N3319121R4006 Naples Mirco MACC.pdf
PDF 1018 KB Posted
- Attached to
- Naples Micro MACC Federal contract opportunity
- Solicitation number
- N3319121R4006
About this file
This is a solicitation for a Multiple Award Construction Contract (MACC) issued by the Department of the Navy Naval Facilities Engineering Command. The solicitation seeks proposals for indefinite delivery/indefinite quantity-type contracts to complete general building projects such as road repair, building renovation, roofing, and utility work at Naval Support Activity Naples, Italy. The contracts would have a one-year base period and four optional one-year extensions, not exceeding five years total or $25 million in aggregate task order value. Task orders would range from $10,000 to $1 million each and be fixed price in nature. Offerors must submit technical proposals by January 25, 2021 outlining their design-build team, experience, past performance, and technical approach, which will be evaluated. The top-rated offerors will then submit price proposals to be considered in the best value determination along with non-price factors such as experience and past performance. The government aims to award approximately five contracts under this solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Naples Micro MACC Amendment 0003 29 JAN 2021.pdf | ||
| Amendment 0002 for Naples Micro MACC.pdf | ||
| Solic Amend 0001 for Naples Micro MACC change prop due date.pdf | ||
| ATTACHMENT 2A PP.pdf | ||
| ATTACHMENT 1 CD Exp.pdf | ||
| ATTACHMENT 2B.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5752202
N33191-21-R-4006, DESIGN-BUILD/DESIGN-BID-BUILD MULTIPLE AWARD CONSTRUCTION CONTRACT (Micro MACC) FOR NEW
CONSTRUCTION, RENOVATION, ALTERATION AND REPAIR PROJECTS, NSA NAPLES, ITALY
GENERAL DESCRIPTION: Construction projects to be performed w ill primarily consist of general building type projects (new construction, renovations, alterations, demolition, repair w ork, and any necessary design) including: road repair; pavement repair; building renovation;
roofing; excavation; emergency repairs; providing new finishes on the interior of buildings; w ater lines and gas line construction and repair;
all utility repairs including sanitary sew er and storm drainage; all f ire protection repairs, dormitory, community support facilities and both vertical and horizontal construction for Department of Defense activities in Naples, Italy and areas managed by NAVFAC EURAFCENT.
Duration of the contracts w ill be a 12-month Base Period w ith four (4) 12-month option periods, for a total of 60 months, or a total aggregate maximum value of $25,000,000 for all MACC task orders aw arded across all contractors – w hichever comes first. Option periods shall be executed at the Government's discretion. Task orders w ill be f irm fixed-price, normally in the range of $10,000 and $1,000,000 per task order.
OSCAR E. BECERRIL 39-081-568-4071
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
21-Dec-2020
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______150 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC EUROPE AFRICA SOUTHWEST ASIA
VIALE PORTO CAPODICHINO
NAPOLI 80144
N33191
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
39 081 568 7750FAX:TEL: 39 081 568 7750 TEL: FAX:
N3319121R4006 61
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N3319121R4006
Section 00010 - Solicitation Contract Form
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
10,000.00 1,000,000.00
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS TO OFFERORS
1.1 GENERAL OVERVIEW OF MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
A Multiple Award Construction Contract (MACC) is a contract awarded from a single solicitation, and may result in award to multiple contractors. This procurement consists of one solicitation with the intent to award approximately five (5) Indefinite Delivery/Indefinite Quantity (IDIQ) contracts to the offerors whose proposals, conforming to the
RFP, will be most advantageous to the Government resulting in the best value, price and non-price factors considered. The Government reserves the right to award less than or more than five (5) contracts, should it be deemed to be in the best interest of the Government to do so. Successful offerors will compete for future work during the term of the contract
Construction projects will primarily consist of general building type projects (new construction, renovations, alterations, demolition, repair work, and any necessary design) including: waterfront, pier, quay, industrial, airfield, aircraft hangar, infrastructure, administrative, training, retail, food service, dormitory, community support facilities and both vertical and horizontal construction for Department of Defense activities in the at Naval Support Activity
Naples and tenant activities. The MACC will provide the design (as applicable in design-build), construction, supervision, equipment, materials, labor, and all means necessary to provide complete and usable facilities. Work may be required in other areas if deemed necessary and approved by the NAVFAC EURAFCENT Chief of
Contracts.
All task orders issued under the MACC will be awarded in U.S. Dollars.
1.2 PRE-PROPOSAL CONFERENCE AND SITE VISIT
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.
(b) An organized Pre-Proposal Conference will be scheduled only for the successful offerors of Phase I.
1.3 ENGLISH SPEAKING REPRESENTATIVE
At all times when any performance of the work at the site is being conducted by an employee of the Contractor or his subcontractors, the contractor shall have a representative present on the site capable of explaining the work operations and receiving instructions in the English language. The Contracting Officer shall have the right to determine, without appeal of such decision, whether the proposed representative has sufficient technical and lingual capabilities, and the Contractor shall immediately replace any individual not acceptable to the Contracting Officer.
1.4 JOINT VENTURES (JV) AGREEMENTS
FOR THE PURPOSES OF THIS SOLICITATION, A JOINT VENTURE (JV) REFERS TO A U.S.-STYLED
FORMAL LEGAL ENTITY IN THE NATURE OF A PARTNERSHIP COMPRISED OF TWO OR MORE
PERSONS OR COMPANIES. EACH JOINT VENTURE MUST PROVIDE ONE (1) CAGE/NCAGE CODE,
ONE (1) DUNS NUMBER FOR THE JOINT VENTURE AND ONE (1) DUNS NUMBER FOR EACH MEMBER
COMPRISING THE JOINT VENTURE. EACH JOINT VENTURE MUST BE REGISTERED IN THE CCR
USING THE NAME OF THE JOINT VENTURE.
Joint Venture Offerors (JV) offerors, shall provide with their proposal a notarized legal document that establishes the JV. The JV Agreement shall take effect upon the submission of the proposal and remain irrevocable until one (1) year after the work has been finally inspected and accepted by the Government. Submission of the notarized legal document that establishes the JV shall be furnished with the proposal in its original language version along with a certified English translation of the notarized JV document. The Joint Venture must be formed and valid at the time of submission of the proposal. The validated notarized legal document must include language that each member of the JV will be jointly and severally liable for the performance of the whole contract and will be incorporated into the contract award if award is made to the JV.
1. The Joint Venture Agreement shall include, at a minimum, the following:
(a) Name of firms that form the JV and the name of the JV.
(b) Name and title of the corporate officials signing on behalf of each party.
(c) Solicitation number.
(d) Description of the responsibilities in terms of work category for each member (for example: Firm A performing 100% of design).
(e) The statement "The composition and structure of the JV will remain unchanged from award to one (1) year after contract completion.”
(f) Date of issuance of the agreement and notarized signature of the corporate officials signing in behalf of each party.
(g) Statement under oath stating that the Joint Venture(JV) is in compliance at the time of proposal submission with all applicable laws, rules, and regulations. This statement must be signed under oath by all members comprising the Joint Venture.
The U.S. Government reserves the right to review the actual JV Agreement to determine its basis and compliance with the applicable laws. Any internal agreements affecting the internal composition of the existing JV and its potential liabilities in relation to the contract (performance guarantee, insurance, etc) will be sent to the Contracting
Officer to provide notice of the same. Any change in the composition of the JV will require the JV to formally request a Novation Agreement in accordance with FAR 42.12, which will be approved/disapproved at the discretion of the Contracting Officer.
1.5 SYSTEM FOR AWARD MANAGEMENT
1. System for Award Management (SAM) registration is required for all offerors, including Joint Venture (JV) offerors (registration must state the NAME of the JV). SAM registration can be accomplished at https://www.sam.gov. Offerors not registered in SAM shall obtain a DUN & Bradstreet (DUNS) number and a
CAGE or NCAGE prior to registering in SAM.
2. A DUNS number is required for all offerors, including JV offerors. In addition to the DUNS number required for
JV offerors, JV offerors must provide a DUNS number for each member comprising the JV. DUNS numbers can be obtained at http://fedgov.dnb.com/webform. The DUNS number is required in order to register in SAM.
3. Offerors must be registered in the SAM prior to the submission of Phase I proposals.
1.6 CAGE/NCAGE CODE
1. A CAGE/NGAGE Code is required for all offerors, including JV offerors. JV offerors must acquire a
CAGE/NCAGE Code registered in the JV name.
2. U.S. Offerors, including Joint Venture offerors: U.S. offerors must obtain a CAGE Code prior to registering in the SAM database, which is part of the SAM registration process.
3. Non-U.S. (foreign) Offerors ONLY: Non-U.S. offerors must obtain a NATO CAGE (NCAGE) Code instead of a CAGE Code prior to registering in the SAM database. NCAGE codes may be obtained at the NCAGE website http://www.dlis.dla.mil/Forms/Form_AC135.asp.
http://fedgov.dnb.com/webform http://www.dlis.dla.mil/Forms/Form_AC135.asp
1.7 INSTRUCTIONS FOR THE SUBMISSION OF OFFERS
PHASE I
PHASE I NON-PRICE PROPOSAL PACKAGE SUBMITTAL REQUIREMENTS:
Proposals are due no later than Monday 25 January 2021 at 14:00 Central European Time (CET).
Offerors shall submit their proposal to Mr. Oscar Becerril at Oscar.becerril@eu.navy.mil.
Submit the Phase I Proposal with the following subject line:
“SOLICITATION N33191-21-R-4006 – NAPLES MICRO MACC – PHASE I”
Multiple e-mails may need to be sent for any of the submissions, if your e-mail exceeds 5MB. The U.S. Navy computer server will only accept e-mails with attachments up to 5MB. If you need to submit more than one e-mail for the above submission, number them at the end of the e-mail subject title as “1 of ?”, “2 of ?”, etc.
Proposals not received at the above address on or before the hour and date set for the receipt of proposals shall be considered late, subject to the provisions of FAR Clause 52.215-1 Instructions to Offerors -- Competitive
Acquisition (JAN 2004).
The NON-PRICE PROPOSAL shall include the following:
1. Cover letter in accordance with FAR 52.215-1(c)(2), including Solicitation Number; name, address, telephone and email address of the Offeror; in case the Offeror is a JOINT VENTURE (JV), the name of the
JV MUST BE CLEARLY IDENTIFIED; Name, title, and signature of the person authorized to sign the proposal; DUNS Number and CAGE or NCAGE Code of the Offeror, in case the Offeror is a JOINT
VENTURE (JV), provide a DUNS Number for each member of the JV.
2. Completed (Blocks 14 through 20c), signed and dated Standard Form (SF) 1442, Solicitation, Offer, and
Award.
3. Acknowledgement of all amendments.
4. Solicitation Section 00600, “Representations, Certifications, and Other Statements of Offerors”. Offerors shall comply with the requirements in accordance with FAR 52.204-8.
5. All information required by Factor 1, Technical Approach.
6. All information required by Factor 2, Experience.
7. All information required by Factor 3, Past Performance.
1.8 INSTRUCTIONS FOR SUBMITTING PRE-PROPOSAL INQUIRIES (PPI)
Pre-Proposal Inquiries (PPI) regarding the solicitation shall be submitted in writing via electronic mail to Oscar
Becerril, Contract Specialist, at oscar.becerril@eu.navy.mil. Pre-Proposal Inquiries shall reference the drawing/detail and/or the specification section, including paragraph number. PPIs shall be submitted in Word format. Verbal queries will not be entertained. Responses to the Pre-Proposal Inquiries will be provided as an attachment to an amendment and will be posted on the Beta SAM website at https://beta.sam.gov/. All interested mailto:oscar.becerril@eu.navy.mil https://beta.sam.gov/ firms must be registered on the Beta SAM websites in order to obtain the solicitation documents and all information regarding the solicitation. The Government may not respond to Pre-Proposal Inquiries submitted less than 10 days before the proposal receipt due date.
1.9 AMENDMENTS
Amendments will be posted to the Beta SAM website at https://beta.sam.gov/. It is highly recommended that firms register on Beta SAM as plan holders. It is the offeror’s responsibility to check the Beta SAM websites periodically for any amendments to the solicitation.
1.10 SOCIETA’ ORGANISMI D’ATTESTAZIONE (SOA) CERTIFICATION
a. Societa’ Organismi d’Attestazione (SOA) Certification Requirement. The following qualification standards shall be met by the offeror for the overall MACC:
Category Classification
OG1 IV
OG3 IV
OG6 IV
OG11 IV
Note: SOA certification requirements will vary on subsequent task orders under the MACC in accordance with the projects.
b. Submission of a SOA Certification and Article 38 of the DL 163/06 (DeLise Code). Offerors shall demonstrate that they meet the SOA certification requirements and demonstrate compliance with Article 38 of DL
163/06. An offeror shall submit the following as part of its proposal:
(1) An unexpired SOA Certificate (including joint venture partner, consortium partners or subcontractors that will be utilized to meet the qualification standard).
(2) Current self-certification documentation required by Article 38 of DL 163/06.
(3) If the potential offeror is a joint venture or a consortium, the offeror shall demonstrate how each member or partner meets the SOA certification requirements stated in paragraph (a) above. Include a description of the responsibilities in terms of work category for each member or partner (for example - Firm A performing 70% of
OG-II and Firm B performing 30% of OG-II). Each member or partner who has the SOA Certification must perform the majority of the work pertinent to the certification.
(4) An offeror's proposal will be rejected for failure to provide the current SOA certificates required under this solicitation.
In the case of a Joint Venture (JV), each member of the JV must have at least one of the required SOA
Certifications. In the case of a JV, certification submitted by a subcontractor will not be accepted.
1.11 PERFORMANCE GUARANTEE OR BOND REQUIREMENTS
https://beta.sam.gov/
The Contractor shall provide a performance guarantee or payment and performance bonds for the duration of any and all active task orders greater than $150,000 or as required by the Contracting Officer. Performance guarantee or payment and performance bonds are returned or relieved at the successful completion of any warranty period in force. The performance guarantee must be issued by duly authorized banks registered in the publicly available register held by the Bank of Italy pursuant to Legislative Decree 385/1993 as amended, i.e., the Consolidated Law on Banking (Testo Unico Bancario - TUB).
For task orders with a value greater than $30,000, but not greater than $150,000, the Contractor shall provide one of the following two payment protections:
1. Payment Bond
2. Irrevocable Letter of Credit
SAMPLE OF PERFORMANCE GUARANTEE ISSUED BY A BANK
If the Contractor chooses a bank letter of guarantee or other approved deposit, then the amount shall be no less than
10%. This sample meets the material requirements of clause NFAS 5252.228-9306, “Performance Guarantee.” The
Government will accept as valid a Performance Guarantee conforming to these requirements.
BANK LETTERHEAD
To: United States of America
U.S. Department of Navy
Naval Facilities Engineering Command, Europe Africa Southwest Asia
Viale Porto, Box 51
Aeroporto Capodichino
80144, Napoli, Italia
Attention: Contracting Officer
Date _____________
Bank Letter of Performance Guarantee No. _______
This is a letter of performance guarantee. I/We, the undersigned, acting as the duly authorized representative(s) of the Bank, declare that the Bank hereby guarantees and is jointly and severally liable as guarantor with the Contractor named below to effect payment to the Contracting Office that issued the contract stated below, by check made payable to the “United States of America by the U.S. Department of the Navy, Naval Facilities Engineering
Command Europe Africa Southwest Asia,” within five (5) calendar days after receipt of a simple written request by registered mail, return receipt, in amount up to sum of (Amount equal to ten (10%) percent of the contract amount in the currency stated in the contract), which represents the deposit required of the Contractor to guarantee fulfillment of his obligations for the satisfactory completion and timely performance of the work under Contract No. (insert contract number) for (insert description of services and location), in strict compliance with the terms, conditions and specifications of said contract entered into between the United States of America by the U.S. Department of Navy, Naval Facilities Engineering Command Europe Africa Southwest Asia and the Contractor (insert name of
Contractor) on (insert contract date), plus legal interest to be calculated from the date of receipt of the registered letter of request by the Contracting Officer to the date of actual payment, without any need for the Contracting
Officer to take any legal action or obtain the prior consent of the Contractor, or for any other proof, action or decision by any other authority. The request by the Contracting Officer shall simply inform the Bank that the
Contractor failed to comply with the terms and conditions of the contract, or did not fulfill his undertaking in whole or in part.
I/We agree and consent that said contract may be modified by change order or supplemental agreement affecting the amount or the period of performance of the contract without prior consent of the Bank and without affecting the validity of this guarantee; provided, however, that the amount of this guarantee shall remain unchanged.
This letter of performance guarantee will continue in effect without change in amount or terms until one year after the work has been finally accepted by the Government through its Contracting Officer’s legal representative.
(BANK NAME & ADDRESS) (CONTRACTOR NAME & ADDRESS)
Signed by: ___________________________ Signed by: ____________________________________
(Typed name) (Typed name)
(Title) (Title)
(This Performance Guarantee shall be accompanied by a notarized document authenticating the bank agent’s authority to sign the letter of performance guarantee for the bank company.)
1.12 ANTI-MAFIA LAW
The Offeror is responsible for complying with Italian Anti-Mafia laws with respect to its subcontractors, including, but not limited to, obtaining subcontractor C.C.I.A.A. certificates inclusive of the anti-mafia "nulla osta" statement in accordance with Art. 67 of Legislative Decree no. 159/2011; and, if necessary, requesting additional information regarding attempts of mafia infiltration from a competent Prefect (Prefetto). The Offeror agrees to provide the
Government appropriate documentation showing results of any Prefect (Prefetto) investigations. If after award, a competent Prefect (Prefetto) determines that mafia infiltration attempts have occurred with a subcontractor, then the
Offeror agrees to promptly terminate the subject subcontract and replace the mafia-colluded subcontractor at its own cost with a compliant company.
Pre-Award Effect of Anti-Mafia Procedures: Inasmuch as the work of this solicitation is to be performed on land owned by the Italian State, the prospective contractor will be subject to Italian legislation concerning anti-mafia documentation, including, without limitation: Legislative Decree no. 159 of September 6, 2011, Decree of the
President of the Republic no. 252 of June 3, 1998, Legislative Decree no. 490 of August 8, 1994 and Law Decree
No. 629 of September 6, 1982, and subsequent integrations and amendments. Only firms that submit the requested documentation will be considered for award. In the event that prior to award any mafia infiltration attempt is determined by the competent Prefect (Prefetto) against an offeror, pursuant to Art. 4 of Legislative Decree no.
490/1994 and Art. 10 of Decree of the President of the Republic no. 252/1998, no award will be made to said offeror. Furthermore, in the event that prior to award any additional information against an offeror is provided by the competent Prefect (Prefetto) pursuant to Art. 1, Section 7 of Law decree 629/1982 and Art. 10, paragraph 9, of
Decree of the President of the Republic no. 252/1998, the Government may decide, at its sole discretion, that no award will be made to said offeror.
Termination Under Decree of the President of the Republic no. 252/1998: If during the life of this contract, any mafia infiltration attempt is determined by the Prefect (Prefetto) against any component of the Contractor or any
Subcontractor, pursuant to Art 4 of Legislative Decree no. 490/1994 and Art. 10 of Decree of the President of the
Republic no. 252/1998, the Government will consider this a failure to execute the work and terminate the contractor's right to proceed with the work under the "Default" clause of this contract. If during the life of this contract, any additional information is provided by the Prefect (Prefetto) pursuant to Art. 1, Section 7 of Law
Decree 629/1982 and Art. 10, paragraph 9, of Decree of the President of the Republic no. 252/1998, against any component of the Contractor or any subcontractor, the Government at its sole discretion may consider this a failure to execute the work and terminate the contractor’s right to proceed with the work under the “Default” clause of this contract.
Documentation Requirements, Contractor shall submit the following:
If available, include the Certificato di Iscrizione alla Camera di Commercio - Original, unexpired and not older than
SIX (6) months old from the date of proposal submission from the Chamber of Commerce Certificate of
Membership (Certificato di Iscrizione alla Camera di Commercio) inclusive of the Anti-Mafia Nulla Osta statement reading: "Nulla osta ai fini dell'articolo 67 del Decreto legislativo n. 159 del 6 settembre 2011 (gia Art. 10 della legge 31 maggio 1965, n 575) e successive modificazioni. La presente certificazione è emessa dalla C.C.I.A.A.
utilizzando il collegamento telematico con il sistema informativo utilizzato dalla prefettura di Roma.
If the offeror has attempted and is unable to obtain the certificate from the Chamber of Commerce, please include an explanation why not, along with official correspondence from the Chamber of Commerce, if available. This documentation is to be included in your Price Proposal.
PART 1 GENERAL: EVAL FACTORS
PART I. GENERAL
1.1 INTENT TO AWARD WITHOUT DISCUSSIONS
The Government intends to evaluate all proposals received and award a contract without conducting discussions;
therefore, the initial proposal shall conform to the solicitation requirements and should contain the best offer from a technical and price perspective.
1.2 COMPETITIVE RANGE
If discussions are deemed necessary to maximize the Government’s ability to obtain the best value, discussions will be held with those Offerors in the competitive range. The Government may limit the number of proposals in the competitive range to the most highly rated proposals, considering price and technical merit.
1.3 ENFORCEABILITY OF THE PROPOSAL
The proposal must set forth full, accurate and complete information as required by this solicitation. The Government will rely on such information in the award of a contract. By submission of the offer, the Offeror agrees that all items proposed will be utilized for the duration of the contract and any substitutions will be equal or better than as proposed and accepted for contract award and shall require prior Contracting Officer’s approval.
1.4 PREFERENCE FOR MULTIPLE AWARDS
A MACC is a contract awarded from a single solicitation and may result in award to multiple contractors. This procurement consists of one solicitation with the intent to award approximately five (5) Indefinite Delivery
Indefinite Quantity (IDIQ) contracts to the offerors whose proposals, conforming to the RFP, represent the best value – the proposals most advantageous to the Government, price and technical factors considered. Successful offerors will compete for future work during the term of the contract.
PART II. EVALUATION FACTORS/RATING SCHEME
2.1 EVALUATION CRITERIA AND BASIS OF AWARD
The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the proposals determined to represent the best value—the proposals most advantageous to the
Government, price and other factors considered.
The Government intends to evaluate proposals and award contracts without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the
Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
The contracts resulting from this solicitation will be awarded to those responsible offerors whose offers, conforming to the solicitation, are determined to be the most advantageous to the Government considering “Price” and “Non-
Price” evaluation factors. Award may be made to other than the lowest priced offerors or other than the highest technically rated offerors. The Non-Price evaluation factors are:
Factor 1 – Technical Approach
Factor 2 – Experience
Factor 3 – Past Performance
Factor 4 – Safety
Factor 5 – Technical Solution
Non-Price Factors 1 – 3 will be evaluated in Phase I. Factor 1 will be rated Acceptable or Unacceptable. If an
Offeror is rated Unacceptable in Factor 1, then they will not be considered for Phase II. Non-Price Factors 4 and 5 will be evaluated in Phase II. In making the best value award decision after Phase II, the Government will consider
Non-Price Factors 2 – 5 and Price. The relative order of importance of the Non-Price evaluation factors is that
Technical Factors 2, 4, and 5 are equal to each other and when combined are of equal importance to the performance confidence assessment (Factor 3 – Past Performance). The combined Non-Price evaluation factors are approximately equal to price. In determining the best value to the Government, the Government need not quantify the tradeoffs that led to the best value decision.
Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal.
2.2 EVALUATION FACTORS FOR AWARD
This Two-Phase Design-Build (D-B) procurement will result in the award of approximately five (5) Indefinite
Delivery/Indefinite Quantity (IDIQ) type contracts under a Multiple Award Construction Contract (MACC) for a one-year base period with provisions for the exercise of four one-year option periods.
For this Two-Phase D-B procurement, Factors 1-3 will be evaluated in Phase I. Factor 1 will only be rated
Acceptable or Unacceptable. If an Offeror is rated Unacceptable in Factor 1, then they will not be considered for
Phase II. Factors 4 – 5 will be evaluated in Phase II.
Phase I of the solicitation is a narrowing process of offerors based on responsiveness and evaluation of non-price technical factor submittals. Based on the Phase I evaluation criteria, the most highly rated offerors will proceed to
Phase II. Phase II offerors will be required to submit both a Price Proposal and Non-Price Proposal.
The relative order of importance of the Non-Price evaluation factors is the Technical Factors – Factor 2 –
Experience, Factor 4 – Safety, and Factor 5 – Technical Solution – are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor, Factor 3. Factor 1 – Technical Approach will be rated Acceptable or Unacceptable. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the
Non-Price Evaluation Factors) are approximately equal to Price.
Phase I Non-Price Factors:
Factor 1 – Technical Approach
Factor 2 – Experience
Factor 3 – Past Performance
All ratings from Phase I will be carried into Phase II unless new or revised information is provided.
Phase II Non-Price Factors:
The distinction between experience and past performance is that experience pertains to the volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
Factor 1 – Technical Approach:
(a) Solicitation Submittal Requirements:
The composition and management of the firms proposed as the design-build (DB) team for this contract will be evaluated in this factor.
The Offeror shall submit the following information:
(1) Provide a narrative describing the proposed primary construction firms and primary design firms for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). The narrative shall also include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of an entity is being claimed in Factor 2, that entity must be named in the above narrative and organizational chart.
The technical approach narrative shall be limited to one (1) double-sided page (or two (2) single-sided pages) including the organizational chart. The information requested in item #2 below is not included in this page limitation.
(2) In addition to the narrative, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved mentor protégé agreement (MPA), or letter of commitment for each member of the Offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.).
(b) Basis of Evaluation:
The assessment of the Offeror’s technical approach will be used as a means to evaluate the organizational structure and teaming relationships proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis. An acceptable Offeror will demonstrate a depth of resources such as design-build and construction services requested under this solicitation to include but not limited to civil earthworks, vertical building, seismic renovations, mechanical and electrical systems, force protection, fire suppression and protection, , and petroleum gas pipelines and storage. Offeror shall demonstrate capabilities of developing project documents under the direction of a
Registered Architect or a Professional Engineer currently licensed in Italy. Failure to demonstrate that personnel meet the registration requirements or to meet the submittal requirements stated above, will result in an
“Unacceptable” rating.
Factor 2 – Experience:
(1) Construction Experience:
Submit a minimum of three (3) and a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. Any projects submitted in excess of the five (5) for Construction Experience will not be considered. For purposes of this evaluation, a relevant project is further defined as:
(1) One of the following project types:
(2)
a. General Contractor Services, including road repair; pavement repair; building renovation;
roofing; excavation; emergency repairs; providing new finishes on the interior of buildings;
water lines and gas line construction and repair; all utility repairs including sanitary sewer and storm drainage; all fire protection repairs
b. Structural System Services, including carpentry; maintenance, repair and replacement services on floors, floor coverings, walls, wall coverings, window repairs and replacement;
exterior systems such as roofs and gutters; structural brick work and stone and concrete masonry; sheet metal work; painting; demolition; concrete masonry; and welding;
c. Electrical Services (interior and exterior);
d. Plumbing Services;
e. Heating, Ventilation, and Air Conditioning Services - heating, ventilating, and air conditioning (HVAC) repair and replacement;
Additional Relevancy Criteria (applicable to all project types)
a) Demonstrate a similar magnitude with a construction value from $0k - $1.5M. Projects submitted for the
Offeror shall be completed within the past five (5) years of the date of issuance of this RFP. Offerors that do not submit at least one of each project type will be considered unresponsive.
b) Offerors that demonstrate multiple types, maybe considered more favorable.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;
rather Offerors must submit the work performed under a task order as a project in order for it to be evaluated.
The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and MUST be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the
Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the
Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint
Venture members. Offerors who fail to submit experience for all Joint Venture members may be rated lower.
Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies
(name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
(3) Design Experience
Submit a minimum of three (3) and a maximum of five (5) relevant design projects for the design team that best demonstrates design experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as:
(1) One of the following project types:
a. General Contractor Services, including road repair; pavement repair; building renovation;
roofing; excavation; emergency repairs; providing new finishes on the interior of buildings;
water lines and gas line construction and repair; all utility repairs including sanitary sewer and storm drainage; all fire protection repairs
b. Structural System Services, including carpentry; maintenance, repair and replacement services on floors, floor coverings, walls, wall coverings, window repairs and replacement;
exterior systems such as roofs and gutters; structural brick work and stone and concrete masonry; sheet metal work; painting; demolition; concrete masonry; and welding;
c. Electrical Services (interior and exterior);
d. Plumbing Services;
e. Heating, Ventilation, and Air Conditioning Services - heating, ventilating, and air conditioning (HVAC) repair and replacement
Demonstrate a similar magnitude with a construction value from $0k - $1.5M. Projects submitted for the Offeror shall be completed by the design team within the past five (5) years of the date of issuance of this RFP. Offerors that do not submit at least one of each project type will be considered unresponsive.
A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the
Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e., unique features, area, construction methods).
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies
(name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
The Offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. Offerors proposing multiple design firms should submit relevant project experience for all design firms. Failure to do so may result in a lower rating. Offerors are still limited to a total of five (5) projects combined.
The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects for construction and five for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design
Experience will not be considered.
Projects that contain one (or multiple) favorable factors listed below may be evaluated more favorably:
1. Relevant projects performed for the US Government and in compliance with Unified Facilities Criteria
(UFC) may be considered more favorably than those that have not been performed for the US Government.
2. Relevant projects performed in Italy may be considered more favorably than those not.
3. Relevant projects that demonstrate design-build experience may be considered more favorably than those that do not have design-build experience.
4. Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.
5. Relevant projects that demonstrate experience self-performing relevant features of work may be considered more favorably than those who do not demonstrate self-performance.
6. Relevant projects that are able to demonstrate experience in more than one of the project types may be considered more favorable.
Providing eight (8) or more relevant projects (Construction and Design combined) may be considered a strength.
Providing five (5) or more relevant projects (Construction and Design combined) which each demonstrate favorable element 1 listed above may be considered a strength.
Providing a relevant project which demonstrates three (3) or more favorable factors may be considered a strength.
Factor 3 – Past Performance:
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for construction experience. If a completed AE
Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for design experience. If there is not a completed CPARS evaluation then submit Past Performance Questionnaires (Attachment B) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance
Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The
Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact.
NOTE: Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience.
NOTE: Offerors may also address any adverse past performance issues. Explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
The Government reserves the right to contact references for verification or additional information. The
Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Performance award or additional information submitted will not be considered.
This evaluation will consider how well the Offeror’s team performed on relevant projects submitted under Factor 2 –
Experience and may also consider past performance on other projects currently documented in known sources.
More emphasis will be placed on more relevant projects, but Marginal or Poor performance on non-relevant projects may also be considered. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance
Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee
Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
The Government will consider the recency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the
Contracting Officer’s responsibility determination. The assessment of the Offeror’s team’s past performance will be used as a means of evaluating the Offeror’s team’s probability to successfully meet the requirements of the RFP.
Offerors lacking relevant past performance history will receive a NEUTRAL Confidence rating.
Past performance ratings of “Substantial Confidence” or “Satisfactory Confidence” hold more value than a “Neutral
Confidence” rating and will be considered more favorably in the evaluation of past performance.
Relevancy Rating Method
Adjectival Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .