N32253-20-Q-0076 Q and A.docx

DOCX document 15 KB Posted

Attached to
Dive Boat Overhaul Federal contract opportunity
Solicitation number
N3225320Q0076
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N32253-20-Q-0076 Questions and Answers 1 September 2020

Q1: Are you able to provide the following references?

0. S9008-LF-MMO-010, S9008-LF-MMO-010, Class Maintenance Plan (CMP) for 25-Foot Utility Boat (UB), Hull 25UB0506

0. S9086-TX-STM-010, Naval Ships' Technical Manual Chapter 583, Volume 1, Boats and Small Craft

0. S9086-VD-STM-010 Rev 3, Naval Ships' Technical Manual Chapter 631, Preservation of Ships in Service – General

0. T9008-B4-MAN-010, Inspection and Repair Manual for Fiber Reinforced Plastic Boats and Craft

0. Liaison Action Record (LAR): GEN-1504, Alternative Paint Option for Navy Boats

0. Systems and Specifications, SSPC Painting Manual, Volume 2

0. Edgewater Power Boats, Owner's Manual, Commercial 247 Center Console

0. MIL-STD-2003, Electric Plant Installation Standard Methods for Surface Ships and Submarines

0. SEN2501, 25' Sentinel, Index of Drawings

0. SEN2502, 25' Sentinel, Outboard Profile and Arrangement

0. SEN2504, 25' Sentinel, Hoisting Arrangement

0. SEN2505, 25' Sentinel, Hull/Grid Construction

0. SEN2506, 25' Sentinel, Deck Construction

0. SEN2507, 25' Sentinel, Hull Foaming

0. SEN2508, 25' Sentinel, Small Parts Construction

0. SEN2509, 25' Sentinel, Hull Assembly

0. SEN2510, 25' Sentinel, Deck Assembly

0. SEN2511, 25' Sentinel, Final Assembly

0. SEN2512, 25' Sentinel Electrical Systems

0. SEN2514, 25' Sentinel, Miscellaneous Fabrications

0. SEN2515, 25' Sentinel, Label Plates

0. SEN2516, 25' Sentinel, Console Assembly

0. SEN2517, 25' Sentinel, Leaning Post Assembly

0. SEN2519, 25' Sentinel, Fuel Tank Cover Assembly

0. SEN2520 , 25' Sentinel, Anchor Hatch Assembly

R1: References will be provided upon email request to the POC

Q2: Are you able to provide any photos of the vessel?

R2: Pictures will be provided upon email request to the POC

Q3: Item No 583-31-001 states the vessel would be delivered within 72 hours after awarding of contract. What is the estimated contract award date? Has a final delivery date been established for this work?

R3: Anticipated contract award date will be on or before 30 September 2020. Please refer to delivery information in the RFQ: 29 January 2021.

Q4: Item No 583-11-001 states the vessel will be delivered via trailer then the Contractor will need to place it on jack stands and keel blocks. Will the trailer be taken by Government the same day the vessel is delivered?

R4: Trailer delivery and retrieval dates will be coordinated with the Contractor after award.

Q5: Item No 236-11-001 3.2 requires the installation of new gauges. Are you able to provide the specifications or part number of the new gauges.

R5: Please refer to the work package reference for part number.

Q6: Item No 631-11-001 references “Safety Walk edge sealing compound”, is 3M Safety Walk the non-skid deck covering? If not, please specify the non-skid deck covering that is to be installed.

R6: Preservation shall be in accordance with the work item and associated drawings/tech manuals.

Q7: The solicitation has a proposal due date of September 8, 2020. Is it possible to extend the proposal due date by a week to September 15, 2020, to reevaluate based on the question responses?

R7: Due to the urgency of this requirement, no extension will be provided.