J-3 Category B Items REV 2.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- USNS YUKON FY21 ROH Federal contract opportunity
- Solicitation number
- N3220520R4011
About this file
This file contains a spreadsheet with line item estimates for category B items needed for the regular overhaul of the USNS Yukon (T-AO-202). The estimates include costs for physical security, vessel cleaning, continuation of certain services during overhaul, pipe repairs in various sizes, structural steel repairs including plate replacement and welding, replacement of zinc anodes, removal and replacement of tailshafts and pintle bearings, extension of dry dock time, and shaft alignment checks.
The related federal contract opportunity is solicitation N3220520R4011 for the USNS Yukon FY21 ROH. The Military Sealift Command requires a contractor to perform the regular overhaul of the USNS Yukon. The solicitation includes further details on the products and services required.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| 25 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY IN FORCE PROTECTION CONDITIONS BRAVO - DELTA | Total | Total | Total | Total | Total | Total | Total | Total | Total | Total |
| 7.11 | Cost to Establish Condition Bravo | 1 | Days | ||||||||
| 7.12 | Cost to Establish Condition Charlie | 1 | Days | ||||||||
| 7.13 | Cost to Establish Condition Delta | 1 | Days | ||||||||
| 7.11 | Daily Rate to Maintain Condition Bravo | 1 | Days | ||||||||
| 7.12 | Daily Rate to Maintain Condition Charlie | 1 | Days | ||||||||
| 7.13 | Daily Rate to Maintain Condition Delta | 1 | Days | ||||||||
| WI 025 SUBTOTAL | |||||||||||
| 026 | VESSEL FINAL CLEANING CAT B | Total | Total | Total | Total | Total | Total | Total | Total | Total | Total |
| 7.1 | |||||||||||
| WI 026 SUBTOTAL | |||||||||||
| 030 | CONTINUATION OF SERVICES | Total | Total | Total | Total | Total | Total | Total | Total | Total | Total |
| 7.1 | Parent work item 010 “Overhaul Management Team Services”. | 15 | Days | ||||||||
| 7.2 | Parent work item 011” General Services for the Ship” | 15 | Days | ||||||||
| 7.3 | Parent work item 012 “Telephone Services | 15 | Days | ||||||||
| 7.4 | Parent work item 013 “Project Planning and Monitoring” | 15 | Days | ||||||||
| 7.5 | Parent work item 016 “Fire Protection and Ship’s Safety” | 15 | Days | ||||||||
| 7.6 | Shipboard Access and Security | 15 | Days | ||||||||
| 7.7 | Parent work item 020 “Gas Free Certificates” | 15 | Days | ||||||||
| 15 | Days | ||||||||||
| WI 030 SUBTOTAL | |||||||||||
| 114 | Pipe Repairs CAT B | QTY | UNIT | Unit Price | Total | Total | |||||
| 7.1.1 | 8 inch pipe (Sch 80) | 60 | FT | ||||||||
| 7.1.2 | 8 inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||
| 7.1.3 | 8 inch 90 degree elbow | 4 | EA | ||||||||
| 7.1.4 | 6 inch pipe (Sch 80) | 80 | FT | ||||||||
| 7.1.5 | 6 inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||
| 7.1.6 | 6 inch 90 degree elbow | 4 | EA | ||||||||
| 7.1.7 | 5 inch pipe (Sch 80) | 80 | FT | ||||||||
| 7.1.8 | 5 inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||
| 7.1.9 | 5 inch 90 degree elbow | 4 | EA | ||||||||
| 7.1.10 | 3 inch pipe (Sch 40) | 80 | FT | ||||||||
| 7.1.11 | 3 inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||
| 7.1.12 | 3 inch 90 degree elbow | 4 | EA | ||||||||
| 7.1.13 | 2.5 inch pipe (Sch 40) | 80 | FT | ||||||||
| 7.1.14 | 2.5 inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||
| 7.1.15 | 2.5 inch 90 degree elbows | 4 | EA | ||||||||
| WI 114 SUBTOTAL | |||||||||||
| 115 | Structural Steel Repairs CAT B | QTY | UNIT | Unit Price | Total | Total | |||||
| 7.1.1 | Steel Plate Replacement | 20,000 | LBS | ||||||||
| 7.1.2 | Rolled Steel Structural Shapes | 10,000 | LBS | ||||||||
| 7.2.1 | vee out and re-weld one (1) 6” long or less cracked fillet weld | 50 | EA | ||||||||
| 7.2.2 | vee out and re-weld one (1) 7”–12” long cracked fillet weld | 50 | EA | ||||||||
| 7.3.1 | One(1) Sounding Tube Striker Plate | 20 | EA | ||||||||
| WI 115 SUBTOTAL | |||||||||||
| 948 | CAT B Zinc Anode Replacement | QTY | UNIT | Unit Price | Total | Total | |||||
| 7.2.1 (a) | Type ZSS-12 | 200 | EA | ||||||||
| 7.2.1 (b) | Type ZHC-23 | 50 | EA | ||||||||
| 7.2.1 © | Type ZHC-47 | 50 | EA | ||||||||
| 7.2.1 (d) | Type ZEP Style B | 50 | EA | ||||||||
| 7.3 | |||||||||||
| WI 948 SUBTOTAL | |||||||||||
| 949 | CAT B Tailshaft Removal | Total |
| WI 949 SUBTOTAL | ||
| 950 | CAT B Pintle Bearing Replacement | Total |
| WI 950 SUBTOTAL | |||||
| 951 | CAT B Dry Docking Extension | QTY | Unit | Total | Total |
| Extend Dry Dock | 10 | Days | |||
| WI 951 SUBTOTAL | |||||
| 967 | Shaft Alignment Bearing Reaction Checks (Sets 3 & 4) | Total |
| WI 967 SUBTOTAL | ||
| 968 | Shaft Alignment Bearing Reaction Checks (Post Sea Trail) | Total |
| WI 968 SUBTOTAL |
| Total Category "B" Items |
File details come from the government source that posted it. Updated .