This permanent change notice updates the specification bid package for repair of No. 1 and No. 2 Ships Service Turbine Generators (SSTGs) aboard the USS Illinois (SSN 786). The notice requires inspection and repair of the SSTGs by a qualified original equipment manufacturer's representative, including disassembly and cleaning of turbine and generator components. It also requires technical assistance during catcher bearing removal and reinstallation, modification of thrust bearing housings, installation of new materials, in-place machining and grinding of components, static and dynamic tuning of the SSTGs, and certification of completed work. The repair is to be conducted under Naval Sea Systems Command Solicitation N3225323R0004 for SSTG Repair aboard the USS Illinois.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N32253-23-R-0004. Rev3. 102423.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.
SHIP: USS ILLINOIS (SSN 786)
HRMC-504-24
ERRATA NUMBER:
SPECIFICATION NUMBER:
THE FOLLOWING ITEMS ARE REPLACED:
311-10-001
DATED: 10/24/2023 9:00:48PMPage 1 of 1 luz.thibeau Highlight
SHIP: USS ILLINOIS (SSN 786) ITEM NO: 311-10-001 (E2)
COAR: 26 PCN: EE01-L007
EE01-L008
CMP: NONE
PLANNER: UMHOLTZ, PAUL
DEFRIES, JACOB
SSP: HRMC-504-24 1 of 3 ITEM NO: 311-10-001
ERRATA NO. 2
1. SCOPE:
1.1 Title: No. One and No. 2 Ships Service Turbine Generator (SSTG);
repair
1.2 Location of Work:
1.2.1 Engine Room
1.3 Identification:
1.3.1 Quantity: (One EA), No. One, SSTG, Mfr: Northrop Grumman
1.3.2 Quantity: (One EA), No. 2, SSTG, Mfr: Northrop Grumman
2. REFERENCES:
2.1 Standard Items, FY-24
2.2 S9311-DE-MMO-010, Turbine Generator Set Technical Manual
2.3 6511E72, Steam Turbine Generator Assembly
2.4 S9G-N3B-TG-2.1, TG SETS, GDEB TEST PROCEDURE
2.5 1TS-3835, VACL SSTG Field Service THR Tuning Procedure
2.6 6511E83C, Housing, Thrust Bearing Machining THP
2.7 SHIPALT 4950D, SSTG Mag Bearing Axial Sensor and Wirewell Mod
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-90 of 2.1, for the disassembly, inspection, and repair of the equipment listed in 1.3.1 and 1.3.2, for the location listed in 1.2.1. See Note 4.1.
3.1.1 Provide the services of a qualified Original Equipment
Manufacturers (OEM) representative to disassemble, clean free of corrosion, and inspect, the No. 1 Turbine High Pressure (THP) bearing assembly, THP Radial Rotor, Turbine Low Pressure (TLP) Bearing Assy, Generator Coupling End (GCE) Bearing Assy, Turbine to Generator Coupling, Thrust Rotor, inboard and outboard Thrust Stator Assembly of the equipment listed in 1.3, for signs of overheating or defects, in accordance with the requirements of 2.2, 2.3, and OEM proprietary drawings and specifications. Record the inspection results.
3.1.1.1 Submit one legible copy, in approved transferrable
media, of a report listing results of 3.1.1 to the SUPERVISOR.
3.2 Provide 30 days of technical assistance to PHNSY in support of Catcher Bearing removal and reinstallation for the equipment listed in
1.3. Catcher Bearing work to be performed by PHNSY shipyard personnel.
(E2)
3.3 Remove existing Thrust Bearing Housing from the equipment listed in
1.3 and air freight to the OEM facility listed in 4.2 for modification in accordance with OEM proprietary drawings and specifications. Upon completion of modification return to PHNSY via air freight.
(E1)
3.3.1 Accomplish Thrust Bearing Housing air flow modifications in (E1) luz.thibeau Highlight luz.thibeau Highlight
SSP: HRMC-504-24 2 of 3 ITEM NO: 311-10-001
ERRATA NO. 2
accordance with the requirements of 2.6 and OEM proprietary drawings and specifications.
3.4 Remove existing and install new material listed in 4.5, in accordance with the requirements of 2.2, 2.3 and OEM proprietary drawings and specifications.
(E1)
3.4.1 Accomplish the requirements of 2.7 for the equipment listed in
1.3 and located in 1.2.
(E1)
3.4.2 Accomplish in-place machining and grinding to final finish, the THP Radial Rotor and Sensor target area in accordance with the requirements of 2.2, 2.3, and OEM proprietary drawings and specifications. Record final dimensional readings.
(E1)
3.4.2.1 Submit one legible copy, in approved transferrable
media, of a report listing results of 3.3 to the SUPERVISOR.
(E1)
3.5 Provide a letter which gives permission to Pearl Harbor Naval Shipyard Radiological personnel to monitor the radiation exposure of NORTHROP GRUMMAN personnel involved in the SSTG Dynamic Tuning evolution.
See Note 4.4.
(E1)
3.5.1 Provide a report listing the NORTHROP GRUMMAN personnel who will be involved in the SSTG Dynamic Tuning evolution, and their current level of radiation exposure.
(E1)
3.5.1.1 Submit one legible copy, in approved transferrable
media, of a report listing the requirements of 3.4 and 3.4.1, to the SUPERVISOR, one week prior to SSTG Dynamic Tuning.
(E1)
3.6 Accomplish SSTG Static Tuning, grooming, and SSTG testing in accordance with the requirements of 2.2 through 2.5, and OEM proprietary drawings and specifications. Record the results.
(E1)
3.6.1 Submit one legible copy, in approved transferrable media, of a report listing the requirements of 3.5 to the SUPERVISOR.
(E1)
3.7 Accomplish SSTG Dynamic Tuning and micro-balancing in accordance with the requirements of 2.2 through 2.5, and OEM proprietary drawings and specifications. Record the results. See Note 4.3.
(E1)
3.7.1 Submit one legible copy, in approved transferrable media, of a report listing the requirements of 3.6 to the SUPERVISOR.
(E1)
3.8 Upon completion of work, submit one legible copy, in approved transferrable media, of a report certifying all work has been completed.
(E1)
4. NOTES:
4.1 Known source for OEM qualified Technical Representative:
NORTHROP GRUMMAN MARINE SYSTEMS
401 E HENDY AVE
SUNNYVALE, CA 94086
Point of contact:
- Paul Bunkers, Northrop Grumman Marine Systems Manager
Cell: 757-513-7856, Email: paul.bunkers@ngc.com
- Eric Beyer, Northrop Grumman Field Service Manager
Cell: 908-635-9290, Email: eric.beyer@ngc.com luz.thibeau Highlight
SSP: HRMC-504-24 3 of 3 ITEM NO: 311-10-001
ERRATA NO. 2
4.2 Northrop Grumman Shipping Address:
NORTHROP GRUMMAN
ATTN: CHRIS MORT
500 E CALIFORNIA AVE
SUNNYVALE, CA 94086
Phone: 408-735-2490
4.3 PHNSY Shipping Address:
PEARL HARBOR NAVAL SHIPYARD & IMF
667 SAFEGUARD ST, BLDG 167 RECEIVING
JBPHH, HI 96860
ATTN: 786 SSTG, Paul Umholtz PHNSY C420, Phone: 808-726-0698
4.4 SSTG Dynamic Tuning requires reactor plant operation. NORTHROP GRUMMAN personnel are required to wear a thermo luminescent dosimeter (TLD) device during this evolution.
4.5 Bill of Materials furnished on Contract No. N32253-22-C-0011.
4.6 All interference shall be removed by ships force and PHNSY & IMF as required.
4.7 PHNSY & IMF shall provide all rigging and crane service as required.
4.8 PHNSY & IMF and ships force shall be responsible for the disposal of all solid and liquid waste generated during the execution of this contract.
5. GOVERNMENT FURNISHED MATERIAL(GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.