N39040-16-T-0048_-_All_Attachments_-_Binder1.pdf
PDF 671 KB Posted
- Solicitation number
- N39040-16-T-0048
About this file
N39040-16-T-0048 - All Attachments
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N39040-16-T-0048_Solicitation.pdf | ||
| 16-T-0048_FBO_pre_solicitation_notice_REV_1-26-16.docx | DOCX document | |
| 16-T-0048_FBO_pre_solicitation_notice_12-21-15.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE I: TPBLST MACHINERY & EQUIPMENT SCHEDULE
ID SYS IDENTIFIER START END WKS
P01 PBLST-T DDC [2 DRUM]–N 25 Apr '16 Mo 16 Sept '16 Th 21 A 1ST of 2 Option To 30 Sept ’16 Fr 2
P02 PBLST-T DDC [2 DRUM]–N 25 Apr '16 Mo 16 Sept '16 Th 21 A 2ND of 2 Option To 30 Sept ’16 Fr 2
P03 PBLST-T VRU [QUIET]–N 25 Apr '16 Mo 16 Sept '16 Th 21 B 1ST of 2 Option To 30 Sept ’16 Fr 2
P04 PBLST-S VRU [QUIET]–N 25 Apr '16 Mo 16 Sept '16 Th 21 B 2ND of 2 Option To 30 Sept ’16 Fr 2
P05 PBLST-T BMR [3 DRUM]–2 25 Apr '16 Mo 16 Sept '16 Th 21 C 1ST of 4 Option To 30 Sept ’16 Fr 2
P06 PBLST-T BMR [3 DRUM]–2 25 Apr '16 Mo 16 Sept '16 Th 21 C 2ND of 4 Option To 30 Sept ’16 Fr 2
P07 PBLST-T BMR [3 DRUM]–2 25 Apr '16 Mo 16 Sept '16 Th 21 C 3RD of 4 Option To 30 Sept ’16 Fr 2
P08 PBLST-T BMR [3 DRUM]–2 25 Apr '16 Mo 16 Sept '16 Th 21 C 4TH of 4 Option To 30 Sept ’16 Fr 2
P09 PBLST-S BMR [1 DRUM]–1 25 Apr '16 Mo 16 Sept '16 Th 21 D 1ST of 3 Option To 30 Sept ’16 Fr 2
P10 PBLST-S BMR [1 DRUM]–1 25 Apr '16 Mo 16 Sept '16 Th 21 D 2ND of 3 Option To 30 Sept ’16 Fr 2
P11 PBLST-S BMR [1 DRUM]–1 25 Apr '16 Mo 16 Sept '16 Th 21 D 3RD of 3 Option To 30 Sept ’16 Fr 2
P12 PBLST-B TANK [MANF]–8 25 Apr '16 Mo 16 Sept '16 Th 21 E 1ST of 1 Option To 30 Sept ’16 Fr 2
Note: For this Project, P12 as a GROUP quantity is EIGHT various types of Tank Manifolds.
PBLST–T (TANK) PBLST–S (SHT TILE) PBLST–B (BOTH TANK & SHT TILE)
TEMP EXTRA HP (X-HP) HYDROSTATIC BLAST – TANK TEMP EXTRA HP (X-HP) HYDROSTATIC BLAST – SHT TEMP EXTRA HP (X-HP) HYDROSTATIC BLAST – TANK & SHT
N39040-16-T-0048 - Attachment 1 - Specifications
A LEASE SPECIFICATION — OVERVIEW OF REQUIREMENTS
TABLE A1: PARTICULATE BLAST MACHINERY & EQUIPMENT REQUIREMENTS
ITEM ID QTY IDENTIFIER PERFORMANCE CAPACITY TRANSITION(S) REMARK / NOTE / COMMENT
A P01 P02
EA
DDC [2 DRUM]–N
PRIMARY UNIT
FLOW1: ≥12K cfm @ 10" WG FLOW2: ≥10K cfm @ 14" WG MOTOR: ≥40 hp & Low Speed
DUCT: FLEXAUST
® FSP Bridge
AIR: 16"Ø × 2 inlet
WYE: 16"Ø : 8"Ø × 2
QTY: @ 2 wyes each
DUCT:16"Ø×25' @ 4
SPEC ¶D1: DRY DUST COLLECTOR
SOUND ATTENUATION
SEMI-FLEX DUCTING
UTILITY: ELECTRIC ≤60A & LPA
B P03 P04
EA
VRU [QUIET]–N
VAC: ≥2300 cfm @ 27" Hg MOTOR: ≥150 hp & Low Speed NOISE: ≤85 dB[A] @ 5 feet FILTER: HEPA ≥99.97η @ 0.3μm
AIR: 6"Ø × 1 inlet
(SUCTION)
SPEC ¶D2: VACUUM RECOVERY UNIT
SOUND ATTENUATION
HEPA FILTRATION
UTILITY: ELECTRIC ≤200A & LPA
C P05 P06 P07 P08
EA
BMR [3 DRUM]–2
BLAST: #5 ≈250cfm × 2 nozzle VAC: ≥700 cfm @ 20" Hg
VOL: V1 ≥ 23 CF / V2 ≥ 15 CF
FILTER: 4 ea @ 1.5:1 air / cloth
AIR: DOUBLE outlet
SIZE: ≤ 9 FT × ≤ 5 FT
SPEC ¶D3: BLAST-MEDIA-RECOVERY
THOMPSON VALVE
II
NON-STANDARD HOPPER
UTILITY: ELECTRIC 110V & LPA
D P09 P10 P11
EA
BMR [1 DRUM]–1
BLAST: #5 ≈250cfm × 1 nozzle VAC: ≈440 cfm @ 20" Hg
VOL: V1
≥ 6½ CF / V2
≥ 3½ CF
FILTER: ? ea @ #.#:1 air / cloth
AIR: SINGLE outlet
SIZE: ≤ 7 FT × ≤ 4 FT
SPEC ¶D3: BLAST-MEDIA-RECOVERY
THOMPSON VALVE
II
STANDARD HOPPER IS OK
UTILITY: ELECTRIC 110V & LPA
E P12
GP
TANK [MANF]–8
QTY: 4
LARGER ▌4 SMALLER
CAP: 2 CU FT ▌1 CU FT
SPRT: VERTICAL ▌HORIZ
MISC: WHEELS ▌HANDLES
AIR: 150 psig WP PRI: valve 1in+1out SEC: valve × 6 out
RMK P1: TANK MANIFOLD [GENERIC]
RMK P2: TANK MANIFOLD [SPECIFIC]
TABLE A2: PARTICULATE BLAST ABBREVIATIONS (PER MIL–STD–12D)
PARTICULATE BLAST (PBLST) MACHINE OR EQUIPMENT:
[# DRUM] Drum(s); i.e. the quantity that the unit is designed to accept below the hopper;
BMR [ # ] Blast (B) / Media (M) classification / vacuum Recovery (R) combined machine, [ # ] minimum quantity for actual or nominal drum capacity for unit operation;
DDC Dry Dust Collector (for industrial vacuuming and dust collection);
LS | HS Low Speed motor i.e. ≈1750 rpm (±50) | High Speed motor i.e. ≈3500 rpm (±100);
HP / HTM High Pressure [3,000 psig] & High Temperature [Hot Water or Steam];
PWU Pressure Washer Unit;
TANK separate funding SWLIN for TDD of the Main Ballast and Interior Tanks;
TILE separate funding SWLIN for TDD for repair of a submarine's exterior surface;
TPBLST Temporary Particulate Blast Systems that support Blast & Paint operations;
VRU Vacuum Recovery Unit.
PARTICULATE BLAST DETAILS:
[EXH-C] Clean Air Exhaust [EXH-D] Dirty Air Exhaust [EXH-F] Fume Exhaust [EXH-P] Particulate Exhaust Aft Aftwards (to the back) Fwd Forwards (to the front) LT LOT defined in TABLE A1 Mid Middle (of the ship) Port Port (to the left) Stbd Starboard (to the right) DD Flr Drydock Floor
Capacity Identifier: –G: Gigantic –X: Extra Large –L: Large –N: Normal –M: Medium –S: Small –B: 06-5-Ph I BASE Identifier: PNSY: Portsmouth Naval Shipyard, NH NLON: New London, CT NBPL: Naval Base Point Loma, CA
COMMENTS (Roman Numeral):
I NOZZLES: For the two supporting large capacity LPA compressors (1500 cfm × 2 each = 3,000 cfm) to be capable of providing sufficient air to all then most of the users, the Shipyard must install brand new No. 5 nozzles having 5/16-inch diameter orifices (≈250 cfm when new then increasing × 11 ≥ 2,750 cfm) on all eleven (11) BMR outlets prior to their use followed by a complete replacement mid-way through the duration of the overhaul.
A LEASE SPECIFICATION — OVERVIEW OF REQUIREMENTS (REMARKS as enumerated)
P1 TANK MANIFOLD [GENERIC]: The function of the Low Pressure Air (LPA) Tank Manifolds are several: (a) they act as accumulators closer to the point-of-use, thus, smoothing out the low-high pressure peaks; (b) they increase the overall reservoir capacity of the accompanying air tank associated with the Blast and Paint (B&P) large capacity compressors (LPAC [V/RAD]–L); (c) with its pass-thru function, they support the linear type distribution of the LPA;
and (d) as a manifold, they support the spider type distribution of the LPA to the various Blast and Paint (B&P) machines and operators. The envisioned setups are a Forward Low Pressure Air Distribution System dedicated to only support Blast and Paint operations (FWD LPA−B&P) connected to two each LARGER capacity plus two each SMALLER capacity Tank Manifolds all of which is supported by its dedicated (FWD) compressor (LPAC [V/RAD]–L) and an Aft LPA Distribution System (AFT LPA−B&P) of similar configuration. All Air Tank Manifolds (a.k.a. Air Receiver Tanks), whether of a LARGER capacity or a SMALLER capacity, shall incorporate the following salient features: (1) 150 psig Working Pressure; (2) a Primary or Main Inlet and a Primary or Main Outlet, positioned either on opposing ends for tanks meant to be laid flat horizontally or the Inlet near the top on the side opposite the Outlet near the bottom for tanks meant to be standing vertically; (3) six each Secondary or Branch Outlets, positioned either three on each side for tanks meant to be laid flat horizontally or around the side circumference near the top and generally evenly spaced for tanks meant to be standing vertically; (4) all Inlets and Outlets shall have Ball type valves of specified sizes plus operators and terminate in a specified size & type coupling with a plastic or metal cap−plug to maintain its cleanliness and for the protection of the coupling in its cross-country shipping or local transit; (5) all Tank Manifolds shall be prepared with the size valves and the size and type of end fitting couplings as specified in the Table below followed by a thorough cleaning and/or painting of the tanks; and
(6) a series of pictures of each capacity type of tank (LARGER and SMALLER) shall be sent to the Technical Liaison.
TABLE P1: TANK MANIFOLD INLET / OUTLET VALVES AND COUPLINGS (SIZES AND TYPES)
NO CAPACITY PRIMARY OR MAIN: INLET & OUTLET SECONDARY OR BRANCH: OUTLETS (ONLY)
2 CF = LARGER VALVE THREAD VALVE THREAD
1 CF = SMALLER SIZE − TYPE SIZE − TYPE SIZE − TYPE SIZE − TYPE
1 LARGER: 3-INCH − BALL 3" – CAM &
GROOVE
1¼-INCH − BALL 1¼-INCH − UNION
2 SMALLER: 1¼-INCH − BALL 1¼-INCH – NPT
UNION
¾-INCH − BALL 5/8-INCH−
HANSON
NOTE: Nowhere in any rental equipment should Chicago fittings (Surelock, Air King, etc.) be used.
P2 TANK MANIFOLD [SPECIFIC]: As a Group (GP), the quantity and type of Tank Manifolds is identified in TABLE A1:
PARTICULATE BLAST MACHINERY & EQUIPMENT REQUIREMENTS (Row E). All of the larger two cubic foot tanks shall be a vertical-stand type with a moisture drain at the bottom and a wheeled (T-type handle on top) version of similar look and construction. All of the smaller one cubic foot (pony) tanks shall be a horizontal-stand type and a dual-handled version of similar look and construction.
A LEASE SPECIFICATION — OVERVIEW OF REQUIREMENTS (NOTES based on ITEM)
A−D SOUND ATTENUATION PACKAGE (MUFFLER): In the most recent lease of a machine with a Sound Attenuation Package, the suction of smoldering embers such as smoking material caused ignition of either foreign particulate matter and/or Air Dryer Muffler filtration substances resulting in a catastrophic explosion. All suction type air-handling machinery featuring a Sound Attenuation Package (i.e. Air Dryer Muffler) such as the Dry Dust Collector (DDC) and Vacuum Recovery Unit (VRU) to include the abrasive Blast, Media classification, and vacuum Recovery unit (BMR) shall have its muffler thoroughly cleaned of all particulate matter, if not substantially replaced, and then inspected. Because of the continuous non-stop use of the machine for at least six months, serious consideration should be given to either recharging the desiccant material within the muffler, replacing the filter element / cartridge, or entirely replacing the Air Dryer Muffler. The Air Dryer Muffler filter element shall feature dual-stages for longer element life with less noise and a relief mechanism that is triggered to divert the air directly to atmosphere should the outflow become obstructed from particulate matter.
A−D MACHINERY QUALITY CHECKLIST: A Quality Checklist unique for each machine type shall be developed, abided to in every operational check, and copies shall accompany the machine and sent to the Technical Liaison.
ALL VENDOR IDENTIFICATION (ID) OF ITEMIZED AND ANCILLARY (W/ MACHINERY) EQUIPMENT: The Contractor shall uniquely tag and permanently mark all of its ancillary and itemized equipment / hardware (e.g. manifolds, hose assemblies, pipe fittings, duct adapters, ducting, cabling, etc.) so as to differentiate from that owned by either the Shipyard or other Vendors. Tagging alone is often insufficient. Suggest painting the ferrous metal on hardware and the end fittings on hose assemblies with unique and distinct color(s) associated to that Vendor.
ALL MACHINERY / EQUIPMENT MARKING & TAGGING: The Particulate Blast Outlets (PBOs) for all major devices as well as other utility line(s) must be clearly marked unless self-evident. Machinery and itemized equipment require tagging to show Project Boat No / Technical Specification Identification (ID) No (i.e. SSN 723 / P##).
NBPL ELECTRICAL CABLE: Each electrically powered high voltage machine (i.e. 460 VAC) shall include a single length of at least fifty feet (50') for each phase plus ground of appropriately rated electrical cable. Electrical power cables shall be single-conductor copper, mineral-insulated 90ºC or better (e.g. Type R90 / RW90 / T90 Nylon).
Electrical cables shall have ends that are compatible to the machine's panel-mounted cam-lock connectors.
There shall not be a separate fee for electrical cables so furnished. The Shipyard will install and electrically connect the rental equipment to the appropriate power source.
[LPAC] If a machine requires more than 400 Amps (e.g. LPAC [ELEC]–L), then include multiple cables for each phase.
NBPL COMMERCIAL DELIVERY ACCESS: There are two independently secure areas that commercial vehicles must gain access in order to effectuate delivery. The first is the main Base and the second is the Enclave (Pier 5002) which is within the Base. The best method to gain access to the Base is via a Rapid Gate badge (info:
877.727-4342). A Project Sponsor would be required if the truck driver or repair technician does not have a Rapid Gate badge. The Sponsor will need to request a Vetting Form from Richard D. Ramirez (619.553-9136).
After the Sponsor has submitted the completed Vetting Form to RD Ramirez or other staff, it will take seven to ten days for the Vetting process to be completed. After the Vetting process has been completed, a one day Temporary Pass to gain access to the main Base will be available at Bldg 174. Further access into the Enclave will require continuous escort. However, if the individual(s) have Rapid Gate badge(s), the Sponsor can submit an Enclave Access Request Form to RD Ramirez so that the badge(s) will be encoded. This would allow vehicle access into the Enclave without an escort. Considering the aforementioned difficulty in gaining Base / Enclave access, it is highly encouraged that the Contractor utilizes transport Vendor(s) with Rapid Gate badged drivers to the point of transferring locally (at San Diego) either the driver or the trailer load for the final destination delivery of machinery / equipment transported cross-county. Also, because of the CONTRACTUAL
REPAIR REQUIREMENTS which would not allow for an extended Vetting process (see paragraph B5.), the Contractor must have, for each machine under lease, qualified service and repair technicians with Rapid Gate badges.
B LEASE SPECIFICATION — CONTRACTUAL REQUIREMENTS
1. ACCESS: To be allowed onto a government Shipyard, personnel must be US citizens and in possession of appropriate personal identification. Proof of US citizenship may be necessary and can be required for access to the drydock environs. Allowable documentation of US citizenship is an official government issued Certificate of Birth or Naturalization (w/ raised seal & not a photocopy) or a US passport (can be expired). Vehicular access requires a non-expired personal Driver’s License and appropriate vehicle identification or registration. The transport vehicle must have the company’s name / logo prominently displayed. Normal commercial delivery access to NBPL: (see NOTE) is from 5:30 am to 5:00 pm Monday thru Friday (excludes Federal Holidays). To gain access to the drydock environs, personnel must be escorted and possess / wear their own personal safety gear which includes: safety glasses w/ side protection, hard hat, safety shoes with an ANSI approved reinforced toe box, and, as posted, adequate hearing protection (i.e. ≥20 dB[A] reduction from ear plugs and/or ear muffs).
2. DELIVERY: The machinery shall be in a fully-charged, fully-assembled, ready-to-use, and in a first-class-operating condition. Disposable type filters shall be replaced with new (virgin) and permanent (metal) filters shall be clean prior to delivery. The machinery with its support equipment shall be delivered to the site on or prior to the request date. It is incumbent and the responsibility of the Contractor to either confirm or coordinate the date and time of delivery prior to each shipment via the Contracting Officer's Representative (COR) and/or Point-of-Contact (POC) as designated on the Contract. The Government can provide forklift services for removing machinery from Vendor’s transport during work hours (NBPL: 6A to 3:30P). Documentation [B/L] shall accompany each delivery.
Machines shall be functionally tested to include performance of the Quality Checklist prior to its delivery.
3. LITERATURE: Although the Bidder shall make known any variances to the Technical Specifications, synopsized literature describing the proposed machinery, i.e. Equipment Data Sheet (EDS), shall be submitted with the bid to Contracting for potential review by the Technical Liaison as to whether the proposal conforms to the requirement.
4. PROPOSAL: As a standard format for comparing potential Vendors, the Contractor shall quote the weekly lease rate for each Item type and capacity based on a minimum lease duration of sixteen (16) consecutive weeks or as scheduled in the RFP, whichever is less, with the option to extend thereafter. Daily extensions for each Item with its associated ancillary hardware shall be billed at no greater than one-seventh of the stated recurring weekly lease rate. The Contractor’s proposal shall provide credit for any down time beyond forty-eight (48) hours (two days). The cost of shipping (round trip), hook-up, start-up, initial operation, and training shall be included as part of the lease. If an unforeseen circumstance that is not the fault of the Contractor results in the rental period for a particular Item being less than the aforementioned minimum / scheduled lease duration, then the obligation by the Government shall be either for its minimum / scheduled lease duration or the lease rate for the actual rental period plus due consideration for the transport company's actual shipping fees. Price comparison is based on the Government's approximation as to the expected lease duration to include anticipated EXTENSIONS (EXT).
5. REPAIR: The Contractor shall formally (written, E-mail is sufficient) inform the Contracting Officer, Supervisory Contract Administrator, and/or applicable Contract Specialist. The PNS Administrator Point-of-Contact / COR, if above $150K; and the Project's Operation (PEPM) / Execution (TSZM) POCs; as well as display on each machine the name and telephone number for requesting repair. The equipment will be operating around-the-clock under a rigorous off-site deployment performance schedule. Within twelve (12) hours (half-day) of initial notification of the need for repair, the Contractor shall have a knowledgeable and equipped technician on the job-site fully prepared to repair the rental equipment. The defective unit(s) shall be repaired within twenty-four (24) hours (one day) of initial notification or, if the original defective unit(s) cannot be made operational, replaced within forty-eight (48) hours (two days) of initial notification. If the equipment failure is not the fault of the Government, the Contractor shall bear all costs associated with its repair and/or replacement.
6. RETURN: The Government will dismantle the equipment and provide a temporary storage location convenient for Contractor pick-up. The Government will notify the Contractor as well as the Contracting Office as to when the rental Item has been released and is available for pick-up. The last day of the rental period shall be the next normal workday after the Contractor has been so notified. The Contractor shall be responsible for shipping. The Government can provide forklift services during work hours for placing the equipment onto the vendor’s transport.
7. SERVICE: Except for daily surveillance checks i.e. liquid levels, the Contractor is responsible for and shall perform all maintenance (e.g. refrigerant charge, oil changes, replace / clean filters, lubrication, coolant refills, liquid top-offs, etc.) for the duration of the lease. Coordinate maintenance w/ Executing POC particularly shut-downs.
8. START-UP: If requested by the Project, the Vendor shall: (i) start and run the equipment to verify its operability;
(ii) confirm that a set of operating instructions was previously delivered; and/or (iii) instruct designated Shipyard personnel on how to properly run the equipment to include its operation, control, daily checks, & service contacts.
For multiple sets of comparable equipment with essentially similar operation, the orientation given to a specific Project on a particular type and/or capacity of machine can be accomplished just once regardless of delivery.
C LEASE SPECIFICATION — GENERIC MACHINERY REQUIREMENTS
1. CONSTRUCTION: Except as noted for a particular machine type, units shall be a single integrated framed structure manufactured as a complete entity to include all devices, accessories, and fittings necessary to perform the function for which it was designed. Each unit shall be capable of continuous, year-round, outdoor, unmanned operation even at minimal loading while exposed from inclement (NBPL) to extremely harsh (PNSY & NLON) weather (e.g. deep snow, strong & gusty winds, and/or heavy rain) and varied ambient conditions (–10 to +110ºF & 0 to 100% RH). Machines shall meet State and federal requirements for its type such as the National Electrical Code (NEC) for electrical devices / components and the American Society of Mechanical Engineers (ASME) for pressurized vessels / components. For emission producing machinery as required by the State, the Contractor shall obtain permits for the duration of the lease and affix them onto the units. Machines shall be modular in design so as to act as a stand-alone unit; compact so as to fit in the tight confines of a drydock; portable so as to be transported by forklift and then lifted by crane; and ruggedly constructed so as to endure a marine industrial environment. Multiple machines of the same type and capacity shall be of similar design and construction.
Machines shall be newly manufactured / completely refurbished and factory tested within ten (10) years.
2. DOCUMENTATION: Documentation will be located within a water proof case affixed to each machine. Minimally, the documentation shall consist of: (i) Technical Instructions (TIs) such as an Operations & Maintenance Manual, Controls Manual, and/or Electrical Manual with Schematics; (ii) instructions and a diagram on Lifting & Handling the equipment with its padeye(s) Certification; (iii) government Contract Number to include the cover sheet to the rental Contract; (iv) an Equipment Data Sheet (EDS), preferably on a single sheet of paper (can be double-sided), of the quintessential aspects of the rental machine to include a fan curve for machines with built-in air-handlers; (v) simple Operating Instructions, if not in the TIs; (vi) points of contact with telephone numbers for requesting emergency repair regardless of the time or type of day; and (vii) a copy of the Quality Checklist.
3. ELECTRICAL: Electrical components shall conform to a NEMA standard (NEMA 3 or 4) that allows for unsheltered outdoor use of the unit. Each machine shall require only one type / source of electrical power of either 115 VAC +5% / single-phase / 60 hertz or 460 VAC +5% / three-phase / 60 hertz. The type of electrical power required (voltage & amperage) must be clearly indicated on the outside of the equipment, readily detected, and collocated with all other electrical information. If not included in the synopsized EDS, the Vendor shall provide the Project Technical Liaison with the following details: (i) electrical power type (amperage & voltage); (ii) type of electrical connectors (for 3 Φ, specify whether or not equivalent to Duraline E1016); (iii) breaker type/size or recommended capacity for the electrical source; and (iv) whether the machine is furnished with over-current protection. Three phase powered (i.e. 460V) machines shall have panel-mounted male cam-lock connectors equivalent to a single Duraline E1016 for each phase if ≤285A (preferred, permits 2/0 cable) or ≤385A (minimum, but restricted to 4/0 cable) or below and equivalent multiple connectors for greater amperages.
4. LIFTING & HANDLING: Unless exempted in advance, machines shall be firmly attached to a single rigid metal (steel if ≥3K#) caged frame (base boxed w/ four vertical corner posts and four horizontal perimeter beams at top) with both multiple slots for forklift handling and, preferably, welded lifting padeye(s), which would result in and permit for safe single point lift operation using an overhead crane without special lifting or handling gear. To minimize a rigging delay or postponement, lifting points other than the preferred welded lifting padeye(s) (e.g. holes drilled thru structural members or bolted padeyes / eyelets) will require an advance design review - consultation -analysis by the Shipyard's Rigging Engineer (Code 713). The design safety factor for each lifting padeye or point shall be at least five (5) times the load based on ultimate strength. For equipment with two (2) or three (3) padeyes / points evenly spaced, the machine’s weight can be considered equally distributed. For equipment with four (4) padeyes / points, the loading shall be as if each lift point would support half of the machine’s weight. The strongest preference is for multiple padeyes to be aligned in the plane of the lift (i.e. padeyes point towards the center) and to be located above the machine’s Center of Gravity (CG). If the lift points are located below the CG, then the machine’s CG shall be accurately indicated as to both its elevation and position. The Contractor shall provide certification that each lift point meets the criteria described above by design (5 to 1 ultimate strength & 3 to 1 minimum yield) or by load test (2 to 1 w/ no yield). Such certification to include the Lifting Schematic along with any other lifting data shall be included with the documentation attached to the machine.
NOTE: The precise weight of each machine to include its caged frame shall be prominently displayed.
5. NOISE: When operating at full speed, noise levels must not be over 105 dB[A] (assumes hearing protection of 20 dB[A]) and preferably, 85 dB[A] or less (threshold for hearing protection) at six feet from the unit or frame unless a quieter noise level is specified. A hearing protection safety placard shall be posted on each machine generating more than 85 dB[A] at the unit's edge or frame. For equating noise ratings of a particular unit, noise intensity (energy) is cut in half, i.e. reduced by 3 dB[A], as the distance is doubled. Hence, a noise rating of 88 dB[A] at 3 feet and conversely, a noise rating of 82 dB[A] at 12 feet is equivalent to a noise intensity of 85 dB[A] at 6 feet.
6. PROHIBITION: For a nuclear shipyard with radiological controls, the colors yellow or magenta on either machinery or associated equipment are strictly prohibited unless approval is requested w/ pictures showing the colors prior to bid submission so that the particular machine / equipment color would be known for an RC List of Exceptions.
D LEASE SPECIFICATION — SPECIFIC MACHINERY REQUIREMENTS (BY MACHINE TYPE)
1. DRY DUST COLLECTOR (DDC): DDC [2 DRUM]–N
a. Description: The machine shall be designed for the relatively lighter-duty collection (i.e. suction) of air contaminated by airborne dry dust. An equivalent machine meeting the specified performance requirements for the normal capacity (40 Hp) with [extendable legs designed to accept one or two each drums at the discharge outlet hopper] Dry Dust Collector (DDC [2 DRUM]–N) is the 12K cfm CYCLONE
™ as manufactured by Industrial Vacuum Equipment Corporation® or the 10K cfm M10 Dust Collector as manufactured by ECS.
b. Capacity & Utilities:
(1) Airflow: An integrated blower (air-handler) is required for independent operation of the unit in which the blower shall be a centrifugal type fan and motor. With the blower operating at full speed, the airflow in cubic feet per minute (cfm) combined with either the fan's external Total Static Pressure (TSP) in inches of Water Gauge (WG) and/or the motor's power rating in horsepower shall be as stated in Table A1.
(2) Electricity: Electrical power shall be 460 volts nominal (440 volts minimum), three phase, 60 hertz. The electric motor for the blower shall be a low speed, high efficiency, industrial type rated for at least forty horsepower (≥40 hp). Because of limited power, the unit shall be designed for protection via no greater than a 60 ampere circuit breaker. Thus, the motor must have soft-start capability.
c. Filtration: The unit shall be furnished with pre-installed brand new virgin (clean) filters. The filter elements for the Dry Dust Collector shall be a highly efficient excellent moisture resistant media such as a QX grade cellulose or pleated polyester and not paper. The collection efficiency of the filter elements shall be 99.9% or better by weight on uniform flow of particles of one micron in size or larger based on a standard performance test procedure as provided by ASHRAE. The filter housing shall be easily accessed such as via a quick-release type mechanism and the filters shall be of a type that can be readily replaced such as by cartridge elements. To ensure most dirt and debris is removed upon change-out, filter elements / cartridges shall be replaced either via top loading or such that they do not pass through the clean air plenum. The unit shall feature a pulse jet style cleaning system. In the parlance of filtration vis-à-vis "air to cloth ratio", the lower the value for the ratio of the machine's rated airflow in cfm [air] to the equivalent surface area of filtration material in square footage [cloth] the better and shall be no higher than five ([air] ÷ [cloth] ≤ 5.0). The minimum equivalent filtration area for a nominally rated 10K cfm Dry Dust Collector is thus, 2K SF (10K cfm ÷ 5.0).
d. Control: The unit shall include a permanently mounted control board accessible without opening any panels with pressure gauge(s) and other indicators as necessary for monitoring and control. The unit shall be completely wired for safety, capacity, and operation such as a power/switch system with circuit breakers, manual/automatic controller, motor overload protection, high/low pressure cut-outs, energy control system, and/or other essential components. The unit shall be fully controllable under a wide range of loads even though the diurnal and seasonal ambient temperatures vary greatly. This particular Dry Dust Collector's NEMA 4 instrument panel shall incorporate a soft-start package for the motor so as to diminish the power surge during start-up; ON-OFF power switch with indicator light; emergency STOP power button; ON-OFF air pulse switch; manual outlet dampers; an inlet air regulator; and a magnehelic gauge.
e. Design & Construction: Preferably, the bottom of the dust collection bin or hopper shall be an inverted double pyramid shaped structure having a fifty degree slide slope or steeper that dumps directly into two discharge outlets without the need of an auger and each of the two outlets shall be complete with an adjustable fifty-five gallon drum cover (manual crank) with an attached flexible hose connecting the hopper to the top of the cover and a manual outlet slide gate or damper with protective screen. If not as preferred and described above, then a manually operated auger is necessary to push the collected debris to a single drum.
When the Dry Dust Collector legs are extended, the height of the discharge outlet shall allow for easy installation and removal of a standard fifty-five gallon drum on a standard pallet (i.e. ≥40").
f. Sound Attenuation: This particular Vacuum Recovery Unit shall incorporate a sound attenuation package as an integral part of the unit's design. After its original construction, the machine shall have been tested by a firm independent of the manufacturer for sound emission compliance. The test data shall demonstrate that sound levels do not exceed 85dB[A] at a distance of five feet from the skid when the machine is operating under full load at a minimum of five perimeter locations. Sound data must be submitted with the proposal.
g. Options: The Dry Dust Collector shall include four each sixteen inch diameter by twenty-five foot lengths of high suction pressure (4 ea: 16"Ø × 25'L × ≥5"Hg) semi-flex ducting w/ wearstrip (i.e. FLEXAUST
® FSP Bridge).
h. Transition: The machine's process air inlet and/or outlet piece shall accommodate round flexible ducting to fit onto its external circumference as dimensioned in Table A1. The dimension provided in the table is a nominal size to reflect the inside dimension of the flexible ducting. Actual outside diameter (OD) dimension for the metal transition fitting shall be one-quarter inch less (−¼") with a one-eighth inch tolerance (±⅛") for sheet metal (e.g. 16" = 15¾"±⅛"). For protection / cleanliness, removable weather covers are required.
2. VACUUM RECOVERY UNIT (VRU): VRU [QUIET]–N
a. Description: The machine shall be designed for the heavy-duty recovery (i.e. vacuum) of spent dry or wet blast grit type matériel, whether that be steel shot (typically 237 lb / cubic foot) or "Black Beauty" (e.g. coal or boiler slag), from various surfaces. An equivalent machine meeting the specified performance requirements for the normal capacity (150 Hp) with [sound attenuation] Vacuum Recovery Unit (VRU [QUIET]–N) is the 2350 cfm QUIET CUBE
™ as designed & manufactured by Industrial Vacuum Equipment Corporation®.
b. Capacity:
(1) Airflow & Vacuum Pressure: The vacuum portion of the machine shall be capable of producing at least twenty seven inches of mercury or greater (≥27"Hg) as well as producing at least two thousand three hundred cubic feet per minute at that suction pressure (≥2,300 cfm @ 27"Hg).
(2) Extraction: The rate of extraction shall be at least six to eight tons per hour (6-8 tn/hr) dependent on the density of the blast matériel.
(3) Distance & Lift: The minimum conveyance shall be four hundred feet (≥400') with a minimum vertical lift to the classifier / recycler or collection tank from the suction end of the hose of seventy feet (≥70').
c. Utilities: The machine shall require only two types of utility connections – electricity and pneumatic air.
(1) Electricity: Electrical power shall be 460 volts nominal (440 volts minimum), three phase, 60 hertz. The electric motor for the blower shall be a low speed, high efficiency, industrial type rated for at least one hundred fifty horsepower (≥150 hp). Because of limited power, the unit shall be designed for protection via no greater than a 200 ampere circuit breaker. Thus, the motor must have soft-start capability.
(2) Pneumatic Air: Pneumatic air requirements shall be Low Pressure Air (LPA) no greater than ninety psig (≤90 psig) at a relatively low volume for its rate of consumption.
d. Filtration: The unit shall be furnished with pre-installed brand new virgin (clean) filters. The filter elements for the Vacuum Recovery Unit shall be HEPA type with a MERV rating of 17 or better equivalent to the ASHRAE Standard 52.2 Particle Size Removal Efficiency of equal to or better than 99.97η for a particle size of 0.3 micrometer. This unit shall feature cyclonic separation and a continuous reverse pulse filter cleaning system.
e. Control: The unit shall include a permanently mounted control board accessible without opening any panels with pressure gauge(s) and other indicators as necessary for monitoring and control. The unit shall be completely wired for safety, capacity, and operation such as a power/switch system with circuit breakers, manual/automatic controller, motor overload protection, high/low pressure cut-outs, energy control system, and/or other essential components. The unit shall be fully controllable under a wide range of loads even though the diurnal and seasonal ambient temperatures vary greatly. This particular Vacuum Recovery Unit's NEMA 4 instrument panel shall incorporate a soft-start package for the motor so as to diminish the power surge during start-up; ON-OFF power switch with indicator light; emergency STOP power button; ON-OFF air pulse switch; ON-OFF material dump switch; ON-OFF vacuum pressure switch; and a disconnect lever.
f. Design & Construction: This particular Vacuum Recovery Unit shall be of a positive displacement design;
incorporate an automatic cone vibrator; and include a manhole (typically 10"Ø) for inspecting the loading bin.
The unit shall not require liquids of any type either for cooling or for vacuum production. Recycled air will not be used in the vacuum production. Air from the discharge silencer will not be recycled, but rather, vented to atmosphere.
g. Sound Attenuation: This particular Vacuum Recovery Unit shall incorporate a sound attenuation package as an integral part of the unit's design. The unit shall have dual inlet and discharge silencers to include a sound attenuation enclosure. After its original construction, the machine shall have been tested by a firm independent of the manufacturer for sound emission compliance. The test data shall demonstrate that sound levels do not exceed 85dB[A] at a distance of five feet from the skid when the machine is operating under full load at a minimum of five perimeter locations. Sound data must be submitted with the proposal.
h. Transition: The machine's process air inlet and/or outlet piece shall accommodate round flexible ducting to fit onto its external circumference as dimensioned in Table A1. The dimension provided in the table is a nominal size to reflect the inside dimension of the flexible ducting. Actual outside diameter (OD) dimension for the metal transition fitting shall be one-quarter inch less (−¼") with a one-eighth inch tolerance (±⅛") for sheet metal and three-sixteenths inch tolerance (±3/16") for hard pipe (e.g. 5" nominal pipe ≡ 6" ducting).
3. BLAST, MEDIA CLASSIFIER, & VACUUM RECOVERY (BMR): BMR [3 DRUM]–2 & BMR [1 DRUM]–1
a. Description: The BMR machine is a combined abrasive Blast (B), Media (M) classification, and vacuum Recovery (R) unit a.k.a. "Vacuum & Blast" (VB) or "Blast & Recovery System" (BRS) machines. An equivalent machine meeting the specified performance requirements for the BMR [1.2K]–2 dual outlet (2 person unit) is the VB–1200 as originally designed and manufactured by IPEC Advanced Systems, Inc. and since modified or refurbished and for the BMR [0.5K]–1 single outlet (1 person unit) is the BRS–3.5 as manufactured by Axxiom Manufacturing, Inc.
b. Capacity & Utilities:
(1) Pneumatic Air: Pneumatic air requirements shall be Low Pressure Air (LPA) no greater than ninety psig (≤90 psig) at a volume for its rate of consumption.
c. Control: The unit shall include a permanently mounted control board accessible without opening any panels with pressure gauge(s) and other indicators as necessary for monitoring and control. The unit shall be completely wired for safety, capacity, and operation such as a power/switch system with circuit breakers, manual/automatic controller, motor overload protection, high/low pressure cut-outs, energy control system, and/or other essential components. The unit shall be fully controllable under a wide range of loads even though the diurnal and seasonal ambient temperatures vary greatly.
d. Design & Construction: The Blast (B) portion of the machine shall be a stacked assembly in which the top volumetric unit (V1) is a Reclaimer Storage Hopper (a.k.a. Storage Hopper or Media Reclaimer). This tank shall process or recycle abrasive "media" such as steel grit via both an air wash system and a turbine vibrator sleeving system resulting in high quality for the reclaimed material. The bottom volumetric unit (V2) of the stacked assembly shall be an ASME coded single "Chamber" pressure "Vessel" a.k.a. "Blast Pot" with outlet(s), quantity as specified, capable of being connected to a deadman type remote via a pneumatic line (deadman remote & pneumatic line NOT REQUIRED). For blasting, the "Vessel" or "Blast Pot" is pressurized. When additional abrasive media is needed, the blast "Chamber" or "Pot" is depressurized via a conveniently positioned "blowdown" type valve and the chamber is then refilled from the "Storage Hopper" above. The Media (M) classification system shall be integrally connected to the Storage Hopper and the vacuum Recovery (R) mechanism. Abrasive to be recycled can be vacuumed into the top of the Media Reclaimer Storage Hopper where it falls onto a vibrating screen. The dust and fine grit particles that remain suspended in the air shall be drawn into a dust collection type mechanism. Reclaimed or "cleaned" abrasive shall fall through the vibrating screen into the Storage Hopper. Debris and paint chips shall be retained by the screen whereupon it may be removed either manually or via the vacuum hose attached to the dust collection type mechanism. The vacuum Recovery (R) mechanism shall use urethane eductor pump(s) to generate a vacuum (negative) pressure with airflow. The filter elements and/or cartridges shall be automatically purged via self-cleaning pulse jets while vacuuming. Additional filter purging shall be accommodated via a switch to engage the dust collector mechanism.
e. Options: The Blast / Media classification / vacuum Recovery (BMR) machines shall meter each outlet with the 1¼" Thompson Valve® II with tungsten carbide sleeve metering valve as designed / manufactured by Schmidt and Axxiom Manufacturing, Inc. The multiple design improvements of this second generation Thompson valve such as a larger aperture allowing for improved media flow into the air stream as well as instant and smooth response to pneumatic deadman controls makes this feature a must for the units. At the oulet(s) to the BMR machine, the Contractor need not provide the vacuum blast gun a.k.a. "head" or "nozzle", nor outer brushes, nor pneumatic hose, nor deadman's switch(es). Such extra hardware will be supplied by the Government.
f. Transition: None.
CONTRACT ADMINISTRATION PLAN (CAP)
FOR FIXED PRICE CONTRACTS
In order to expedite the administration of this contract, the following delineation of duties is provided. The names, addresses and phone numbers for these offices or individuals are included elsewhere in the contract award document. The office or individual designated as having responsibility should be contacted for any questions, clarifications, or information regarding the administration function assigned.
1. The Procuring Contract Office (PCO) is responsible for:
a. All pre-award duties such as solicitation, negotiation and award of contracts.
b. Any information or questions during the pre-award stage of the procurement.
c. Freedom of Information inquiries.
d. Changes in contract terms and/or conditions.
e. Post award conference.
2. The Contract Administration Office (CAO) is responsible for matters specified in the FAR 42.302 and DFARS
42.302 except those areas otherwise designated as the responsibility of the Contracting Officer's Representative (COR) or someone else herein.
3. The paying office is responsible for making payment of proper invoices after acceptance is documented.
4. The Contracting Officer's Representative (COR) is responsible for interface with the contractor and performance of duties such as those set forth below. It is emphasized that only the PCO/CAO has the authority to modify the terms of the contract. In no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the contractor and any other person be effective or binding on the Government. If in the opinion of the contractor an effort outside the scope of the contract is requested, the contractor shall promptly notify the PCO in writing. No action may be taken by the contractor unless the PCO or CAO has issued a contractual change. The COR duties are as follows:
a. Technical Interface
(1) The COR is responsible for all Government technical interface concerning the contractor and furnishing technical instructions to the contractor. These instructions may include: technical advice/recommendations/clarifications of specific details relating to technical aspects of contract requirements;
milestones to be met within the general terms of the contract or specific subtasks of the contract; or, any other interface of a technical nature necessary for the contractor to perform the work specified in the contract. The COR is the point of contact through whom the contractor can relay questions and problems of a technical nature to the
PCO.
(2) The COR is prohibited from issuing any instruction which would constitute a contractual change.
The COR shall not instruct the contractor how to perform. If there is any doubt whether technical instructions contemplated fall within the scope of work, contact the PCO for guidance before transmitting the instructions to the contractor.
b. Contract Surveillance
(1) The COR shall monitor the contractor's performance and progress under the contract. In performing contract surveillance duties, the COR should exercise extreme care to ensure that he/she does not cross the line of personal services. The COR must be able to distinguish between surveillance (which is proper and necessary) and supervision (which is not permitted). Surveillance becomes supervision when you go beyond enforcing the terms of the contract. If the contractor is directed to perform the contract services in a specific manner, the line is being crossed. In such a situation, the COR's actions would be equivalent to using the contractor's personnel as if they were government employees and would constitute transforming the contract into one for personal services.
N39040-16-T-0048 - Attachment 2 - CAP
(2) The COR shall monitor contractor performance to see that inefficient or wasteful methods are not being used. If such practices are observed, the COR is responsible for taking reasonable and timely action to alert the contractor and the PCO to the situation.
(3) The COR will take timely action to alert the PCO to any potential performance problems. If performance schedule slippage is detected, the COR should determine the factors causing the delay and report them to the PCO, along with the contractor's proposed actions to eliminate or overcome these factors and recover the slippage. Once a recovery plan has been put in place, the COR is responsible for monitoring the recovery and keeping the PCO advised of progress.
(4) If the Contractor Performance Assessment Reporting System (CPARS) is applicable to the contract you are responsible for completing a Contractor Performance Assessment Report (CPAR) in the CPARS Automated Information System (AIS). The initial CPAR, under an eligible contract, must reflect evaluation of at least 180 days of contractor performance. The completed CPAR, including contractor comments if any, (NOTE: contractors are allowed 30 days to input their comments) should be available in the CPARS AIS for reviewing official (PCO) review no later than 270 days after start of contract performance. Subsequent CPARs covering any contract option periods should be ready at 1-year intervals thereafter.
c. Invoice Review and Approval/Inspection and Acceptance
(1) The COR is responsible for quality assurance of services performed and acceptance of the services or deliverables. The COR shall expeditiously review copies of the contractor's invoices or vouchers, certificate of performance and all other supporting documentation to determine the reasonableness of the billing. In making this determination, the COR must take into consideration all documentary information available and any information developed from personal observations.
(2) The COR must indicate either complete or partial concurrence with the contractor's invoice/voucher by executing the applicable certificate of performance furnished by the contractor. The COR must be cognizant of the invoicing procedures and prompt payment due dates detailed elsewhere in the contract.
(3) The COR will provide the PCO and the CAO with copies of acceptance documents such as Certificates of Performance.
(4) The COR shall work with the Contractor to obtain and execute a final invoice no more than 60 days after completion of contract performance. The COR shall ensure that the invoice is clearly marked as a “Final Invoice.”
d. Contract Modifications. The COR is responsible for developing the statement of work for change orders or modifications and for preparing an independent government cost estimate of the effort described in the proposed statement of work.
e. Administrative Duties
(1) The COR shall take appropriate action on technical correspondence pertaining to the contract and for maintaining files on each contract. This includes all modifications, government cost estimates, contractor invoices/vouchers, certificates of performance, DD 250 forms and contractor's status reports.
(2) The COR shall maintain files on all correspondence relating to contractor performance, whether satisfactory or unsatisfactory, and on trip reports for all government personnel visiting the contractor's place of business for the purpose of discussing the contract.
(3) The COR must take prompt action to provide the PCO with any contractor or technical code request for change, deviation or waiver, along with any supporting analysis or other required documentation.
f. Government Furnished Property. When government property is to be furnished to the contractor, the COR will take the necessary steps to insure that it is furnished in a timely fashion and in proper condition for use.
The COR will maintain adequate records to ensure that property furnished is returned and/or that material has been consumed in the performance of work.
Enclosure (1)
g. Security. The COR is responsible for ensuring that any applicable security requirements are strictly adhered to.
h. Standards of Conduct. The COR is responsible for reading and complying with all applicable agency standards of conduct and conflict of interest instructions.
i. Written Report/Contract Completion Statement.
(1) The COR is responsible for timely preparation and submission to the PCO, of a written, annual evaluation of the contractors performance. The report shall be submitted within 30 days prior to the exercise of any contract option and 60 days after contract completion. The report shall include a written statement that services were received in accordance with the Contract terms and that the contract is now available for close-out. The report shall also include a statement as to the use made of any deliverables furnished by the contractor.
(2) If the Contractor Performance Assessment Reporting System (CPARS) is applicable to the contract you are responsible for completing a final Contractor Performance Assessment Report (CPAR) in the CPARS with 30 days of contract completion.
(3) The COR is responsible for providing necessary assistance to the Contracting Officer in performing Contract Close-out in accordance with FAR 4.804, Closeout of Contract Files.
5. The Technical Assistant (TA), if appointed, is responsible for providing routine administration and monitoring assistance to the COR.