PWS RUDDER STOCK REFURBISHMENT LC Rev C.pdf
PDF 143 KB Posted
- Attached to
- Wartsila Rudderstock Refurbishment
- Solicitation number
- N32205-21-Q-2653
About this file
This performance work statement outlines requirements for refurbishing the rudder stock on the USNS Lewis & Clark. Wartsila Defense Incorporated will remove the existing rudder stock liner and install a new inconel liner. The work includes surface preparation, non-destructive testing, hydrostatic testing, and coating application. All work must be completed by January 30, 2022 at Wartsila's facility in Chesapeake, Virginia. The Military Sealift Command is seeking this rudder stock refurbishment through solicitation N32205-21-Q-2653 to maintain the auxiliary systems on the USNS Lewis & Clark.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS LEWIS & CLARK
(T-AKE 1)
Auxiliary Machinery Service Order. SO-21-120
23 MARCH 2021
ITEM NO. SO-21-TBD MSC/N756/SA/DGC
RUDDER STOCK REFURBISHMENT
SO-21-020-1
1.0 ABSTRACT:
1.1 This item provides Wartsila Defense Inc. support to
perform work on the ship’s rudderstock for the USNS
LEWIS & CLARK TAKE 1.
2.0 REFERENCES/ENCLOSURES:
2.1 References:
2.1.1 Bot Groningen Dwg 1.1262/1/1 A1, Rudder Project
Arrangement.
2.1.2 Bot Groningen Dwg 2.1263/3.1 A2, Rudder Stock
Machining.
3.0 ITEM LOCATION AND DESCRIPTION:
3.1 Locations/Quantity:
3.1.1 Location: USNS LEWIS & CLARK (T-AKE 1).
3.1.2 Bill of Materials (Contractor Furnished); Rudder
Stock Liner, Material: Inconel.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/SERVICES:
4.1 Government Furnished Equipment (GFE): None.
4.2 Government Furnished Material (GFM):
-Amercoat 240, Haze Gray, One (1) Gallon.
-Amercoat 240, Red Oxide, One (1) Gallon.
-Amercoat T-10, Solvent, Two (2) Gallons.
4.3 Government Furnished Services:
-PPG Protective and Marine Coatings Representative.
-Shipping services of Rudder Stock Shaft from Vigor
Marine, Portland Oregon to WARTSILA Defense.
5.0 NOTES:
5.1 Performance Period: Upon award thru 30 January 2022
5.2 Performance Location: Wartsila Facility, Chesapeake, VA.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK:
Auxiliary Machinery Service Order. SO-21-120
23 MARCH 2021
ITEM NO. SO-21-TBD MSC/N756/SA/DGC
RUDDER STOCK REFURBISHMENT
SO-21-020-2
7.1 Provide the services of Authorized Service Reps from
Wartsila Defense Incorporated (WDI). WDI will perform the replacement of the Rudder Stock liner.
7.1.1 Work will be performed IAW Reference 2.1.1
7.2 Wartsila shall perform the following as well as work
identified in reference 2.1.2:
7.2.1 Removal of the Rudder Stock from flatbed using
two inside cranes.
7.2.2 Unpack the Rudder Stock.
7.2.3 100% Dimensional Inspections Detailed Report will follow.
7.2.4 WDI Technical over-site during the liner
replacement.
7.2.5 Lift Rudder Stock onto lathe.
7.2.6 Check Rudder Stock shaft run-outs.
7.2.7 Removal of existing liner.
7.2.8 Hone new liner to size.
7.2.9 Machine/Hone the new Rudder Stock liner to
proper size using dimensions from existing
Stock.
7.2.10 NDT (Mag Particle Test) areas once all corrosion
has been removed and no findings are noted by
ABS
7.3 Inspection/Testing:
7.3.1 Hydrostatic test:
7.3.1.1 Blank off both ends of new liner and
perform Hydrostatic test of fifty (50)psi for at least 30 minutes. No leakage allowed.
7.3.1.2 ABS and MSC shall witness.
7.4 Painting:
7.4.1 Test for chlorides in the presence of PPG
Manufacturer’s Rep. Standard to achieve is less than 20mg/m2 (2μg/cm2). If excess chlorides are identified/found, apply “Salt Away” and high
Auxiliary Machinery Service Order. SO-21-120
23 MARCH 2021
ITEM NO. SO-21-TBD MSC/N756/SA/DGC
RUDDER STOCK REFURBISHMENT
SO-21-020-3
pressure wash the interior of the stern tube to remove chloride contaminants and bacteria from the metal using 5 to 10kpsi equipment.
7.4.2 Cover bearing and sealing areas from blast
material.
7.4.3 Blast Rudder Stock to SSP-10 near white metal
finish, High-pressure wash surfaces to remove any contamination and re-check chlorides and anchor profile. Profile 3-5mil.
7.4.4 Steel temperatures shall be a minimum of 86F
degrees prior to beginning coating processes and to maintain cure times.
7.4.5 Follow all recoat and cure time as per the Paint
Rep and Product recommendations.
7.4.6 Apply 1st full coat with AMERCOAT 240 Haze Gray
to all edges, minor pits, and any other areas of the Rudder Stock requiring coating. DO NOT PAINT
LINER OR SEALING SURFACES.
7.4.7 Apply 2nd full coat with AMERCOAT 240 Red Oxide
at 8-10 mils DFT by spray, brush or roll application.
7.4.8 Quantify DFT measurements after coating is dry.
FOR best results, maintain heat of 86F steel temperature if possible and ventilation during entire curing process.
7.4.8.1 If not 86 Deg F., let it be known that
dry times will take longer to attain proper curing.
7.4.9 Perform surface finish inspection with
proflometer.
7.4.10 Machine the Contractor Furnished Inconel Rudder
Stock liner, or agreed equivalent due to time saving, to proper size using dimensions from existing Stock.
7.5 Install new liner:
7.5.1 Install and machine OD of liner to required
specified dimension.
Auxiliary Machinery Service Order. SO-21-120
23 MARCH 2021
ITEM NO. SO-21-TBD MSC/N756/SA/DGC
RUDDER STOCK REFURBISHMENT
SO-21-020-4
7.5.2 Provide a detailed inspection report for new
liner.
7.5.3 Perform surface finish inspection with
proflometer.
7.5.4 Remove all Pits on Non-Bearing areas by making
smooth (Spoon) profiles.
7.5.5 Re-package the Rudder Stock to prevent damage
from weather.
7.5.5.1 Preserve non-bearing areas as liner.
7.5.6 Notify MSC when complete to coordinate
transportation from Machine Shop.
7.6 All work to completed to the satisfaction of the
Principle Port Engineer and Type Desk of T-AKE Class
Ships.
7.7 Manufacturer’s Representative:
Wartsila Defense Incorporated
617 Koppens Way
Chesapeake, Va 23323
Phone: 757-944-0119
POC: Joe Farmer
Phone: 757-485-5275
Joseph.Farmer@wartsiladefense.com
8.0 GENERAL REQUIREMENTS: None additional.
9.0 Growth Work: For any additional growth work, please provide a
Conditions Found Report (CFR) to the Technical Point of
Contact before completing any in-scope changes.