifts by providing a completed/signed repair order. Contractor shall provide 24 hour service.
I ~ i
I
I .
The point of contact and 24 hr service number as follows:
I I I
I ,.
I
Point of Contact for reporting the trouble calls is:
.Contractor's name:
. Location:\
POC:
24 hour service telephone:
~· During routine maintenance, or emergency breakdown repairs, the contractor shall provide liquid spill protection to the ground surface. All spills shall be contained and cleaned up prior to leaving the
~ite. If spill is caused by a broken or leaking liquid line or some other system on the contractor's equipment, the shipyard spill team will be alerted to contain the spill until the contractor can make the
~ecessary repairs. It shall be the responsibility of the contractor to reimburse the Government for containing the spill. If hydraulic leaks become frequent the government may request to have the '' equipment removed from the shipyard and replaced with a different manlift.
i
f. The offerer's listed model/make/manufacturer and type of man lifts may not be substituted for duration of the ,contract period, unless approved by the Portsmouth Naval Shipyard Contracting
Office. The specific model required is listed. The contractor will be required to give an initial one time training session on each new model delivered for familiarization with the man lift, if requested. This
.~raining must be conducted by a trainer/instructor certified/authorized by the manufacturer.
G. Transportation - All delivery and pick-up charges are the responsibility of the contractor.
The criteria set forth in this solicitation has in mind the utmost importance on safety of operator's and c;tssistant workers in the use of this equipment. There are significant costs to the Portsmouth Naval
Shipyard in training for safety and operational features of manlift aerial equipment. The Portsmouth
Naval Shipyard has determined it necessary, both in financial aspects and readiness factors, to
~tandardize the training for aerial man lifts. Because of the significant costs of training and the