N3220521R4156 Amendment 00002.docx
DOCX document 36 KB Posted
- Attached to
- USNS RICHARD BYRD MTA Federal contract opportunity
- Solicitation number
- N3220521R4156
About this file
This document contains answers to questions regarding work items and specifications for the annual maintenance availability of the USNS RICHARD BYRD. Key details include maintenance and inspections required for life rafts, fire detection and suppression systems, waste drain piping replacement, and generator and propulsion controls. Annual inspections are specified for items such as self-contained breathing apparatus, foam and gas firefighting systems. Five-year inspection cycles are defined for certain control valves, nozzles, and proportioning devices. Location and quantities are provided for waste drain piping replacement. Part numbers are requested for some detector and pull station replacements. Clarification is provided regarding titles and inspection windows for various work items.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3220521R4156 Amendment 00005.docx | DOCX document | |
| N3220521R4156 Amendment 00004.docx | DOCX document | |
| J - 2 Category A Items BYRD Amendment 00004.xls | XLS spreadsheet | |
| N3220521R4156 Amendment 00003.docx | DOCX document | |
| 0569_A_TAKE CCSI FIRE AND SMOKE DETECTION ALARM SYSTEM (1 YR) (SCSI) Rev. 1.doc | DOC document | |
| J - 10 Interport Differential.docx | DOCX document | |
| J - 2 Category A Items BYRD.xls | XLS spreadsheet | |
| N3220521R4156 Amendment 00001.docx | DOCX document | |
| N3220521R4156 USNS RICHARD BYRD.docx | DOCX document | |
| New CDRLS.zip | ZIP file | |
| J-Attachments.zip | ZIP file |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3220521R4156
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS & OTHER ATTACHMENTS
The following have been added by full text:
ANSWERS TO RFCS
SPECIFICATION ITEM NO.: 562
PARAGRAPH / SECTION NO: 7.4.5
TITLE: SCBA ANNUAL INSPECTION
QUESTION:
7.4.5 Replace low pressure hoses that exceed five (5) years in service. For estimating purposes, assume five (5) require replacement.
Please provide the PN for the LP hoses. The model listed in 3.1.2 99696-01 is for the cylinder not the SCBA unit.
ANSWER: Please work with the OEM (you plan to hire for the WI) on the PN for the LP hose. They would have the part number for them.
The type/Model number that the ship current have are the Interspiro S4 and Interspiro S6.
SPECIFICATION ITEM NO.: 0301
PARAGRAPH / SECTION NO: Title
TITLE: ____TAKE_CSI_CLEANING MAIN GENERATORS AND PROPULSION CONTROL SYSTEM (2.5 YR) (SCSI)
QUESTION: Specification provided for item 0301 is not the same as listed in the J-2 price sheet. Please advise.
ANSWER: The correct title for work item 301 is “AMPLIFY 1JV CIRCUIT IN EOS AND BRIDGE” J-2 and section C will be updated.
SPECIFICATION ITEM NO.: 565
PARAGRAPH / SECTION NO: 7.7
TITLE: FIXED GAS FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)
7.7 Perform an internal inspection of all fire extinguishing system control valves every 5 years. Accomplish Reference 2.1.8, sections A and B on all valves.
Are 5-year control valve internal inspection due?
ANSWER: We are not in our 5 year inspection window.
SPECIFICATION ITEM NO.: 567_
PARAGRAPH / SECTION NO: 7.6.3
TITLE: FIXED FOAM FIREFIGHTING SYSTEM INSPECTION AND TEST (1 YR)
QUESTION:
7.6.3 In addition to the annual maintenance, accomplish the following maintenance on the fixed foam firefighting system:
a. Once every 5 years, conduct a functional test of all foam proportioners or other foam fixing devices to confirm that the mixing ratio is within +30 to -10% of the nominal mixing ratio defined by the system approval. Collect a sample and verify the ratio via refractometer and report test results to the MSCREP using Reference 2.1.2 for guidance.
b. Once every 5 years, temporarily remove and check the pressure-vacuum vent valve on the concentrate storage tanks. While vent is removed, make certain that the opening is not blocked, and that dirt or other foreign objects do not enter the tank. Flush, clean, inspect and lubricate the valve and all components ensuring proper operation. Reinstall with new gasket upon completion.
c. Once every 5 years, open, clean and inspect the control valves, pressure regulating valves, pressure reducing valves and relief valves. Accomplish Reference 2.1.6, sections A and B on all valves. Layout components for MSCREP and ABS inspection. Reassemble using new gaskets, seals, diaphragms, rings, and soft goods upon completion of any authorized repair.
d. Once every 5 years, flush all high expansion foam system piping with fresh water, drain and purge with air.
e. Once every 5 years, check all nozzles to prove they are clear of debris.
f. Once every 5 years, test all foam proportioners or other foam mixing devices to confirm that the mixing ration tolerance is within +30 to -10% of the nominal mixing ration defined by the system approval.
Are the 5-year services due for a, b, c, d, e, and f.
ANSWER: We are not in our 5 year inspection window.
SPECIFICATION ITEM NO.: 569
PARAGRAPH / SECTION NO: 7.6.2
TITLE: FIRE AND SMOKE DETECTION ALARM SYSTEM (1 YR)
7.6.2 For estimating purposes assume five (5) heat and twenty (20) smoke detectors and ten (10) pull stations will require replacement.
Please provide part numbers and manufacture for prespecified detectors and pull stations.
ANSWER: A revision will be made to the WI to remove this requirement. If anything arise during the Inspection, a CFR will be utilized to replace any equipment needed during the availability.
SPECIFICATION ITEM NO.: 572
PARAGRAPH / SECTION NO: 7.1 & 7.6
TITLE: DEEP FAT FRYER AND RANGE FIRE EXTINGUISHING SYSTEM (1 YR)
QUESTION:
7.1 Inspect, service, recharge, and test all Deep Fat Fryer, Grill and Range Hood Fire Extinguishing Systems using References 2.1.1 through 2.1.5 and Enclosures 2.2.1 through 2.2.3 for guidance.
Contractor cannot determine if recharges are needed before inspection please provide a estimation or if contractor shall inspect and report service work found due.
7.6 If hydrostatic test is due or insufficient charge is noted during inspection or maintenance:
Are any hydrostatic test due?
Shall contractor inspect and submit a Condition Found Report for any service work found due?
ANSWER: For paragraph 7.1, provide a Condition Found Report (CFR) to capture any recharges during the inspection.
For paragraph 7.6, there should not be any Hydrostatic test due. But if they are, please capture the requirement in a CFR.
SPECIFICATION ITEM NO.: 575
PARAGRAPH / SECTION NO: 7.6, 7.6.1, & 7.6.2
TITLE: WATER MIST FIREFIGHTING SYSTEM - INSPECTION AND TEST (1 YR)
7.6 In addition to the annual maintenance items listed above the following will executed at the designated periodicity.
7.6.1 Every 2 years perform a water mist release on sections separately in accordance with Reference 2.3.
7.6.2 Every 5 years perform internal inspection of all control/section valves.
Are the 2 or 5 year services due?
ANSWER: We are neither, in our 2 year or 5 year Service cycle. This is only an annual inspection.
SPECIFICATION ITEM NO.: 155
PARAGRAPH / SECTION NO: 1.1, 2.0, 3.1, 3.1.2, 3.2.1, 7.2.
TITLE: ANNUAL LIFE RAFT CERTIFICATION
QUESTION:
Contractor notes conflicting material quantities between 3.1 Location/Quantity and 3.2.1 Bill of Materials (Contractor Furnished):
2.2 VR20-0004 Waste Drain Piping
2.3 VR20-0006 MMR LL Waste Drain Piping
Paragraph 3.1.1 Location, 2.2 & 2.3 show 8 locations and the material totals:
| 2" |
| 3" |
| Y |
| 45 deg. |
| 90 deg. |
| SCH 80 |
| SCHXS |
| Section #1 |
| 15 |
X
| Section #2 |
| 15 |
X
Section #3
X
| Section #4 |
| 15 |
X
| Section #5 |
| 6 |
X
Section #6
X
| Section #7 |
| 22 |
X
| Waste Drain |
| 15 |
| 4 |
| 1 |
X
| TOTAL |
| 88 |
| 19 |
| 1 |
| 5 |
| 1 |
3.2.1 Bill of Materials (Contractor Furnished):
| Description |
| Part Number |
| Quantity |
| Pipe, Drain 2 inch (50mm) Schedule 80 |
| Seamless Carbon Steel, ASTM A53, GR8 or ASTMA106, GRb TYS, SCH80 |
| 200 ft |
| Pipe, Drain 2 inch (50mm) Schedule XS |
| Seamless Carbon Steel, ASTM A53, GR8 or ASTMA106, GRb TYS, SCHXS |
| 40 ft |
| Pipe, Drain 3 inch (50mm) Schedule 80 |
| Seamless Carbon Steel, ASTM A53, GR8 or ASTMA106, GRb TYS, SCH80 |
| 100 ft |
| 90 Degree Elbow |
| Carbon Steel, ASTM A53, GR8 or ASTMA106, GRb TYS, SCH40 |
| 10 |
| 45 Degree fitting |
| Carbon Steel, ASTM A53, GR8 or ASTMA106, GRb TYS, SCH40 |
| 10 |
| Bulkhead Penetration |
| Carbon Steel, ASTM A53, GR8 or ASTMA106, GRb TYS, SCH40 |
| 1 |
| Y-Connections, 2 inch (50mm) |
| Carbon Steel, ASTM A53, GR8 or ASTMA106, GRb TYS, SCH40 |
| 10 |
| Pipe U-Bolts for 2 inch pipe |
| Stainless Steel |
| 150 |
| Fastners, nuts bolts |
| Stainless Steel |
| 300 |
| Pipe Hangar Chaffing Material Rubber Channel |
| 2 inch Rubber Channel for Pipe clamp U-Bolts |
| 20 t |
7.2.1 SY Contractor shall remove, re-fabricate, weld and install NEW waste drain piping on in locations stated in paragraph 3.
Please provide the locations where the additional piping noted in the specification is to be installed.
ANSWER: The Locations are found in 3.1. There are no additional locations. Also measurements are also approximations. They can be longer or short. That is why Ship-checking the Work item is ideal.
Also, Paragraph 3.2 are for bidding purposes. Also, taken into account, there will be piping wastage when cutting the pipe material and make allowances for approximations.