N3220519R2012_Amendment0002.pdf

PDF 51 KB Posted

Attached to
VERTREP DET A LANT Federal contract opportunity
Solicitation number
N32205-19-R-2012
Issued by
Department of the Navy Military Sealift Command

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to VERTREP DET A LANT, newest first.
File Type Posted
Attachment_9_Pricing_Spreadsheet_REV3.xlsx XLSX spreadsheet
N3220519R2012_Amendment0003.pdf PDF
N3220519R2012_Questions2.xlsx XLSX spreadsheet
Attachment_9_Pricing_Spreadsheet_REV2.xlsx XLSX spreadsheet
N3220519R2012_Amendment0002_Conform.pdf PDF
N3220519R2012_Amendment0001.pdf PDF
Attachment_9_Pricing_Spreadsheet_Rev1.xlsx XLSX spreadsheet
N3220519R2012_Questions1.xlsx XLSX spreadsheet
Attachment_4_Closed_Circuit_Refueling.pdf PDF
Attachment_9_Pricing_Spreadsheet.xlsx XLSX spreadsheet
Attachment_7_DD254_N3220519R2012.pdf PDF
Attachment_6_Detachment_Performance_Plans.pdf PDF
Attachment_2_Primary_Logistics_Ports.docx DOCX document
N3220519R2012.pdf PDF
Attachment_1_QASP.pdf PDF
Attachment_8_Government_Furnished_Property.pdf PDF
Attachment_10_Past_Performance_Data_Sheet.doc DOC document
Attachment_3_T-AKE_Hanger_Dimensions.pdf PDF
Attachment_11_Performance_Questionnaire.doc DOC document
Attachment_5_Reporting_Templates_.pdf PDF
SYNOPSIS_N3220519R2012.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to modify the CLIN structure to align w ith Revision 2 of Attachment 9 (Pricing Spreadsheet).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Jun-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3220519R2012

X 9B. DATED (SEE ITEM 11)

17-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Jun-2019

CODE

MILITARY SEALIFT COMMAND NORFOLK

471 EAST C STREET, BLDG SP-64 NAVAL STATION N

NORFOLK VA 23511-2419

N32205 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3220519R2012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 1001

The CLIN extended description has changed from:

Heavy-Lift in accordance with the PWSThe second aircraft and detachment shall be delivered to Bahrain no later than 1200 (local standard time at delivery location) on 01 March 2020. Because specific dates may be mutually agreed upon by both parties as operational requirements dictate, pricing shall be provided for 365 days to allow for felxability in the option exercising timeline.

To:

Heavy-Lift in accordance with the PWS. Because specific delivery dates for the second helicopter may be mutually agreed upon by both parties as operational requirements dictate, the 152 days from the beginning of contract PoP (01 October 2019) to the day prior to the required delivery date of the second helicopter (29 February 2020) shall be priced to allow for flexibility in the option exercising timeline.

The pricing detail quantity has decreased by 213.00 from 365.00 to 152.00.

CLIN 2003

See Paragraph XXX of the PWS for ODC details.Period of Performance: 01 October 2020 - 31 December 2020

See Section 3.3 of the PWS for ODC details.Period of Performance: 01 October 2020 - 31 December 2020

CLIN 3003

See Paragraph XXX of the PWS for ODC details.Period of Performance: 01 January 2021 - 31 January 2021

See Section 3.3 of the PWS for ODC details.Period of Performance: 01 January 2021 - 31 January 2021

CLIN 4003

See Paragraph XXX of the PWS for ODC details.Period of Performance: 01 October 2019 - 30 September 2020Phase-in Period: XXXXX

See Section 3.3 of the PWS for ODC details.Period of Performance: 01 October 2019 - 30 September 2020Phase-in Period: XXXXX

CLIN 5001

Delivery of the two helicopters. This price shall include all delivery costs for both helicopters.

Delivery of the first helicopter.

The pricing detail quantity has decreased by 1.00 from 2.00 to 1.00.

CLIN 5002

This CLIN has been renumbered to CLIN 5003.

CLIN 1002 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1002 214 Days OPTION 2nd Helicopter Per-Diem

FFP

Heavy-Lift in accordance with the PWS (Required PoP) The second aircraft and detachment shall be delivered to Bahrain no later than 1200 (local standard time at delivery location) on 01 March 2020.

FOB: Destination

NET AMT

CLIN 5002 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

5002 1 Each OPTION Delivery

FFP

Delivery of the 2nd Helicopter

NET AMT

DELIVERIES AND PERFORMANCE

The following Delivery Schedule for CLIN 0002 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-OCT-2019 TO

30-SEP-2020

N/A N/A

The following Delivery Schedule for CLIN 0003 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-OCT-2019 TO

30-SEP-2020

The following Delivery Schedule for CLIN 1001 has been added:

CAGE

POP 01-OCT-2019 TO

29-FEB-2020

The following Delivery Schedule for CLIN 1002 has been added:

CAGE

POP 01-MAR-2020 TO

30-SEP-2020

The following Delivery Schedule for CLIN 2002 has been added:

CAGE

POP 01-OCT-2020 TO

31-DEC-2020

The following Delivery Schedule for CLIN 2003 has been added:

CAGE

POP 01-OCT-2020 TO

31-DEC-2020

The following Delivery Schedule for CLIN 3001 has been added:

CAGE

POP 01-JAN-2021 TO

31-JAN-2021

The following Delivery Schedule for CLIN 3003 has been added:

CAGE

POP 01-JAN-2021 TO

31-JAN-2021

The following Delivery Schedule for CLIN 4001 has been added:

CAGE

POP 01-FEB-2021 TO

28-FEB-2021

The following Delivery Schedule for CLIN 4002 has been added:

CAGE

POP 01-FEB-2021 TO

28-FEB-2021

The following Delivery Schedule for CLIN 5001 has been added:

CAGE

01-OCT-2019 1 N/A

The following Delivery Schedule for CLIN 5002 has been added:

CAGE

POP 01-OCT-2019 TO

01-MAR-2020

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 1002:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 5002:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following have been modified:

TABLE OF CONTENTS

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION

Attachment 1 QASP Attachment 2 Primary Logistics Ports Attachment 3 T-AKE Hangar Specifications Attachment 4 Closed Circuit Refueling Attachment 5 Reporting Templates Attachment 6 Detachment Performance Plans Attachment 7 DD 254 Attachment 8 Government Furnished Property Attachment 9 Pricing Spreadsheet Attachment 10 Past Performance Data Sheet Attachment 11 Performance Questionnaire

(End of Summary of Changes)

File details come from the government source that posted it.