N3220519Q6534_SOW.docx
DOCX document 23 KB Posted
- Attached to
- USNS COMFORT Annual Life Raft Service
- Solicitation number
- N3220519Q6534
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MSFSCSWIRRR002.doc | DOC document | |
| N3220519Q6534_COMBINED_SYNOPSIS_SOLICITATION.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS Comfort (T-AH 20 )
| HABITABILITY OUTFITTING AND FURNISHINGS |
| CONTRACT NO. Service Order |
| ITEM NO. 0612 |
| CATEGORY "A" |
| 2019-02-20 |
| LIFERAFT ANNUAL |
| Destree, Steve |
1.0 ABSTRACT
1.1 This item provides for the inspection and testing of the ship’s inflatable life rafts by a certified United States Coast Guard (USCG) repair facility.
2.0 REFERENCES
2.1 MSC Standard Item No.002, LIFE RAFT INSPECTION AND REPAIRS.
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity
3.1.1 01 Level, Frames 32 thru 84 Port/Stbd
3.1.2 Five (5) groups of twenty (20) 25-man Elliot DL IV life rafts. Total 100 rafts.
3.1.3 Ship location: Pier One (1) Naval Station Norfolk.
3.1.4 Period of Performance (POP): First Group: 01 – 31 March 2019 Second Group: 01 – 30 April 2019 Third Group: 01 – 31 May 2019 Fourth Group: 01 – 30 June 2019 Fifth Group: 01 – 31 July 2019
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES:
5.1 The contractor and all subcontractors regardless of tier shall consult the General Technical Requirements (GTRs) to determine applicability to this work item. In the performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs including but not limited to GTR 1 through 7.
5.2 This service order is broken up into Five (5) performance periods, which coincides with the expiration dates of the rafts in “that group”.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
7.0 STATEMENT OF WORK REQUIRED
7.1 Perform all work as delineated in ref.2.1. Work on the life rafts shall be done only in a facility that is certified by the United States Coast Guard for servicing, repairing and testing of life rafts.
NOTE: Life rafts shall be davit load tested.
7.2 Provide all rigging and crane services and transportation to deliver the life rafts and Hydrostatic Releases to the USCG approved facility for servicing, repair and testing ELLIOT life rafts. Provide a crane and labor to replace twenty (20) rafts each time with the newly certified rafts. The newly certified rafts shall be delivered to the ship located as per paragraph 3.1. NOTE: Coordinate with the ship when delivery will occur.
7.2.1 Plan and submit the coordination of all crane movements with Naval Station Norfolk Surveillance. Port Engineer will act as “sponsor” for the crane operation requirement.
7.2.3 Plan for a minimum of two (2) crane operation requirements for each POP.
| 7.3 | All items, which are required to be replaced annually (i.e. flashlight batteries, repair glue kit, container bands, matches, decals, beaconed interior light battery packs), shall be included in the original quote. Additional items to replace are: |
| 20- Label, MK4 DL part 1 | (each group) |
| 20- Label, MK4 DL part 2 | (each group) |
| 20- Label, MK4 DL part 3 | (each group) |
| 20- Label, This side up | (each group) |
20- Label, Elliot visual launch instruction (each group)
7.4 Additional items to be replaced shall be addressed by a change order. All items which have, or about to, expire shall be replaced. These items shall be listed in a condition found report and turned over to the port engineer in a timely manner.
7.5 All hydrostatic releases, (for each group), shall be temporarily removed and tested IAW applicable regulations and USCG rules.
7.6 Dispose of condemned life rafts after turning over the raft serial numbers to the port engineer.
7.7 Upon completion, furnish certificates as per ref 2.1 and in PDF format (on a CD/DVD) and original paper copies to the port engineer.
8.0 GENERAL REQUIREMENTS
8.1 The contractor shall provide all labor, materials, and equipment required to accomplish this specification item.
8.2 The contractor shall remove and replace interferences necessary to accomplish this specification item.
8.3 All tests and inspections required by this item shall be performed in the presence of an USCG Inspector if so desired by the local MSO.