J-2-Cat-A RevB.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- USNS JOHN L. CANLEY (T ESB 6) Post Shakedown Availability Federal contract opportunity
- Solicitation number
- N3220523R4083
About this file
This document contains a price breakdown spreadsheet and solicitation for a federal contract opportunity. The solicitation is for a Post Shakedown Availability for the USNS JOHN L. CANLEY (T ESB 6) being conducted by the Military Sealift Command of the Department of the Navy. The solicitation number is N3220523R4083 and responses are due by April 6, 2023 at 1:00 PM Eastern Standard Time. The price breakdown spreadsheet contains multiple categories and line items of work being solicited, but no pricing information is included. Contractors must sign a Technical Non-Disclosure Agreement to receive the work items, references and Contract Data Requirements List for the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3220523R40830009 Amendment.pdf | ||
| JLC PSA Work Package References Enclosures List.xlsx | XLSX spreadsheet | |
| 0716_A_MODIFY ARMORY A5-94-2 STOWAGE SPACE (TALT ESB-19-036).docx | DOCX document | |
| N3220523R40830008 Amendment.pdf | ||
| JLC (ESB-6) PSA Work Package INDEX (Rev 05 MAY 2023).DOCX | DOCX document | |
| N3220523R40830001 Amendment.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | PRIME Contractor | SUB Contractor | |||||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | OTHER COSTS | TOTAL LABOR HOURS | TOTAL MATERIAL and OTHER COSTS | TOTAL PRICE |
| 0000 | GENERAL SERVICES AND REQUIREMENTS | ||||||||||
| 0001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 0002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 0003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 0004 | TESTING AND QUALITY ASSURANCE | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 0005 | ELECTRICAL SAFETY PROCEDURES AND REQUIREMENTS | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 0006 | HEAVY WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 0007 | COLD WEATHER PLAN | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| 0010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | - 0 | $0.00 | $0.00 | |||||||
| 0011 | FURNISH GENERAL SERVICES | - 0 | $0.00 | $0.00 | |||||||
| 0012 | INFORMATION TECHNOLOGY SERVICES | - 0 | $0.00 | $0.00 | |||||||
| 0013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORTS | - 0 | $0.00 | $0.00 | |||||||
| 0014 | PREPARATION OF WEIGHT AND MOMENT REPORT | - 0 | $0.00 | $0.00 | |||||||
| 0015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | - 0 | $0.00 | $0.00 | |||||||
| 0016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | - 0 | $0.00 | $0.00 | |||||||
| 0017 | HANDLING SHIP'S STORES | - 0 | $0.00 | $0.00 | |||||||
| 0018 | DELIVERY AND REDELIVERY OF VESSEL | - 0 | $0.00 | $0.00 | |||||||
| 0019 | SHIPBOARD ACCESS AND SECURITY | - 0 | $0.00 | $0.00 | |||||||
| 0020 | GAS FREE CERTIFICATES | - 0 | $0.00 | $0.00 | |||||||
| 0021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | - 0 | $0.00 | $0.00 | |||||||
| 0022 | DOCK TRIALS AND SEA TRIALS | - 0 | $0.00 | $0.00 | |||||||
| 0023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | - 0 | $0.00 | $0.00 | |||||||
| 0024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP |
| SUB-TOTAL | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | $0 | |
| 0100 | HULL AND STRUCTURAL | ||||||||||
| 0102 | MACHINERY SPACE DECK UTILIZATION MODIFICATIONS | - 0 | $0.00 | $0.00 | |||||||
| 0103 | FLIGHT DECK UNDERSIDE CLEANING | - 0 | $0.00 | $0.00 | |||||||
| 0104 | MISSION DECK MOORING FITTINGS INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0105 | EXHAUST STACKS ACCESS LADDERS MODIFICATIONS | - 0 | $0.00 | $0.00 | |||||||
| 0106 | INCLINED LADDER INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0107 | WEATHERDECK A6 LEVEL PORT RAILING MODIFICATION | - 0 | $0.00 | $0.00 | |||||||
| 0108 | INTAKE PLENUM FILTER SCREEN INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0110 | MOORING CHOCKS RELOCATION | - 0 | $0.00 | $0.00 | |||||||
| 0112 | WALKWAY CATWALK PLATFORMS INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0113 | HELO HANGAR DOOR MACHINERY ACCESS PLATFORM INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0114 | LIFEBOAT FALL HAZARD MITIGATION | - 0 | $0.00 | $0.00 | |||||||
| 0115 | QUARTERDECK STATION WINDOW & WATERTIGHT DOOR INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0117 | GRATING AND INCLINED LADDER INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| SUB-TOTAL | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | |
| 0200 | PROPULSION MACHINERY | ||||||||||
| 0204 | MDE CONTROL SAFETY INSEPCTION AND TEST | - 0 | $0.00 | $0.00 | |||||||
| 0205 | AUTOMATION AND PROPULSION CONTROL INSPECTION AND TEST | - 0 | $0.00 | $0.00 | |||||||
| 0206 | MDG AND EDG VULKAN COUPLING INSPECTION | - 0 | $0.00 | $0.00 | |||||||
| SUB-TOTAL | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | |
| 0300 | ELECTRICAL | ||||||||||
| 0304 | MSC LAN EXPANSION | - 0 | $0.00 | $0.00 | |||||||
| 0305 | PLC SURVEY | - 0 | $0.00 | $0.00 | |||||||
| 0307 | BATTERY CHARGER AND INTERLOCK INSTALLATION A1 LEVEL | - 0 | $0.00 | $0.00 | |||||||
| 0308 | SHORE POWER MONITORING SYSTEM INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0309 | BRIDGE ELECTRICAL OUTLETS INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0311 | DISBURSING OFFICE MANNING ALARM INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0312 | AVIATION FUELING STATIONS JUNCTION BOX REPLACEMENTS | - 0 | $0.00 | $0.00 | |||||||
| 0353 | THERMOGRAPHIC INSPECTION | - 0 | $0.00 | $0.00 | |||||||
| SUB-TOTAL | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | |
| 0400 | COMMUNICATION AND NAVIGATION | ||||||||||
| 0406 | SHORE TELEPHONE SYSTEM EXPANSION | - 0 | $0.00 | $0.00 | |||||||
| 0407 | CCTV MONITORING SYSTEM EXPANSION | - 0 | $0.00 | $0.00 | |||||||
| 0408 | TV-DTS SYSTEM INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0409 | SITE 300 INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0411 | BOW RADAR INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0414 | AFT SCM DOOR MODIFICATION | - 0 | $0.00 | $0.00 | |||||||
| 0451 | RADARS ANNUAL SERVICE | - 0 | $0.00 | $0.00 | |||||||
| 0452 | ECDIS ANNUAL SERVICE | - 0 | $0.00 | $0.00 | |||||||
| 0453 | GYRO SYSTEM ANNUAL PM | - 0 | $0.00 | $0.00 | |||||||
| 0454 | VDR ANNUAL RECERTIFICATION | - 0 | $0.00 | $0.00 | |||||||
| 0455 | RADIO COMMUNICATIONS EQUIPMENT RECERTIFICATION | - 0 | $0.00 | $0.00 | |||||||
| 0457 | EPIRB SHORE BASED MAINTENANCE SERVICE | - 0 | $0.00 | $0.00 | |||||||
| 0460 | MANUALLY OPERATED ALARMS ANNUAL INSPECTION | - 0 | $0.00 | $0.00 | |||||||
| SUB-TOTAL | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | |
| 0500 | AUXILIARY MACHINERY | ||||||||||
| 0501 | COUNTERMEASURE WASHDOWN (CMWD) SYSTEM INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0503 | CARGO FUEL HOSE TESTING | - 0 | $0.00 | $0.00 | |||||||
| 0512 | AC CHILLER REPAIRS | - 0 | $0.00 | $0.00 | |||||||
| 0515 | DUMBWAITER INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0517 | SEGREGATE BLACK AND GREY WATER TRANSFER LINE | - 0 | $0.00 | $0.00 | |||||||
| 0518 | GREY WATER SYSTEM ISOLATION MODIFICATIONS | - 0 | $0.00 | $0.00 | |||||||
| 0519 | MISSION DECK BOAT REFUELING STATION ENHANCEMENTS | - 0 | $0.00 | $0.00 | |||||||
| 0526 | LTFW COOLER PIPING SPOOL WASTER PIECES AND VALVES INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0527 | POTABLE WATER TRANSFER PIPING SYSTEM INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0529 | ENGINE ROOM POTABLE WATER SPIGOTS INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0531 | BILGE AND WASTE OIL SYSTEM MODIFICATIONS [MARPOL PHASE-1] | - 0 | $0.00 | $0.00 | |||||||
| 0533 | MDG SHIPS SERVICE AIR HOSE REELS INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0534 | MDG START AIR RECEIVERS AUTOMATIC DRAIN VALVES INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0535 | MDG START AIR EXPANSION LOOPS STAINLESS STEEL VALVES INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0536 | ENGINE ROOM POTABLE WATER SYSTEM ISOLATION VALVES INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0537 | ENGINE ROOM GENERAL SERVICE AIR SYSTEM ISOLATION VALVES INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0554 | MACHINERY SPACE CRANES AND HOISTS INSPECT, TEST, AND CERTIFY | - 0 | $0.00 | $0.00 | |||||||
| 0556 | INSPECT DECK CRANES | - 0 | $0.00 | $0.00 | |||||||
| 0561 | GAUGE CALIBRATION | - 0 | $0.00 | $0.00 | |||||||
| 0562 | SCBA ANNUAL INSPECTION | - 0 | $0.00 | $0.00 | |||||||
| 0563 | SCBA COMPRESSOR AND FILLING STATION INSPECTION & MAINTENANCE | - 0 | $0.00 | $0.00 | |||||||
| 0565 | FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST | - 0 | $0.00 | $0.00 | |||||||
| 0567 | FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST | - 0 | $0.00 | $0.00 | |||||||
| 0568A | WATER MIST, WATER SPRAY AND SPRINKLER FIREFIGHTING SYSTEM INSPECTION AND TEST | - 0 | $0.00 | $0.00 | |||||||
| 0569 | FIRE AND SMOKE DETECTION AND ALARM SYSTEM | - 0 | $0.00 | $0.00 | |||||||
| 0570 | PORTABLE FIRE EXTINGUISHERS SERVICE | - 0 | $0.00 | $0.00 | |||||||
| 0571 | FIRE AND SMOKE DAMPER SERVICE | - 0 | $0.00 | $0.00 | |||||||
| 0572 | DEEP FAT FRYER AND RANGE HOOD FIRE EXTINGUISHING SYSTEM | - 0 | $0.00 | $0.00 | |||||||
| 0573 | FIRE HOSES | - 0 | $0.00 | $0.00 | |||||||
| 0574 | FIRE DOORS AND SHUTTERS | - 0 | $0.00 | $0.00 | |||||||
| 0583 | HELO HANGAR BRIDGE CRANE INSPECTION | - 0 | $0.00 | $0.00 | |||||||
| 0585 | REVERSE OSMOSIS UNITS SERVICE | - 0 | $0.00 | $0.00 | |||||||
| SUB-TOTAL | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | |
| 0600 | HABITABILITY OUTFITTING AND FURNISHINGS | ||||||||||
| 0601 | MANLIFT INSPECTION, SERVICE, AND CERTIFICATION | - 0 | $0.00 | $0.00 | |||||||
| 0604 | LIFERAFTS AND DAVITS ANNUAL CERTIFICATION | - 0 | $0.00 | $0.00 | |||||||
| 0606 | AFT HOUSE HABITABILITY MODIFCATIONS | - 0 | $0.00 | $0.00 | |||||||
| 0607 | ECR1 DECK HEAD INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0608 | BRIDGEWING SHELTERS INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0609 | LIFESAVING APPLIANCES AFT HOUSE INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0610 | CBRD CAGE SPACE INSTALLATION AND OUTFITTING | - 0 | $0.00 | $0.00 | |||||||
| 0616 | GALLEY SHELVING INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0621 | RETROFIT LIFEBOATS FROM 46 PERSONS TO 49 PERSONS | - 0 | $0.00 | $0.00 | |||||||
| 0622 | REPLACE LIFEBOAT GRIPES | - 0 | $0.00 | $0.00 | |||||||
| 0625 | AFT HOUSE SPACES D-56-5 AND D-56-6 INSULATE | - 0 | $0.00 | $0.00 | |||||||
| 0626 | MISCELLANEOUS SPACES INSULATE | - 0 | $0.00 | $0.00 | |||||||
| 0651 | LIFEBOATS AND DAVITS ANNUAL INSPECTION | - 0 | $0.00 | $0.00 | |||||||
| 0653 | RESCUE BOAT AND DAVIT ANNUAL INSPECTION | - 0 | $0.00 | $0.00 | |||||||
| 0656 | LIFERAFTS ANNUAL CERTIFICATION | - 0 | $0.00 | $0.00 | |||||||
| 0657 | ACCOMMODATION LADDER INSPECTION | - 0 | $0.00 | $0.00 | |||||||
| 0662 | DEEP FAT FRYER INSPECTION | - 0 | $0.00 | $0.00 | |||||||
| SUB-TOTAL | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | |
| 0700 | SPONSOR RELATED | ||||||||||
| 0702 | NIPR LAN DROPS INSTALL IN FORWARD HOUSE | - 0 | $0.00 | $0.00 | |||||||
| 0703 | AFT KNUCKLE BOOM CRANE BOOM REST INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0706 | SCIF IDS SYSTEM & ADDITIONAL SECURITY INSTALL | - 0 | $0.00 | $0.00 | |||||||
| 0709 | FWD OVERBOARD BLACK & GREY WATER DISCHARGE & SHORE CONNECTION INSTALLATIONS | - 0 | $0.00 | $0.00 | |||||||
| 0710 | POST OFFICE SECURITY MODIFICATIONS | - 0 | $0.00 | $0.00 | |||||||
| 0711 | SCBA STOWAGE LOCKER INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0716 | MODIFY ARMORY A5-94-2 STOWAGE SPACE | - 0 | $0.00 | $0.00 | |||||||
| 0723 | HIGH VOLTAGE SAFETY CAGE INSTALLATION | - 0 | $0.00 | $0.00 | |||||||
| 0724 | BREECH BASE SOCKETS INSTALL TEU SPOT 18 & 19 | - 0 | $0.00 | $0.00 | |||||||
| 0757 | RELOCATE GUN MOUNT NO. 12 | - 0 | $0.00 | $0.00 | |||||||
| SUB-TOTAL | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | |
| 0800 | HVAC | ||||||||||
| - 0 | $0.00 | $0.00 | |||||||||
| - 0 | $0.00 | $0.00 | |||||||||
| 0900 | DRYDOCKING | ||||||||||
| 0958 | PROPELLER CLEAN AND POLISH – IN WATER | - 0 | $0.00 | $0.00 |
| 1000 | UNREP EQUIPMENT | ||||||||||
| - 0 | $0.00 | $0.00 | |||||||||
| - 0 | $0.00 | $0.00 | |||||||||
| TOTAL | - 0 | $0.00 | $0.00 | - 0 | $0.00 | $0.00 | $0.00 | - 0 | $ - 0 | $0.00 |
| &"Times New Roman,Regular"USNS JOHN L CANLEY (T ESB 6) | &"Times New Roman,Regular"CONTRACTOR PRICE BREAKDOWN |
| &"Times New Roman,Bold"CATEGORY "A" ITEMS | &"Times New Roman,Regular"RFP N3220523R4083 |
ATTACHMENT J-2
&P of &N
File details come from the government source that posted it. Updated .