SOW_20-008SSDG1RepairsSOW.docx
DOCX document 34 KB Posted
- Attached to
- FMSNA Ship Service Diesel Generator No. 1 Repair
- Solicitation number
- N3220519Q6873
About this file
SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TAX_LIABILITY.docx | DOCX document | |
| COMBINED_SYNOPSIS_SOLICITATION_19Q6783.docx | DOCX document | |
| Redacted_EPF_JA_FMSNA_SSDG_IDIQ_N00L_SIG_9.19_(002)_-_Copy.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS YUMA
(T-EPF 8)
MACHINERY, AUXILIARY
| 10 Sept 2019 | ||
| ITEM NO. SO-20-008 | CATEGORY “A” | MSC/N758/VPN |
SSDG #1 Repairs
1.0 ABSTRACT
1.1 This item describes technical services for the repair to the Ship’s Service Diesel Generators (SSDG) #1 during the Oct 2019 VR.
2.0 REFERENCES:
2.1 EL-1 SSDG Hot and Cold Checks Demonstration
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Locations:
3.1.1 Generator Room 1
3.2 Quantity:
3.2.1 SSDG #1
4.0 GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICE: None
5.0 NOTES:
5.1 Performance Period:
5.1.1 17 Oct – 7 Nov 2019
5.2 Location of Work:
5.2.1 OCONUS, 6th Fleet
5.3 Port Engineer:
5.3.1 Van Nguyen
| Cell: | 757-469-8336 |
| Email: | van.p.nguyen1@navy.mil |
5.4 Contact the Port Engineer for details and requirements concerning access to an MSC vessel.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1 The Contractor shall be an authorized Fincantieri Marine Systems North America, experienced with IFV1312C2ME-HPCR engines and the EPF Class. Vessel Crew members will assist.
7.2 OEM Rep shall travel to ship location for the performance periods specified.
7.3 OEM Rep will provide parts and labor to conduct repairs to the SSDG #1 during the Oct 2019 VR.
7.4 OEM will help expedite any emergent material needs to support scheduled underway operations.
7.5 Submit as found condition report, any additional work shall be handle via change order.
7.6 Contractor shall use Reference 2.1 as guidance.
7.7 OEM shall provide parts, tools and materials to accomplish the repairs. Check in upon arrival with the Chief Engineer and discuss the most current status and all discrepancies affecting Generator operations. Contractor shall perform all work to OEM specifications.
7.8 Vessel will process any waste fluids or waste materials associated with this work item.
7.9 Vessel will furnish make-up oil and coolant associated with this work.
7.10 Contractor shall install and maintain containments on all engines while engines are open to the engine room. POP is during a shipyard availability with industrial work occurring concurrently within the engine rooms.
7.11 Contractor shall perform an operational dock trial with ship’s crew for each engine to verify all disturbed components are re-assembled properly and leak free.
7.12 The contractor is responsible for cleaning areas affected and disturbed by the maintenance performed as referred in work item 0611.
7.13 Inspection/ Testing
7.13.1 Contractor shall perform an operational test of Ship Service Diesel Generators with electrical load applied upon completion of all work in the presence of Chief Engineer’s representative.
7.13.2 Contractor shall also demonstrate all emergency stops as required by ABS for regulatory requirements
7.13.3 Completion test shall include operation of engine with Vessel representative and contractor shall fill out the IF Running Log.
7.13.4 Final completion report shall be furnished in electronic format and must include the following to be considered complete.
7.14 Manufacturer’s Representative:
Teresa Digges Contracts/Project Administrator Fincantieri Marine Systems North America, Inc.
Ingleside, TX 78362 Phone: (361) 758-7198 ext. 102 Cell: (757) 685-2248
FAX: (361) 758-7853
8.0 GENERAL REQUIREMENTS: None additional.
SO-20-008 - 3
File details come from the government source that posted it.