J-3_Cat-B.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
USNS HENRY J. KAISER FY20 ROH/DD
Solicitation number
N3220519R4016
Issued by

About this file

J-3

View the file

Other files

File Type Posted
N3220519R40160004.docx DOCX document
N3220519R4016-0003.docx DOCX document
N3220519R4016U0001.docx DOCX document
CDRL,_SWI-0010.pdf PDF
CDRL,_SWI-0021.pdf PDF
J-13,_Past_Perf_Questionaire.docx DOCX document
CDRL,_SWI-0024.pdf PDF
J-2_Cat-A.xlsx XLSX spreadsheet
CDRL,_SWI-0005.pdf PDF
CDRL,_SWI-0014.pdf PDF
J-11_MSC_Dry-Dock_Evaluation_Form.docx DOCX document
J-14,_NDA_.docx DOCX document
J-4_KAISER_ROH_20_Redacted.pdf PDF
CDRL,_SWI-0013.pdf PDF
CDRL,_SWI-0006.pdf PDF
J-5_SUB-CONTRACTING_PLAN_ASSESSMENT_CHECKLIST.docx DOCX document
CDRL,_SWI-0018.pdf PDF
N3220519R4016_-_Release.docx DOCX document
CDRL,_SWI-0001.pdf PDF
CDRL,_SWI-0023.pdf PDF
CDRL,_SWI-0022.pdf PDF
CDRL,_SWI-0019.pdf PDF
J-8_RFC.doc DOC document
CDRL,_SWI-0015.pdf PDF
CDRL,_SWI-0016.pdf PDF
CDRL,_SWI-0004.pdf PDF
J-10_Interport_Differential.doc DOC document
CDRL,_SWI-0012.pdf PDF
CDRL,_SWI-0020.pdf PDF
N3220519R4016_KAISER_JA_(post)_Redacted.pdf PDF
J-12_Past_Perf_Data.docx DOCX document
J-9_Disclsr_Lobbying_Activities_SF-LLL.doc DOC document
CDRL,_SWI-0011.pdf PDF
CDRL,_SWI-0017.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cat B Items

GENERAL REQUIREMENTQTYUIUnit PriceTotalPRIME ContractorSUBCONTRACTOROTHER COSTS
ITEM NO.TITLE CAT B ITEMPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
CATEGORY "B"
025PHYSICAL SECURITY AT CONTRACTOR'S FACILITY
7.11COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
7.11COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE1DAY
7.12COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA1DAY
Sub-Total
030CONTINUATION OF SERVICESQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1Overhaul Management Team15DAYS
7.2General Services For The Ship15DAYS
7.3Telephone Services15DAYS
7.4Project Planning and Monitoring15DAYS
7.5Fire Protection and Ship's Safety15DAYS
7.6Shipboard Access and Security15DAYS
7.7Gas Free Certificates15DAYS
Sub-Total
112STRUCTURAL STEEL REPAIRSQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
3.3.1Approx. 15,000 pounds of structural steel plate15,000POUNDS
3.3.2Approx. 5,000 pounds of rolled structural shapes5,000POUNDS
3.3.3Approx. fifty (50) 6” long or less cracked fillet welds50EA
3.3.4Approx. fifty (50) 7”-12” long cracked fillet welds50EA
3.3.5Approx. twenty (20) sounding tube striker plates20EA
3.3.6Approx. twenty (20) pits clad welded20EA
Sub-Total
510MISC PIPING REPLACEMENTQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
3.1.2.1Fifty (50) linear feet of 8” Schedule 80 carbon steel pipe50FT
3.1.2.2One hundred (100) linear feet of 8” Schedule 40 carbon steel pipe100FT
3.1.2.3One hundred (100) linear feet of 6” Schedule 40 carbon steel pipe100FT
3.1.2.4One hundred (100) linear feet of 5” Schedule 40 carbon steel pipe100FT
3.1.2.5One hundred (100) linear feet of 4” Schedule 40 carbon steel pipe100FT
3.1.2.6One hundred (100) linear feet of 3” Schedule 40 carbon steel pipe100FT
3.1.2.7One hundred (100) linear feet of 2-1/2 ” Schedule 40 carbon steel pipe100FT
3.1.2.8One hundred (100) linear feet of 2 ” Schedule 40 carbon steel pipe100FT
3.1.2.9Twenty (20) 8" flanges 150# flat face, socket welded20EA
3.1.2.10Twenty (20) 6" flanges 150# flat face, socket welded20EA
3.1.2.11Twenty (20) 5" flanges 150# flat face, socket welded20EA
3.1.2.12Twenty (20) 4" flanges 150# flat face, socket welded20EA
3.1.2.13Twenty (20) 3" flanges 150# flat face, socket welded20EA
3.1.2.14Twenty (20) 2-1/2" flanges 150# flat face, socket welded20EA
3.1.2.15Twenty (20) 2" flanges 150# flat face, socket welded20EA
Sub-Total
911Zinc Anode ReplacementQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.2.aType ZSS-12; up to a maximum of twenty (40) anodes40EA
7.2.bType ZHC-23; up to a maximum of twenty (40) anodes40EA
7.2.cType ZHC-47; up to a maximum of twenty (40) anodes40EA
7.2.dType ZEP Style B; up to a maximum of twenty (40) anodes40EA
Sub-Total
914DRYDOCKING AND UNDOCKING SHIP CONTINUATIONQTYUIUnit PriceTotalPRIME L/HLABOR PRICEMATERIAL PRICESUB L/HLABOR PRICEMATERIAL PRICETotal Labor HoursTotal MaterialTOTAL PRICE
7.1Submit unit price per day up to a maximum of 15 days to continue all services in accordance with parent item if directed15DAYS
Sub-Total
TOTAL

&"Times New Roman,Regular"&10USNS HENRY J. KAISER (T-AO 187)

&"Times New Roman,Bold"&14
CATEGORY "B" ITEMS&"Times New Roman,Regular"&10N3220519R4016

ATTACHMENT J-3

File details come from the government source that posted it.