This document contains a contractor price breakdown for category A items required for the regular overhaul of the USNS Yukon (T-AO-202). The contractor shall provide services including hull preservation and repairs, main propulsion and engine overhauls, electrical system maintenance and upgrades, auxiliary machinery services, habitability repairs, heating and ventilation system work, drydocking, and underway replenishment equipment refurbishment. The contractor will also be responsible for establishing and maintaining physical security conditions at its private facility, as well as continuing various services for 15 days after contract completion. Pricing is provided by line item number for labor hours, materials, subcontractors, and total costs for the category A work.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat A Items
| CATEGORY “A” ITEMS | ||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | |||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Govt Mand TR/Sub Price | OTHER COSTS | TOTAL LABOR HOURS | TOTAL MATERIAL | |
| CATEGORY "A" | ||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||
| 001 | INTENT, SCOPE, GENERAL REQUIREMENTS, AND DEFINITIONS | |||||||||||
| 002 | TECHNICAL AND MANUFACTURER’S REPRESENTATIVES | |||||||||||
| 003 | APPROACH, BERTH, AND MOORING REQUIREMENTS | |||||||||||
| 004 | TESTING AND QUALITY ASSURANCE | |||||||||||
| 005 | ELECTRICAL SAFETY PROCEDURES REQUIREMENTS | |||||||||||
| 006 | HEAVY WEATHER PLAN | |||||||||||
| 010 | FURNISH OFFICE FOR OVERHAUL MANAGEMENT TEAM | |||||||||||
| 011 | FURNISH GENERAL SERVICES (T-AO) | |||||||||||
| 012 | TELEPHONE SERVICES | |||||||||||
| 013 | PROJECT PLANNING AND PRODUCTION STAUS MONITORING REPORT | |||||||||||
| 014 | PREPARATION OF WEIGHT AND MOMENT REPORT | |||||||||||
| 015 | INTEGRATED LOGISTICS AND GFM SUPPORT RQUIREMENTS | |||||||||||
| 016 | FIRE PROTECTION AND SHIP'S SAFETY PROGRAM | |||||||||||
| 017 | HANDLING SHIP'S STORES | |||||||||||
| 018 | DELIVERY AND REDELIVERY OF VESSEL | |||||||||||
| 019 | SHIPBOARD ACCESS AND SECURITY | |||||||||||
| 020 | GAS FREE CERTIFICATES | |||||||||||
| 021 | CLEAN AND GAS FREE TANKS, VOIDS, COFFERDAMS AND SPACES | |||||||||||
| 022 | DOCK TRIALS AND SEA TRIALS | |||||||||||
| 023 | HAZARDOUR WASTE DISPOSAL AT A CONTRACTOR'S FACILITY | |||||||||||
| 024 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY | |||||||||||
| 026 | VESSEL FINAL CLEANING CAT B | |||||||||||
| 090 | DAILY COVID 19 PREVNENTION AND CONTROL SERVICES | |||||||||||
| 100 | HULL STRUCTURES | |||||||||||
| 101 | NDT Kingposts (ABS & USCG) | |||||||||||
| 102 | AFFF Sprinkler Piping Replacement | |||||||||||
| 103 | Frame 56 Expanision Joint Replacement | |||||||||||
| 104 | 02 LVL Focsle Preservation | |||||||||||
| 105 | Deck Preservation | |||||||||||
| 106 | Potable Water Tank Preservation | |||||||||||
| 107 | Flight Deck AFFF Piping Replacement | |||||||||||
| 108 | Exterior Ladderway Repairs | |||||||||||
| 109 | Flight Deck Preservation | |||||||||||
| 110 | Fligh Deck Safety Nets | |||||||||||
| 111 | Cargo Tiedown Replacement | |||||||||||
| 112 | Close Up Survey | |||||||||||
| 113 | Ultrasonic Gauging | |||||||||||
| 114 | PIPING REPLACEMENT CAT B | |||||||||||
| 115 | STEEL REPLACEMENT CAT B | |||||||||||
| 116 | Flight Deck Tiedown Replacement | |||||||||||
| 117 | Aft Ballast Tank Preservation | |||||||||||
| 118 | Fore Peak Preservation | |||||||||||
| 119 | Gravity Drain Line Replacement | |||||||||||
| 120 | Tank Preservation, 1S, 1P and 3P | |||||||||||
| 121 | Cargo Tank Preservation 2C | |||||||||||
| 122 | Degaussing System Removal | |||||||||||
| 123 | Garbage Chute Removal | |||||||||||
| 162 | Water Tight Closure Inspection (5YR) |
| 200 | MAIN PROPULSION |
| 201 | Port Main Engine 24K Overhaul |
| 202 | Main Engine Intercooler Cleaning |
| 203 | Main Engine Fuel Injector Overhaul |
| 204 | Maine Engine Industrial Assist |
| 300 | ELECTRICAL |
| 302 | Weather Deck Kick Pipes |
| 303 | AC Motor Overhauls |
| 304 | Annual Cargo Console Groom |
| 305 | Annual PTO Groom |
| 331 | Circuit Breaker Overhauls |
| 351 | Switchboard Cleaning |
| 352 | Motor Control Center Cleaning |
| 353 | Thermographic Survey |
| 354 | Generator Cleaning and Inpsection |
| 401 | Dopppler Speed Log Maintenance |
| 402 | Echo Sounder Service |
| 403 | OE 82 UHF Satcom Antenna Overhaul |
| 404 | New Radar and ECDIS Installation |
| 451 | Annual Radar Service |
| 452 | Annual Ecdis Service |
| 453 | Annual Gyro Service |
| 454 | Annual SVDR Certification |
| 455 | Annual Radio Comm Equipment Recertification |
| 456 | Magnetic Compass Service |
| 457 | EPIRB SERVICE (5 YR) |
| 458 | Antenna Maintenance Whip, Dipole and NGW |
| 459 | URT-23(D) URR-2368A HF Set Groom |
| 460 | Annual Inspection of Alarms |
| 500 | AUXILIARY MACHINERY |
| 501 | Installation of New Distillers |
| 502 | EDG Overhaul |
| 503 | Ship's Service Air Compressor Groom |
| 504 | Hp Air Compressor Overhaul |
| 505 | Start Air Compressor Overhaul and Groom |
| 506 | MSD Tank Replacement |
| 507 | Vacuum Sewage Collection Piping Acid Cleaning |
| 508 | Purifier Maintenance - WESTFALIA |
| 509 | SSDG Exhaust Insulation Renewal |
| 510 | Roller Curtain Doors Replacement |
| 511 | MARPOL ANNEX VI Sample Requirement Install |
| 512 | Autopilot Replacement |
| 513 | Pump Overhaul |
| 517 | Annual Incinerator Service |
| 524 | ER OWS and Cargo OCM Certification (1YR) |
| 535 | ABS Auxiliary Boiler Survey and Hydro |
| 556 | Inspect Deck Cranes |
| 558 | Personnel Elevator Inspection |
| 561 | Gauge Calibration (2YR) |
| 562 | SCBA Annual Inspection (1 YR) |
| 563 | SCBA Compressor and Fill Station Inspection (1YR) |
| 565 | Fixed Gas Firefighting System Inspect and Test (1 YR) |
| 567 | Fixed Foam Firefighting System Inspect and Test (1 YR) |
| 569 | Fire and Smoke Detection System (1 YR) |
| 570 | Portable Fire Extinguisher Service (1 YR) |
| 571 | Annual Fire and Smoke Damper Service (1 YR) |
| 572 | Deep Fat Fryer and Range Hood Ext System (1 YR) |
| 573 | Fire Hoses (1 YR) |
| 574 | Fire Doors and Shutters (1 YR) |
| 600 | HABITABILITY |
| 601 | Joiner Bulkhead and Shower Repairs |
| 602 | Carpet and Tile Replacement |
| 651 | Annual Lifeboat Davit Inspection |
| 653 | Annual Rescue Boat Davit Inspection |
| 655 | Immersion Suit Service |
| 656 | Annual Liferaft Certirication |
| 657 | Accomodation Ladder Inspect and Test (1 YR) |
| 662 | Deep Fat Fryer Inspection |
| 800 | HEATING, VENTILATION, AC |
| 802 | Misc Lagging Insulation Renewal |
| 803 | Renew Air Ducting |
| 851 | Annual Galley Vent & Gaylord Hood Cleaning |
| 852 | Annual Laundry Vent Cleaning |
| 853 | Accomodation Vent Cleaning |
| 900 | DRY DOCKING |
| 901 | Dry Docking Undocking |
| 902 | Propeller System Maintenance and OD Box Grrom |
| 903 | Propeller Shaft Weardown |
| 904 | Stern Tube Seal Servicing and Maintenance |
| 905 | Bilge Keel Inspection |
| 906 | Spur Line Cutter and Net Inspection |
| 907 | Sea Chest and Stern Tube Zincs |
| 908 | Hull Freeboard Cleaning and Painting |
| 953 | Anchors and Chains (5 YR) |
| 954 | Rudder and Stern Frame Exam and Repair |
| 956 | Overhauling Sea Valves |
| 960 | Underwater Hull Cleaning and Painting |
| 962 | Cathodic Protection System |
| 963 | Sea Chest Marine Growth Prevention System |
| 966 | Shaft Alignment Bearing Reaction Checks |
| 1000 | UNREP EQUIPMENT |
| 1001 | Highline Cargo Winch and Electric Motor Refurbishment |
| 1002 | Heavy SP Winch and Motor Refurbishment |
| 1003 | Gauge and Thermometer Calibration |
| 1004 | HP Air Relief Valves |
| 1005 | Saddle Winch Motor Refurbishment and Shaft Replacement |
TOTAL CATEGORY "A" ITEMS
| USNS YUKON (T-AO 202) | CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "A" ITEMS | N32205-18-R-4011 |
ATTACHMENT J-2
Sheet1
Cat B Items
| 25 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR’S FACILITY IN FORCE PROTECTION CONDITIONS BRAVO - DELTA | Total | Total | Total | Total | Total | Total | Total | Total | Total | Total |
| 7.11 | Cost to Establish Condition Bravo | 1 | Days | ||||||||
| 7.12 | Cost to Establish Condition Charlie | 1 | Days | ||||||||
| 7.13 | Cost to Establish Condition Delta | 1 | Days | ||||||||
| 7.11 | Daily Rate to Maintain Condition Bravo | 1 | Days | ||||||||
| 7.12 | Daily Rate to Maintain Condition Charlie | 1 | Days | ||||||||
| 7.13 | Daily Rate to Maintain Condition Delta | 1 | Days | ||||||||
| WI 025 SUBTOTAL | |||||||||||
| 030 | CONTINUATION OF SERVICES | Total | Total | Total | Total | Total | Total | Total | Total | Total | Total |
| 7.1 | Parent work item 010 “Overhaul Management Team Services”. | 15 | Days | ||||||||
| 7.2 | Parent work item 011” General Services for the Ship” | 15 | Days | ||||||||
| 7.3 | Parent work item 012 “Telephone Services | 15 | Days | ||||||||
| 7.4 | Parent work item 013 “Project Planning and Monitoring” | 15 | Days | ||||||||
| 7.5 | Parent work item 016 “Fire Protection and Ship’s Safety” | 15 | Days | ||||||||
| 7.6 | Shipboard Access and Security | 15 | Days | ||||||||
| 7.7 | Parent work item 020 “Gas Free Certificates” | 15 | Days | ||||||||
| 15 | Days | ||||||||||
| WI 030 SUBTOTAL |