This document outlines category B items required for the regular overhaul of the USNS Yukon. The Military Sealift Command has a requirement to contract for work including physical security, vessel cleaning, continuation of various management and safety services for 15 days, and piping, steel plate, and structural shape replacement. Piping replacement includes various sizes of steel pipe, flanges, and elbows. Steel replacement includes approximately 10,000 pounds of plate, 5,000 pounds of shapes, and cracks of various lengths. The solicitation number for this opportunity is N3220520R4011.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| USNS YUKON (T-AO 202) FY 21 ROH | |||||||||||||||
| GENERAL REQUIREMENT | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |||||
| CATEGORY "B" | |||||||||||||||
| 025 | PHYSICAL SECURITY AT CONTRACTOR'S FACILITY | ||||||||||||||
| 7.1' | Establish Condition Charlie | 1 | DAY | ||||||||||||
| 7.2' | Maintain Condition Charlie | 1 | DAY | ||||||||||||
| 7.1' | Establish Condition Delta | 1 | DAY | ||||||||||||
| 7.2' | Maintain Condition Delta | 1 | DAY | ||||||||||||
| WI 025 Sub-Total | |||||||||||||||
| 026 | VESSEL FINAL CLEANING | ||||||||||||||
| 7.10 | Arrangement / Outfitting | ||||||||||||||
| WI 026 Sub Total | |||||||||||||||
| 030 | CONTINUATION OF SERVICES | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1 | Parent work item 010 “Overhaul Management Team Services”. | 15 | DAYS | ||||||||||||
| 7.2 | Parent work item 011” General Services for the Ship” | 15 | DAYS | ||||||||||||
| 7.3 | Parent work item 012 “Telephone Services | 15 | DAYS | ||||||||||||
| 7.4 | Parent work item 013 “Project Planning and Monitoring” | 15 | DAYS | ||||||||||||
| 7.5 | Parent work item 016 “Fire Protection and Ship’s Safety” | 15 | DAYS | ||||||||||||
| 7.6 | Parent work item 019 "Shipboard Access and Security" | 15 | DAYS | ||||||||||||
| 7.7 | Parent work item 020 “Gas Free Certificates” | 15 | DAYS | ||||||||||||
| WI 030 Sub-Total | |||||||||||||||
| 107 | PIPING REPLACEMENT | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 3.1.2.1 | Sixty (60) linear feet of eight inch Schedule 80 steel pipe | 60 | FT | ||||||||||||
| 3.1.2.2 | Eight (8) eight inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 3.1.2.3 | Four (4) eight inch 90 degree elbows | 4 | EA | ||||||||||||
| 3.1.2.4 | Eighty (80) linear feet of six inch Schedule 80 steel pipe | 80 | FT | ||||||||||||
| 3.1.2.5 | Eight (8) six inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 3.1.2.6 | Four (4) six inch 90 degree elbows | 4 | EA | ||||||||||||
| 3.1.2.7 | Eighty (80) linear feet of five inch Schedule 80 steel pipe | 80 | FT | ||||||||||||
| 3.1.2.8 | Eight (8) five inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 3.1.2.9 | Four (4) five inch 90 degree elbows | 4 | EA | ||||||||||||
| 3.1.2.10 | Eighty (80) linear feet of three inch Schedule 40 steel pipe | 80 | FT | ||||||||||||
| 3.1.2.11 | Eight (8) three inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 3.1.2.12 | Four (4) three inch 90 degree elbows | 4 | EA | ||||||||||||
| 3.1.2.13 | Eighty (80) linear feet of two and a half inch Schedule 40 steel pipe | 80 | FT | ||||||||||||
| 3.1.2.14 | Eight (8) two and a half inch flanges four bolt 150# flat face, socket welded | 8 | EA | ||||||||||||
| 3.1.2.15 | Four (4) two and a half inch 90 degree elbows | 4 | EA | ||||||||||||
| WI 107 Sub-Total | |||||||||||||||
| 115 | STEEL REPLACEMENT | QTY | UI | Unit Price | Total | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | |
| 7.1.1 | Approx 10,000 Pounds of structure steel plate | 10000 | LBS | ||||||||||||
| 7.1.2 | Approx 5,000 Pounds of rolled structure shapes | 5000 | LBS | ||||||||||||
| 7.2.1 | Approx fifty (50) of weld 6" long or less cracks | 50 | EA | ||||||||||||
| 7.2.2 | Approx. fifty (50) 7”-12” long cracks. | 50 | EA | ||||||||||||
| 7.3.1 | Approx. twenty (20) sounding tube striker plates | 20 | EA | ||||||||||||
| WI 115 Sub-Total |
| &"Times New Roman,Regular"&10USNS YUKON | &"Times New Roman,Bold"&14 |
| CATEGORY "B" ITEMS | &"Times New Roman,Regular"&10N322020R4002 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .