This document provides details on an upcoming federal contract opportunity for Information Technology Engineering Support Services (ITESS). The Navy's Military Sealift Command will release a solicitation on or around November 19, 2018 for ITESS with a closing date of December 19, 2018. The procurement is set aside as a 100% small business total set-aside. Offerors should monitor www.fbo.gov for the solicitation's release and respond by the specified closing date. Interested parties can direct additional questions to the named contracting officer.
N6 Overarching IT Governance Framework
View the file
Other files for this federal contract opportunity
Show all 46
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSC N6 Overarching IT Governance Framework Concept of Operations May 2016
UNCLAS
Military Sealift Command MSC Delivers
Agenda Status Overarching IT Governance Framework Planning Projects Operations & Sustainment Road Ahead
Status Development and documentation has been complete Final Review with Deputy and Division Directors Review with CIO Finalize and publish Transfer ownership to N63 Educate and Socialize
Overarching IT Governance Framework Grouping Functional Areas
1. Improved Planning
2. Effective at Deploying Capabilities
3. Repeatable Processes Planning Portfolio Management Program Management Resource Management Strategic Planning & Enterprise Architecture Management Projects Project Management Operations & Sustainment Cyber Security Operations & Management Execution Management Prioritization of Capabilities Increased Communication Improved Utilization of Resources Programmatically Address Emergent Requirements Reduced Total Ownership Cost Less Fire Drill/Doing Things on The Fly Ability to Repeat Successes Visibility into What We are Delivering Delivered in a Timely Fashion Effectively Manage our Budget Increased Customer Satisfaction
MSC Delivers Planning
N6 Planning Model
N6 Planning Model Requirements Activities
Requirements Activities High Level Description Identify Stakeholder Requirements (Step 1) – The ongoing process that involves interacting with the client to gain consensus on the details of requirements via interviews, workshops, change requests and root-cause analysis.
5-Year Capability Requirements Identified (Step 2) – Identify known business, operational, technical, software and hardware requirements and ensure resources are positioned to meet the needs.
Integrated Requirements List (Step 3) – The initial coordinated approach within N6 to address all stakeholder requirements, external and internal to N6 by individual program.
MSC Delivers
Requirements Activities Roles & Responsibilities
| Functional Area Participant | Responsibility |
| Program Management | |
| Collect stakeholder requirements |
Validate requirements Consolidate requirements Maintain requirements repository Chair the Change Advisory Board (CAB) Chair Requirements Management Board (RMB) Develop proposed 5-year Capability Plan with planning estimates Cost estimates for projects and operations & sustainment activities Integrate input from Risk Management, Quality Management, IPT Management, Configuration Management, Change Management, Service Validation & Testing, and certification requirements into the Integrated Requirements List Resource Management Maintain investment baseline and execution plan Develop acquisition baseline Provide input based on Human Capital, Contract Management, Acquisition Management, Financial Management, Planning Programming Budgeting and Execution (PPBE), and Asset Management resources related to the Integrated Requirements List
| Portfolio Management | Provide input based on portfolio impact and reporting requirements related to the Integrated Requirements List |
| Strategic Planning & EA Management | Maintain Target Architecture baseline |
Maintain Enterprise Transition Plan baseline Provide input based on the capabilities requirements in support of the Strategic Plan, EA gap analysis, and technical architecture related to the Integrated Requirements List Participates in CAB and RMB Cyber Security Operations & Management Provide input based on external guidance, compliance, risk management, incident response, continuous monitoring, computer network defense, assess & authorize, and reporting activities related to the Integrated Requirements List Participates in CAB and RMB
| Project Management | Provide input based on acquisition system engineering, software engineering, Deployment Management, and Project Management related to projects identified in the Integrated Requirements List |
| Execution Management | Provide input based on operations & sustainment requirements (Service Delivery & Customer Care, Electronic Key Management System (EKMS) Management, Global Service Desk (GSD) Operations, Electronics Management, Ship Liaison Management, Asset Management, Configuration Management, Deployment Management) and Service Level Agreements (SLA) related to the Integrated Requirements List |
Participates in CAB and RMB
MSC Delivers
Requirements Activities Inputs & Outputs
| Step | Functional Area (Owner) | Input |
| 1 | Requestor | Requirement |
| 2 | Program Management | Validated Requirement |
| 2 | Program Management | Current project status |
| 2 | Program Management | Previous 5-year Capabilities Requirements Plan |
| 2 | Program Management | Previously approved Program Management Plan |
| 2 | Resource Management | Current approved investment baseline and execution plan |
| 2 | Resource Management | Current acquisition baseline |
| 2 | Change Advisory Board | Change Advisory Board decisions |
| 2 | Requirements Management Board | Requirements Management Board decisions |
| 2 | Execution Management | Modernization and maintenance requirements input |
| 3 | Project Management | ROM estimates |
| 3 | Cyber Security Operations & Management | Security data based on patching, system review and testing, and cyber mandates |
| 3 | Resource Management | Human Capital information and status |
| 3 | Resource Management | Contract information and status |
| 3 | Resource Management | Financial Management information and status |
| 3 | Strategic Planning & EA Management | Strategic Planning Objectives |
| 3 | Strategic Planning & EA Management | Target Architecture |
| 3 | Strategic Planning & EA Management | Enterprise Transition Plan |
| 3 | Strategic Planning & EA Management | Enterprise Architecture gap analysis |
| 3 | Strategic Planning & EA Management | Technical Architecture mandates |
| 3 | Portfolio Management | Portfolio reporting analysis |
| 3 | Execution Management | Current Operation & Sustainment SLAs |
| Step | Functional Area (Owner) | Output |
| 2 | Program Management | Updated 5-year Capabilities Requirements Plan |
| 2 | Project Management | Technical Assessment |
| 3 | Program Management | Integrated Requirements List |
| 3 | Strategic Planning & EA Management | Target Architecture updates |
| 3 | Strategic Planning & EA Management | Enterprise Transition Plan updates |
MSC Delivers
N6 Planning Model Planning Activities
Planning Activities High Level Description Prepare Program and Resource Planning Documents (Step 4) – Each program will have an associated program management plan identifying the capability requirements, resource requirements, impact, and risk across MSC. Documentation preparation includes Program Objective Memorandum (POM) development, presidential budget submissions, Defense Business System (DBS) submissions, fiscal year budget building, and associated contracting activities.
Present Program Plan to ITIM Working Group (Step 5) – Present program management plan to the ITIM Working Group for approval to proceed and/or recommendations.
MSC Delivers
Planning Activities Roles & Responsibilities
| Functional Area Participant | Responsibility |
| Program Management | Develop yearly update to the Program Management Plan to include costs associated with program activities (Risk Management, Quality Management, IPT Management, Configuration Management, Change Management, Service Validation & Testing, and certification requirements), projects, and operations & sustainment activities in support of the 5-year Capability Plan and Integrated Requirements List |
Develop associated documentation to include Program Objective Memorandum (POM) development, presidential budget submissions, Defense Business System (DBS) submission, fiscal year budget building, and associated contracting activities.
Present yearly updates of Program Management Plan to the ITIM Working Group Develop updated Program Management Plan based on ITIM Working Group decisions Present Program Management Plan to ITIM Board as required Resource Management Support the development of yearly updates to the Program Management Plan based on Human Capital, Contract Management, Acquisition Management, Financial Management, PPBE, and Asset Management resources Support the development of associated documentation Program Objective Memorandum (POM) development, presidential budget submissions, Defense Business System (DBS) submission, fiscal year budget building, and associated contracting activities.
Manage changes to the investment baseline and execution plan based on approved Program Management Plans Consolidate all investment requirements into annual investment baseline and execution plan for approval Review acquisition baseline Portfolio Management Provide CPIC and portfolio reporting support for the development of the Program Management Plan Coordinate briefings for the ITIM Working Group and ITIM Board Strategic Planning & EA Management Provide support for the development of the Program Management Plan based on current Strategic Plan Objectives, EA gap analysis, and technical architecture requirements as required Maintain Target Architecture baseline Maintain Enterprise Transition Plan baseline
| Cyber Security Operations & Management | Provide support for the development of the Program Management Plan based on external guidance, compliance, risk management, incident response, continuous monitoring, computer network defense, assess & authorize activities, and reporting requirements |
| Project Management | Provide technical assessment and ROM estimates for the development of the Program Management Plan based on current and/or future project requirements associated to acquisition system engineering, software engineering, Deployment Management, and Project Management |
| Execution Management | Provide support for the development of the Program Management Plan based on operations & sustainment requirements (Service Delivery & Customer Care, EKMS Management, GSD Operations, Electronics Management, Ship Liaison Management, Asset Management, Configuration Management, and Deployment Management) needed to maintain capabilities within the SLA |
MSC Delivers
Planning Activities Inputs & Outputs
| Step | Functional Area (Owner) | Input |
| 4 | Program Management | 5-year Capabilities Requirements Plan |
| 4 | Program Management | Integrated Requirements List |
| 4 | Program Management | Previous years Program Management Plan and supporting program documentation including current expense plan |
| 4 | Resource Management | Current approved investment baseline and execution plan |
| 4 | Resource Management | Current approved acquisition baseline |
| 5 | Portfolio Management | Existing CPIC artifacts |
| Step | Functional Area (Owner) | Output |
| 4 | Program Management | Consolidated input from functional areas for presentation to the ITIM Working Group or ITIM Board as required |
| 5 | ITIM Working Group | ITIM Working Group decisions and actions |
| 5 | ITIM Board | ITIM Board decisions and actions |
| 5 | Program Management | Approved Program Management Plan and supporting documentation |
| 5 | Resource Management | Approved investment baseline and execution plan |
| 5 | Resource Management | Approved acquisition baseline |
| 5 | Strategic Planning & EA Management | Approved Target Architecture |
| 5 | Strategic Planning & EA Management | Approved Enterprise Transition Plan |
| 5 | Program Management | Approved CPIC artifacts |
MSC Delivers
Step 4: Prepare Program and Resource Planning Documents
| Functional Area | Artifact | Why | Due Date |
| Program Management | Program Management Plan / Annual Update | Sets the baseline estimates (cost and duration) for projects (cost and duration) and operational & sustainment activities (cost and activity) to be performed across the FYDP. | March |
| Defense Business System (DBS) submit | Any defense business system with a total cost of $1M or more over the FYDP must be reviewed and approved by the DCMO each year before any funds may be obligated for operations and maintenance, acquisition or modernization | April | |
| Acquisition Plan | Builds on the baseline estimates of the PMP to ensure sufficient and correct resources are available to accomplish needs identified in plans | Ongoing | |
| Resource Management | Spend Plan submit | Yearly approved investment baseline based on PMP estimates and annual updates | June |
| Program Objective Memorandum (POM) submit | Final product of the programming process displays the resource allocation decisions of N6 in response to, and in accordance with, the Guidance for Development of the Force (GDF) and Defense Planning Guidance (DPG). The POM shows programmed needs for 5 years. | July | |
| Presidential Budget submit | Output of the Planning, Programming, and Budgeting phases of PPBE is the Defense budget request that will be included in the President’s Budget (PB) to be submitted to Congress not later than the first Monday in February for the next fiscal year than begins 1 October of the same calendar year. | Jan | |
| Contracts and Task Orders | Establishes contract vehicles in order to execute task orders in accordance with an identified plan | Ongoing |
MSC Delivers
Step 4: Prepare Program and Resource Planning Documents
MSC Delivers
N6 Planning Model Execution Activities
Execution Activities High Level Description Program Execution (Step 6) – The lifecycle management of program activities as it relates to the monitoring and controlling of projects and operations & sustainment activities.
Execution Review (Step 7) – N6 internal reviews of a program related the management of cost, time, risk, and performance. These reviews provide data for updates to an approved program management plan.
MSC Delivers
Execution Activities Roles & Responsibilities
| Functional Area Participant | Responsibility |
| Program Management | Provide progress reports for projects and operations & sustainment activities compared to planned status |
Provide program support based on new or changed Risk Management, Quality Management, IPT Management, Configuration Management, Change Management, Service Validation & Testing, and certification requirements Resource Management Conduct Execution Reviews based on approved contract and funding execution performance and the approved investment baseline and execution plan Update investment baseline and execution plan based on Execution Review decisions within defined thresholds Update acquisition baseline based on Execution Review decisions Provide support based on new or changed Human Capital, Contract Management, Acquisition Management, Financial Management, PPBE, and asset management resources
| Portfolio Management | Provide support based on new or current CPIC and/or portfolio reporting requirements |
| Strategic Planning & EA Management | Provide support based on new or changed Strategic Plan Objectives, EA gap analysis, technical architecture requirements |
Maintain Target Architecture baseline Maintain Enterprise Transition Plan baseline
| Cyber Security Operations & Management | Provide support based on new or changed external guidance, compliance, risk management, incident response, continuous monitoring, computer network defense, assess & authorize activities, and reporting requirements |
| Project Management | Manage the execution of projects |
Provide project kickoff information Provide monthly status reports and milestone reviews Provide closeout information for completed or cancelled projects Provide support based on new or change requirements associated to acquisition system engineering, software engineering, Deployment Management, and Project Management Execution Management Manage the execution of operations & sustainment activities Provide support based on new or changed operations and sustainment requirements (Service Delivery & Customer Care, EKMS Management, GSD Operations, Electronics Management, Ship Liaison Management, Asset Management, Configuration Management, Deployment Management, and SLAs)
MSC Delivers
Execution Activities Inputs & Outputs
| Step | Functional Area (Owner) | Input |
| 6 | Program Management | Approved Program Management Plan and expense plan |
| 6 | Program Management | Validated requirements |
| 6 | Program Management | Approved resources and contract support |
| 6 | Program Management | Approved project funding |
| 6 | Resource Management | Approved investment baseline and execution plan |
| 6 | Resource Management | Approved acquisition baseline |
| 6 | Strategic Planning & EA Management | Approved Target Architecture |
| 6 | Strategic Planning & EA Management | Approved Enterprise Transition Plan |
| 6 | Program Management | Program Management decisions and actions within threshold requirements |
| 6 | ITIM Working Group | ITIM Working Group decisions and actions |
| 6 | ITIM Board | ITIM Board decisions and actions |
| Step | Functional Area (Owner) | Output |
| 7 | Project Management | Report to program the status of the project and provide corrective recommendations as required |
| 7 | Execution Management | Operation & sustainment execution results based on SLAs measures |
| 7 | Resource Management | Execution Review decisions and actions |
| 7 | Resource Management | Approved investment baseline and execution plan |
| 7 | Resource Management | Approved acquisition baseline |
| 7 | Resource Management | Financial execution performance reporting |
| 7 | Strategic Planning & EA Management | Target Architecture updates |
| 7 | Strategic Planning & EA Management | Enterprise Transition Plan updates |
| 7 | Program Management | Program execution review decisions and actions |
| 7 | Program Management | Programs outside defined performance threshold requiring update to the 5-year Capability Plan, Integrated Requirements List, and/or the Program Management Plan |
Transition Planning to Execution Phases
| CONOPS | Input | Output |
| Projects | Validated requirements |
Resources and Contract support Funding Approval from ITIM WG or Board to initiative Monthly Status Reports – Cost, Schedule, Scope Project Rebaseline Project Closeouts Project Lessons Learned Approval from ITIM WG or Board to close
| Operations & Sustainment | Service Level Agreements | |
| Funding, resource, and contract support | Service Level reporting |
Financial execution reporting Configuration and asset reporting
OUTPUTS
INPUTS
MSC Delivers
N6 Planning Model Control Activities
Control Activities High Level Description Identify Required Changes to Program Plan (Step 8) – Leverage Execution Reviews information and new or changed requirements to modify and re-prioritize program objectives.
Brief ITIM Working Group on Programmatic Changes (Step 9) – Present programmatic changes that meet threshold reporting requirements to the ITIM Working Group for approval to proceed and/or recommendations.
Annual Closeout / Lessons Learned (Step 10) – Identifies successes, shortcomings and recommended solutions during execution and knowledge or understanding gained by experience. Formally closeout any projects and operations & sustainment activities that have satisfied known requirements.
MSC Delivers
Control Activities Roles & Responsibilities
| Functional Area Participant | Responsibility |
| Program Management | Provide updates to the Program Management Plan based on new execution year requirements outside thresholds |
Provide annual closeouts and lessons learned Maintain program support associated Risk Management, Quality Management, IPT Management, Configuration Management, Change Management, Service Validation & Testing, and certification requirements Present Program Management Plan updates, including recommendations, to the ITIM Working Group as required Develop updated Program Management Plan based on ITIM Working Group decisions and recommendations as required Present Program Management Plan to ITIM Board as required Resource Management Provide support to Program Manager to update Program Management Plan based on new or changed execution year Human Capital, Contract Management, Acquisition Management, Financial Management, PPBE, and Asset Management resource requirements Provide lessons learned Maintain investment baseline and execution plan based on approved changes Manage acquisition baseline based on approved changes Reports financial execution performance Portfolio Management Provide support to update Program Management Plan based on new or changed execution year CPIC and/or portfolio reporting requirements Provide lessons learned Coordinate briefings for the ITIM Working Group and ITIM Board Strategic Planning & EA Management Provide support to update Program Management Plan based on new or changed execution year Strategic Plan Objectives, EA gap analysis, technical architecture requirements Provide lessons learned Maintain Target Architecture baseline Maintain Enterprise Transition Plan baseline Cyber Security Operations & Management Provide support to update Program Management Plan based on new or changed execution year external guidance, compliance, risk management, incident response, continuous monitoring, computer network defense, assess & authorize activities, and reporting requirements Provide lessons learned Project Management Provide support to update Program Management Plan based on new or changed execution year project requirements (acquisition system engineering, software engineering, and Deployment Management) Provide corrective actions and mitigation recommendations when projects do not meet threshold requirements Provide lessons learned Execution Management Provide support to update Program Management Plan based on new or changed execution year operations and sustainment requirements (Service Delivery & Customer Care, EKMS Management, GSD Operations, Electronics Management, Ship Liaison Management, Asset Management, Configuration Management, and Deployment Management) and Service Level SLA requirements Provide corrective action and mitigation recommendations when SLAs that do not meet threshold requirements Provide lessons learned
MSC Delivers
Control Activities Inputs & Outputs
| Step | Functional Area (Owner) | Input |
| 8 | Project Management | Approved project plan |
| 8 | Project Management | Corrective actions and mitigation recommendations for projects not meeting threshold requirements |
| 8 | Execution Management | Corrective actions and mitigation recommendations for SLAs not meeting threshold requirements |
| 8 | Program Management | Proposed program changes based on project and operations & sustainment activities not meeting threshold requirements |
| 8 | Program Management | New requirements impacting the program |
| 8 | Resource Management | Approved investment baseline and execution plan |
| 8 | Resource Management | Approved acquisition baseline |
| 8 | Resource Management | Execution Review recommendations |
| 8 | Portfolio Management | Existing CPIC artifacts |
| 9 | Program Management | Proposed updates to the Program Management Plan |
| 9 | Resource Management | Proposed updates to the investment and acquisition baselines |
| 8, 10 | Program Management | Approved Program Management Plan |
| Step | Functional Area (Owner) | Output |
| 8 | Program Management | Consolidated changes from functional areas for presentation to the ITIM Working Group or ITIM Board as required |
| 9 | ITIM Working Group | ITIM Working Group decisions and actions |
| 9 | ITIM Board | ITIM Board decisions and actions |
| 9 | Program Management | Approved Program Management Plan |
| 9 | Program Management | Program Management decisions and actions within threshold requirements |
| 9 | Project Management | Approved project plan |
| 9 | Resource Management | Approved investment and baseline and execution plan |
| 9 | Resource Management | Approved acquisition baseline |
| 10 | Program Management | Annual Closeout and Lessons Learned documentation |
MSC Delivers
Projects
Project Model Highlights all project requirements for complex projects
MSC Delivers
Project High Level Description Scope and Funding (Step 1) – The program has planned for a project and has a scope of work with approved funding and initial set of validated requirements.
Initiation (Step 2) – Determine if a planned project should proceed or not. Initial outline of the project scope and determine if effort aligns with the strategic priorities of MSC.
Define (Step 3) – An IPT has been established and resources, requirements, and Rough Order of Magnitude (ROM) estimates have been formally documented in a project charter for approval from the ITIM Working Group and or Board as required.
Design (Step 4) – Define the functionality and interfaces, complete hardware and software detailed design, and reduce system-level risk. Establishes the product baseline for all configuration items.
Build (Step 5) –. Focus on development, unit testing and integration testing of the system modules, screens and reports and data replication if required. Includes the development of user procedures and user documentation from the deployment phase.
Test (Step 6) – Strategy for the integrating developmental, operational, test & evaluation, success measures, and addresses resource planning. Testing includes multiple internal milestones to ensure all requirements have been meet before production and/or deployment begins.
Deploy (Step 7) – Prepare and implement the capability to full production, provide training as required, and turn over of the final product to the program to begin operations & sustainment.
Closeout (Step 8) – Once closeout is approved, the program fully executes operations & sustainment activities in support of readiness and operational support performance requirements, and sustains the capability over the life cycle.
MSC Delivers
Project Roles & Responsibilities
| Participant | Responsibility |
| Program Management | |
| Establish Integrated Project Teams (IPT) |
Develops success criteria for projects Develops supporting CPIC documentation as required Provides project requirements, performance work statement, and funding documentation Reports cost and schedule variances outside defined thresholds to the ITIM Working Group and Board as required Plans all IA/cyber packages Approves all IA/cyber packages Participates in IPTs by providing program support based on new or changed Risk Management, Quality Management, IPT Management, Configuration Management, Change Management, Service Validation & Testing, and certification requirements that may impact projects Coordinates the transition from Projects to Operations & Sustainment Reports project closeout and lessons learned to the ITIM Working Group and Board as required Resource Management Participates in IPTs by providing support based on new or changed Human Capital, Contract Management, Acquisition Management, Financial Management, PPBE, and asset management resources Conduct Execution Reviews based on approved contract and funding execution performance and the approved investment baseline for projects Update investment baseline for projects based on Execution Review decisions within defined thresholds Portfolio Management Participates in IPTs by providing support based on new or current CPIC and/or portfolio reporting requirements Coordinate briefings for the ITIM Working Group and ITIM Board
| Strategic Planning & EA Management | Participates in IPTs by providing support based on new or changed Strategic Plan Objectives, EA gap analysis, technical architecture requirements |
| Cyber Security Operations & Management | Participates in IPTs by providing support based on new or changed cyber requirements identified via external guidance, compliance, risk management, incident response, continuous monitoring, computer network defense, and assess & authorize activities |
Validates IA/cyber packages Project Management Receives operational and functional requirements from Program Management Provides inputs to program management to create project charters Leads IPTs and provides input on acquisition system engineering, software engineering, Deployment Management, and Project Management Develops IA/cyber packages Review validated IA/cyber packages Develops project documentation in support of cost, schedule, scope, and risk Reports project performance report to Program Management to include variances to cost, schedule, scope, and risk Receives operational and functional requirements from program management Develops and delivers other project management artifacts as required by Program Management Reports project risk and status to Program Management Execution Management Participates in IPTs by providing supporting based on input based on operations & sustainment requirements (Service Delivery & Customer Care, Electronic Key Management System (EKMS) Management, Global Service Desk (GSD) Operations, Electronics Management, Ship Liaison Management, Asset Management, Configuration Management, Deployment Management) and Service Level Agreements (SLA) requirements Provides warranty support for delivered capabilities based on SLAs and funding
MSC Delivers
Project Inputs & Outputs
| Step | Owner | Input |
| 1 | Program Management | Approved CRQ |
| 1 | Program Management | Validated Requirements |
| 1 | Program Management | Funding documentation |
| 2 | Program Management | Notification or approval from ITIM Working Group that a project will kick-off |
| 3 | Project Management | Project Charter |
| 3 | Project Management | Business Case Analysis (BCA) if required |
| 3 | Project Management | Developed project deliverables in support of cost, schedule, scope, and risk |
| 4-8 | Project Management | Updated project deliverables in support of cost, schedule, scope, and risk |
| 4-8 | Cyber Security Operations & Management | Updated artifacts in support of Certification & Accreditation, external guidance, compliance, risk management, incident response, continuous monitoring, computer network defense, and assess & authorize activities |
| 4-8 | Strategic Planning & EA Management | Updated artifacts in support of the Strategic Plan, EA gap analysis, and technical architecture |
| 4-8 | Program Management | Program Management decisions and actions within threshold requirements |
| 3-8 | ITIM Working Group | ITIM Working Group decisions and actions as required |
| 3-8 | ITIM Board | ITIM Board decisions and actions as required |
| Step | Owner | Output |
| 1 | Program Management | Validated scope and funding availability |
| 2 | Project Management | Established IPT |
| 2 | ITIM Working Group or Board | ITIM Working Group receipt of project kick-off notification or approval to proceed |
| 3 | Project Management | Approved Project Charter |
| 3 | Project Management | Approved BCA if required |
| 3 | Project Management | Define project phase milestone approval – detailed requirements documented |
| 4 | Project Management | Design project phase milestone approval – technical description of proposed solution |
| 2-8 | Project Management | Maintained or updated project documentation in support of cost, schedule, scope, and risk |
| 5 | Project Management | Build project phase milestone approval – stakeholder review or build and integration activities |
| 6 | Project Management | Test project phase milestone approval – operational/functional and user acceptance testing complete |
| 7 | Project Management | Deploy project phase milestone approval – deployments have been verified |
| 7 | Project Management | Transition documents to Program Management to begin operations & sustainment of delivered capability |
| 8 | Project Management | Project closeout and lessons learned |
| 3-8 | Project Management | Monthly Project Status Report |
| 4-8 | Cyber Security Operations & Management | Updated or maintained IA artifacts |
| 4-8 | Strategic Planning & EA Management | Updated EA artifacts |
| 4-8 | Program Management | Program Management decisions and actions within threshold requirements |
| 3-8 | ITIM Working Group or Board | ITIM Working Group decisions and actions as required |
| 3-8 | ITIM Working Group or Board | ITIM Board decisions and actions as required |
MSC Delivers
Operations & Sustainment
Operation & Sustainment High Level Description Management Layer – Provides the guidance on achieving effectiveness and efficiency in the delivery and support of service to ensure value for the customer. Management layer guidance includes input on how to maintain stability, and integrating with planning functions to allow for changes to design, scale, scope, and service levels.
Technical Layer – The disciplines and practices executed in order to deliver services and capabilities to the customer. The technical layer provides the day-to-day operational and sustainment support and management to MSC using defined process and procedures.
MSC Delivers
Operations & Sustainment Model
MSC Delivers
Operations & Sustainment Roles & Responsibilities
| Participant | Responsibility |
| Program Management | |
| Provide changes to current or planned operational activities based new or changed capabilities |
Provide analysis of reports for operations & sustainment activities compared to planned status Consolidates reported requirements Provide support based on new or changed Risk Management, Quality Management, Integrated Project Team (IPT) Management, Configuration Management, Change Management, Service Validation & Testing, and certification requirements Resource Management Update investment baseline and execution plan based on operations & sustainment financial performance Update acquisition baseline based on Execution Review decisions Provide support for operations & sustainment activities based on new or changed Human Capital, Contract Management, Acquisition Management, Financial Management, PPBE, and asset management resources
| Portfolio Management | Provide support based on new or current CPIC and/or portfolio reporting requirements |
| Strategic Planning & EA Management | Provide support based on new or changed Strategic Plan Objectives, EA gap analysis, technical architecture requirements |
Maintain Target Architecture baseline Maintain Enterprise Transition Plan baseline Cyber Security Operations & Management Ensure systems security and compliance Manages cybersecurity components of the IT infrastructure Receives and manages directives and guidance from external agencies Provide input to Change Management as it relates to the support of new requirements Reports status based on new or changed cyber requirements identified via external guidance, compliance, risk management, incident response, continuous monitoring, computer network defense, and assess & authorize activities
| Project Management | Does not directly interface with operations & sustainment |
| Execution Management | Executes the daily operational activities needed to manage the IT infrastructure |
Provides technical management of the IT infrastructure (days-to-day operations, performance and capacity, third-party services, service desk and incidents, configuration baseline, data, the physical environment) Monitors all events throughout the IT infrastructure Restores degraded or disrupted services within the IT environment Performs root-cause analysis to determine incident cause and minimize future incidents Fulfills service request through GSD support, COMSEC Management, Installation Support Grants and monitors access to users of specific services Identifies new or emergent requirements for planning and executing Provide input into the ongoing design and refinement of the architectures and IT services Reports performance and other measures to Program Management Define and manage service levels Ensures continuous service Provides training and instruction Provide input to Change Management as it relates to the support of new requirements Provide input to Resource Management and Program Management as it relates to cost and resource needed to maintain or increase services
MSC Delivers
Operations & Sustainment Inputs & Outputs
| Owner | Input |
| Program Management | Transition Plan from project to operations & sustainment identifying resources and contract support |
| Program Management | Approved operations & sustainment funding |
| Program Management | Trade study results in support of system modifications |
| Program Management | Risk assessment |
| Program Management | Defined service level requirements as it relates to IT system or application performance to include event, incidents, performance |
| Strategic Planning & EA Management | Approved Target Architecture |
| Strategic Planning & EA Management | Approved Enterprise Transition Plan |
| Resource Management | Approved investment baseline and execution plan |
| Cyber Security Operations & Management | Directives and guidance from external agencies |
| Owner | Output |
| Execution Management | Analysis or reports based on IT infrastructure configurations, events, incidents, and performance based on Service Level Agreements |
| Execution Management | Updated Service Level Agreements |
| Execution Management | Updated configuration and asset baseline based on changes to the IT infrastructure |
| Execution Management | New or changed requirements based on support of the IT infrastructure |
| Cyber Security Operations & Management | Reports related to the cyber security risk and compliance to external agencies as required |
| Cyber Security Operations & Management | Reports related to the cyber security risk and compliance to Program Management as required |
| Cyber Security Operations & Management | New or changed requirements based on cyber risk and compliance |
| Strategic Planning & EA Management | Target Architecture updates |
| Strategic Planning & EA Management | Enterprise Transition Plan updates |
MSC Delivers
Road Ahead Final Approval Publish and socialize Transfer of ownership to N63 Mission Support Develop training Use as a guide for developing and reviewing all N6 SOPs
Proactive management needed to avoid having the Overarching IT Governance Framework from becoming shelf-ware image4.emf image5.emf image6.emf image7.png image8.png image9.emf image10.png image11.png image1.jpeg image2.png image3.png