N32205-18-R-4550_0005.docx

DOCX document 52 KB Posted

Attached to
USNS APACHE (T-ATF 172) Federal contract opportunity
Solicitation number
N32205-18-R-4550
Issued by
Department of the Navy Military Sealift Command

About this file

Amend 0005

View the file

Other files for this federal contract opportunity

Other files attached to USNS APACHE (T-ATF 172), newest first.
File Type Posted
APACHE_AWARD_NOTICE__2-16-18.docx DOCX document
N3220518R4550_0004.docx DOCX document
N32205-18-R-4550_0003.docx DOCX document
N32205-18-R-4550_AMENDMENT_00002.docx DOCX document
Consolidated_QAs.pdf PDF
N32205-18-R-4550_Amendment_0001.docx DOCX document
Solicitation_Clarification_QAs.pdf PDF
J-Attachments.zip ZIP file
N32205-18-C-4550_USNS_APACHE_SOL..docx DOCX document
APACHE_JA_FY18_ROH-DD_(REV.E)_9.17_RED_REV_A.pdf PDF
SYNOPSIS_N32205-18-R-4550_REV_A.pdf PDF
APACHE_JA_FY18_ROH-DD_(REV.E)_9.17_RED.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220518R4550

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

GENERAL

1. The Contractor shall prepare for and accomplish the voyage repairs, overhaul, or alterations of the USNS APACHE (T-ATF 172) as specified herein and IAW the Work Item (WI) package as provided in Attachment J-1 – WI Package (Specifications). Unless otherwise specified, all work shall be performed at the contractor’s shipyard.

2. In performing the WIs specified, the contractor shall be responsible for all of the following related work (in case of a discrepancy, the terms and conditions stated in the WIs take precedence over the following terms and conditions):

(a) Providing the necessary management, procurement, production, testing, technical capability and resources, and quality assurance services.

(b) Ensuring the timely procurement of Contractor-Furnished Material/Contractor-Furnished Property (CFM/CFP) and the timely reporting, receipt, storage, installation, and accountability of Government-Furnished Material/Government-Furnished Property (GFM/GFP) (IAW FAR Clause 52.245-1 and DFARs Clauses 252.211-7007, 252.245-7001, 252.245-7002, 252.245-7003, and 252.245-7004).

(c) Using progress measurement systems to determine the physical progress of completed work for each of the elements in the scheduling plan, including material and manpower control, engineering, production, tests and trials IAW the Contract Data Requirements List (CDRL) and the contractor's own Technical Proposal, and the WI package. The progressing system shall permit a direct comparison of the physical progress of completed work to the planned performance measurement baseline for each of the elements in the scheduling plan.

(d) Using management procedures and systems to identify behind schedule conditions and unfavorable schedule variance based on the Time Phased Sequencing Network (TPSN) submitted with the contractor’s proposal. The applied procedures and systems shall provide timely identification of scheduling problem areas to permit prompt management action to correct unsatisfactory conditions.

(e) Developing a performance milestone schedule/critical path chart to measure scheduled performance. Deviations from the milestone schedule/critical path chart dates in WI 013 must be submitted to and approved by the KO. A performance milestone schedule and critical path chart shall be developed and submitted in accordance with the WI Package. The performance milestone schedule shall include and clearly identify primary and parallel critical paths. The resource loaded performance milestone schedule shall include, at a minimum, those milestones identified in WI 013.

(f) Using approved quality control procedures as required by this contract and the WI package to ensure procured material and performed production work conforms to the required quality standards.

(g) Ensuring the ship's equipment and systems remain configured to existing baselines with regard to procured material, production work, and software.

(h) Applying stringent configuration control procedures to ensure that configuration baselines are maintained for procured material and production work.

(i) Providing for staging and storing of material (both Government-furnished and contractor-furnished) and Long Lead Time Material (LLTM) for use in the availabilities from the date of award.

(j) Managing all sub contractors performance during the availability. Ensure subcontractor work is to the same quality and standards as expected from the prime contractor. Develop and maintain a subcontractor management plan. The plan shall ensure that all communication and control of subcontractors is maintained by the prime contractor.

(k) Employing good judgment and sound engineering practice and principles, particularly when WIs does not describe all details of accomplishing the work. The contractor shall be expected to have, either organically or through subcontractors, access to competent engineers who have a history of working solutions in a maritime environment.

3. Contract work shall be performed by an eligible contractor as defined below.

(a) The contractor shall be capable of performing the full scope of the requirement stated herein within its own facilities, utilizing its own shop(s) and work force, or be capable of subcontracting for these elements beyond its managerial, technical, or physical capability or capacity. The contractor shall assume full responsibility for the integrated scheduling, cost, and quality of subcontractor performance.

(b) The contractor shall be a company recognized as engaged in ship repair work and possess an organization capable of the full scope of planning, engineering, quality control, shipboard/off ship production and component/system testing and trials. The contractor shall provide industry certifications such as, Master Ship Repair Agreement (MSRA), Agreement for Boat Repair (ABR), or International Organization for Standardization (ISO) Certification that would further emphasize the contractor's ability to perform the work. To be determined responsible, the contractor shall submit acceptable evidence to demonstrate the prospective contractor's ability to accomplish the work. This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and/or subcontractors) at the time of award. The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm's eligibility for contract award: To be determined responsible, a prospective contractor must possess an MSRA, ABR or submit acceptable evidence in lieu of the aforementioned to effectively communicate and demonstrate the prospective contractor’s ability to obtain required resources.

This will include a conclusive demonstration of having the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors) at the time of award.

The contractor’s proposal shall provide a documented and positive demonstration of established organizational elements as set forth below. These characteristics will be evaluated to determine a firm’s eligibility for contract award:

a. Administration/Management Control. Established organization geared toward ship repair at all levels of size, value and complexity, and toward technology innovation and process improvement. Clear lines of authority. Delegation of responsibility. Mid-level managerial positions in place. Competent and experienced employees with ship repair experience. Capability to develop and integrate planning, estimating and scheduling functions. Defined managerial responsibilities for production, quality assurance, material procurement/control and subcontractor control.

b. Financial Control. Segregation of accounting costs. Adequate accounting system. Favorable cash flow-ratios. Availability of a line of credit or other source of financial income to support the work effort. Prompt payment of subcontractors and suppliers.

c. Production Control. A production organization. On board (or ability to obtain) trade mix/skills to perform ship repair work. Control of production efforts. Integration of other key functions with production. Use of scheduling techniques. Methods of progressing. Training available to trades employees.

d. Production Technical Support. Engineering and design support capabilities (in-house or subcontracted) with sufficient capability to diagnose and evaluate technical problems and issues and to make competent technical recommendations to MSC when necessary and appropriate. They shall be fully cognizant of ABS rules and USCG regulations and how they apply and impact this specification package

e. Material/Procurement Control. A material purchasing department with staff. Procedures for control of material (purchasing, monitoring, receipt, inspection, segregation, issuance, nonconformance and disposal). An inventory system – ordering, tagging warehousing. CFM/GFM storage, control and protection. Existing environmentally-controlled warehouse space. Material handling equipment. Familiarity with the Navy logistics support system.

f. Subcontractor Control. Procedures for selecting, scheduling, managing, monitoring and controlling subcontractors.

g. Quality Control/Test and Trials. A quality control organization/department/staff. Quality assurance procedures/manual. Calibration and metrology system availability. Test memo writing capability. Nondestructive Testing capabilities. Welding procedures and welders’ qualifications. Ability to perform trend analysis. Quality control system shall be certified or equivalent to ISO 9001:2001 standards

h. Safety/security. Safety Organization/Manager or Engineer. Safety manual/procedures. Safety training. First-aid capabilities or medical services. Fire protection/procedures. Physical yard security/security procedures.

i. Hazardous Material/Waste Control. Proper procedures and facilities to meet the legal requirements for removal, storage and disposal of hazardous waste. Segregated storage. Documentation of licensed subcontractors responsible for control of hazardous waste removal, storage and disposal. Appropriate state/federal agency issued hazardous waste generator number. Disposal records which indicate type of material, date and place of disposal.

j. Facilities. Although facility requirements may vary with the work authorized for a specific ship, the contractor must be a ship repair company that possesses or has available the following facilities:

· Pier, with services in place in which the CLASS size ship can access and be berthed at

· Structural Shop

· Machine Shop

· Pipe Shop

· Electrical/Electronic Shop

· Carpentry Shop

· Rigging Equipment

· Dry-dock – when required for docking of vessel in performance of the specification

(c) The government reserves the right to perform site survey for verification of policies, procedures, capabilities and facilities prior to award.

C – 2 List of Standard Work Items included for this solicitation:

WORK ITEM INDEX REPORT

Item Number
Title
Category
SECTION 0000
GENERAL SERVICES AND REQUIREMENTS
0001
INTENT SCOPE GEN REQUIREMENTS DEFINITIONS APA
N
0002
TECHNICAL REPRESENTATIVES APA Rev B
N
0003
APPROACH BERTH AND MOORING Apache Rev B
N
0004
TESTING AND QUALITY ASSURANCE Apache Rev B
N
0005
ELECTRICAL SAFETY PROCEDURE REQUIREMENTS Apache
N
0006
HEAVY WEATHER PLAN Apache
N
0007
COLD WEATHER PLAN Apache
N
0010
FURNISH OFFICE FOR OMT Apache1
A
0011
GENERAL SERVICES FOR SHIP T ATF REV APR 2010 APA
A
0012
TELEPHONE SERVICES Apache
A
0013
PROJECT PLANNING AND MONITORING Apache Rev B
A
0014
WEIGHT MOMENT REPORT Apache
A
0015
ILS GFM Apache
A
0016
FIRE PROTECTION AND SHIPS SAFETY PROGRAM Apache Rev B
A
0017
HANDLING SHIPS STORES APA
A
0018
DELIVERY AND REDELIVERY APA
A
0019
SHIPBOARD ACCESS APA
A
0020
GAS FREE CERTIFICATES APA
A
0021
CLEAN AND GAS FREE TANKS VOIDS AND COFFERDAMS APA
A
0022
DOCK TRIALS AND SEA TRIALS, APA
A
0023
HAZARDOUS WASTE DISPOSAL, APA
A
0024
PHYSICAL SECURITY AT PRIVATE CONTRACTORS FACILITY
N
0025
PHYSICAL SECURITY AT PRIVATE CONTRACTORS FACILITY
B
0030
CONTINUATION OF SERVICES, APA
B
SECTION 0100
HULL AND STRUCTURAL
0101
CHT LINING INSPECTION
A
0102
BALLAST AND FUEL OIL TANK INSPECTIONS
A
0103
GENERAL STEEL WORK
A
0104
CHAIN LOCKER PRESERVATION
A
0105
HOUSE PAINTING AND PRESERVATION
A
0106
ENGINE ROOM BILGE PRESERVATION
A
0107
REPAIRS TO BALLAST TANKS
A
0108
REPAIR FUEL OIL TANK #8
A
0109
OPEN, CLEAN, AND INSPECT TANK VENT GOOSENECKS
A
SECTION 0200
PROPULSION MACHINERY
0201
PORT AND STARBOARD PROPULSION MAIN ENGINE 360 INSP
A
SECTION 0300
ELECTRICAL
0301
EOS AUTOMATION SYSTEM CALIBRATION AND MAINTENANCE
A
0302
BATTERY CHARGER UPGRADE INSTALLATION AND SERVICING
A
0303
SWITCHBOARD AND MOTOR CONTROLLER CLEANING INSPECTI
A
0304
BATTERY CHARGER UPGRADE INSTALLATION AND SERVICING
A
SECTION 0400
COMMUNICATION AND NAVIGATION
0401
Radar Preventive Maint Apache
A
0402
GMDSS Recertification
A
0403
STD 22 Gyro Groom
A
0404
TV DTS System PM
A
0405
SPEED LOG REPLACEMENT
A
0406
ECHOSOUNDER REPLACEMENT
A
0407
Wind Bird Calibration
A
SECTION 0500
AUXILIARY MACHINERY
0501
LIFT STATION INTERNAL PUMP REPLACEMENT
A
0502
SW COOLING VALVES AND HEADER
A
0503
OVERHAUL ANCHOR WINDLASS HYDRAULICS
A
0504
INSPECT PRESSURE VESSELS AND REFLIEF VALVES
A
0505
ANNUAL FIRE FIGHTING INSP AND TEST
A
0506NR 1 FIRE PUMP MOTOR REPAIRA
SECTION 0600
HABITABILITY OUTFITTING AND FURNISHINGS
0601
SOLAS DAVIT EXTENSION INSERT AND CONSTANT TENSION
A
0602
MAIN DECK ROLLERS OVERHAUL
A
0603
REPLACE WATER TIGHT DOORS 3
A
0604
MSD INSPECTION
A
0605
ANNUAL MAINTENACE AND CERTIFICATION OF SHIPS CRANE
A
0606ANNUAL LIFE RAFT SERVICE APACHEA
SECTION 0800
HVAC
0801
CLEAN SHIPS HVAC DUCTING
A
0802
FIRE DAMPERS INSPECTION AND REPAIR Rev B
A
0803
VENT FANS AND MOTORS REBUILD
A
SECTION 0900
DRYDOCKING
0901
DRY-DOCKING AND UNDOCKING APA March 2018
A
0902
STEERING PISTONS,LINKAGE,OVERHAUL
A
0903
RUDDER REMOVAL REPAIR
A
0904
SHAFTING, CPP, PROPELLER OVERHAUL
A
0905
PROPELLER SHAFT WEAR DOWN READINGS
A
0906
SEA VALVES AND OVERBOARD DISCHARGE VALVES
A
0907
BOW THRUSTER OVERHAUL
A
0908
KORT NOZZLE AIR TESTS ABS
A
0909
PROPELLER POLISHING REPAIR SPECIFICATION
A
0910
FREEBOARD PRESERVATION
A
0911
HULL ZINC PROTECTORS
A
0912
HOSES CPP AND STERN TUBE LUBE OIL SYSTEMS
A
0913
CATHODIC PROTECTION
A
0914
U T READINGS SURVEY ABS
A
0915
UNDERWATER BODY PAINT AND HULL PRESERVATION Rev A
A
0916
ANCHORS AND CHAINS PRESERVATION
A
0917
DOCKING AND UNDOCKING EXTRA DAYS
B
0918
SKEG INSPECTION
A

(End of Summary of Changes)