J-11_Dry_Dock_Eval_Form.pdf
PDF 293 KB Posted
- Attached to
- USNS HUMPHREYS (T-AO 188) ROH/DD Federal contract opportunity
- Solicitation number
- N3220518R4013
View the file
Other files for this federal contract opportunity
Show all 50
USNS HUMPHREYS (T-AO 188) ROH/DD has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J – 11
MSC DRYDOCK EVALUATION FORM
Ship name: USNS JOSHUA
HUMPHREYS
Hull No: T-AO 188
PART A (to be completed by MSC) PART B (to be completed by ALL shipyards)
Drydock Certification / Classification Info
Shipyard name
Drydock No.
Drydock Type Graving Floating Marine Railway
Certified? Yes No
Certifying / Classifying Agency
Certificate No.
Date of expiration
Ship Characteristics English measure Metric measure Provide date in English and Metric Units:
Length, overall ft - in 0.0 m Drydock Characteristics
Breadth, molded ft - in 0.0 m Length, overall ft-in m
Draft, light load line ft - 0 in 0.0 m Breadth ft-in m
Gross Tonnage (U. S.) Tons MT
Displacement, Full Load LT MT Maximum drydock lift capability LT MT
Minimum Displacement/Draft
Displacement LT MT
Draft - forward ft - in m Maximum entry draft rating: LT MT
Draft – aft ft - in m
Max stern trim for graving dock ft - in m Water depths around dock ft-in m area and approaches, tidal conditions, Anticipated Arrival Draft and any unusual conditions for entering/
Draft - forward ft - 0 in m leaving the drydock.
Draft - aft ft - 0 in m
Depth Over Floor ft-in m
Positioning Clearances Depth Over Blocks ft-in m
Bottom: keel to drydock floor ft - 0 in m Depth Over Sill ft-in m
Side: hull to drydock wall ft - 0 in m Depth Over KEEL ft-in m
Loading Pressures
ATTACHMENT J - 11
Max block loading Tons Per square ft. per sq mtr
Note: All blocks to be positioned under longitudinal strength members and transverse bulkheads.
Max Block Loading Capability
Blocking Requirements Block Capability LT/ft2 LT/m2
Construction Hard
Wood
Keel & Side Block Information
Cap material Soft
Wood
Construction
Cap thickness (min) 2 Cap Material
Side blocks (e.g., shaped, wedged, etc.) Shape d
Cap Thickness in cm
Block Age
Hardwood: White Oak, California Laurel, Oregon Myrtle, Iron bark, Height ft-in m
Blue Gum, American Rock Elm or Preserved Red Oak. Width ft-in m
Softwood: Douglas Fir, Tamarack, Long Leaf Pine or Hemlock Length ft-in m
MSC DRYDOCK EVALUATION FORM (cont’d)
PART A (to be completed by MSC) PART B (to be completed by ALL shipyards)
Provide data in English and Metric units
Minimum Required Services
Electrical power Minimum Available Services
AC volts 450 VAC Electrical power number of phases 3 AC volts VAC amperage (total) 2400 Amps number of phases frequency 60 Hz amperage (total) amps number of lines 6 frequency Hz number of lines
Ground connections number 2 Ground connections cable size, each 500,000 cir mils number cable size, each cir mils
Sewage connections number 1 Sewage connections pipe size 2 1/2 inch ips number capacity 1,000 gals per day 3,785 liters per day pipe size inch ips cm capacity gal/day ltr/day
Fire Main number of connections 2 Fire Main connection size 2 1/2 inch ips number of connections pressure 125 Psig 8.8 kg per sq cm connection size inch ips cm capacity 1,000 gals per min 3,785 liters per min pressure psig kg/m2 capacity gpm ltr/min
Aux Seawater pressure 100 Psig 7.0 kg per sq cm Aux Seawater capacity 600 gals per min 2,271 liters per min pressure psig kg/m2 capacity gpm ltr/min
Fresh Water pressure 60 Psig 4.2 kg per sq cm Fresh Water capacity 100 gals per min 378 liters per min pressure psig kg/m2 capacity gpm ltr/min
Compressed Air pressure 125 Psig 8.8 kg per sq cm Compressed Air capacity 200 cu ft per min 5664 liters per min pressure psig kg/m2 capacity cfm ltr/min
Shore Steam pressure 100 psig 7.0 kg per sq cm Shore Steam capacity 6,000 lbs per hour 2,722 kg per hour pressure psig kg/m2 capacity lb/hr kg/hr
High Pressure Water Wash pressure 3,000 psig 211 kg per sq cm
High Pressure Water Wash pressure psig kg per sq cm
Safety Response Plans Required Safety Response Plans Available (circle correct answer)
Firefighting Yes X No Firefighting Yes No
Flooding (accidental) Yes X No Flooding (accidental) Yes No
Earthquake Yes No X Earthquake Yes No
Typhoon Yes No X Typhoon Yes No
MSC DRYDOCK EVALUATION FORM (cont’d)
PART C (to be completed by Shipyard if drydock is not certified by IACS or under MIL STD 1625C)
Dockmaster info
Contractor name
Dockmaster name
Certifying Agency
Certificate No.
Years experience
Drydock Insurance Info
Is Drydock insured? Yes No
Insurer
Policy No.
Amount Insured
Date of expiration
MSC SHIP REPAIR FACILITY SURVEY
NOTE: If survey form has been previously submitted, then enter changes only.
Commander (Code M-4E3)
Military Sealift Command
Norfolk, VA 23511-4419
SHIPYARD AND ADDRESS SHIPYARD DATA
Telephone No:
Telex No:
Date Found:
BUILDING WAYS (M. I. W.)
NO. LAUNCHING DIMENSIONS MAXIMUM SHIP
SIZE
OF (check one) (ton 2,240 lbs)
WAY
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
DEPTH: DEPTH:
[ ] END LENGTH: LENGTH:
[ ] SIDE
[ ] BASIN WIDTH: WIDTH:
[ ] SLAB
LENGTH OF LAUNCHING RUN DEPTH OF RUN AT M.L.W.
DEPTH OF WATER
OVER
WAY END
AT DROP
OFF
NO.
CRANES SERVING WAY
TYPE
LIFT CAPACITY
(std. tons)
CERTIFICATION DATE &
CERTIFIED BY WHOM
TIDAL RANGE (DIFF. OF M.L. M.H) IS FIRE PROTECTION AVAILABLE
ON BUILDING WAY?
YES NO
IS SNUBBING NECESSARY?
YES NO
MSC SHIP REPAIR FACILITY SURVEY (continued) SHIPYARD:
BERTHS OF SHIPS (Piers, Wharves, Bulkheads, etc.) DRY DOCKS (means high water)
TYPE
LENGTH
(actual & usable)
ACT:
USE:
WATER DEPTH
(M. L. W.)
IN-
BOARD
OUT-
BOARD
HEIGHT
OF
DOCK
(M.L.W.)
USE
REPAIR/
OUTFIT-
ING
SERVICES AVAILABLE
(Use abbreviation of service below)
DOCK
MATERIAL TYPE
Floating--(FD)
Graving--(GD) Marine Railway (MR)
DRY DOCKS (continued)
DOCK
MAXIMUM SHIP SIZE
ACCOMMODATED
LENGTH OA-BEAM
LENGTH
at coping (GD), at keel blocks
OVERALL on cradle (MR), on PONTOON
(FD)
CLEAR WIDTH
at top cradle (MR), at keel at top inboard block wing wall (FD, GD) height
DEPTH/DRAFT
OVER OVER OVER
SILL FLOOR KEEL
(GD)
BLOCKS
LIFTING CAPACITY
(ton 2,240)
DATE CERTIFIED, CERTIFIED BY WHOM, &
DATE CERTIFICATION EXPIRES
LEGEND (abbreviation of services)
Fresh Water --- F.W. - G.P.M. - P.S.I. Steam --- S - P/HR - P.S.I. Electric Power --- E - V - AC - AMP Fire Protection --- FP - G.P.M. - P.S.I.
Salt Water ----- S.W. - G.P.M. - P.S.I Air ------ A - C.F.M. - P.S.I. Electric Power --- E - V- DC - AMP Sanitary Sewer --SS - YES - NO
BERTHING, SHOP OR YARD CRANES; STATIONARY, RAIL, MOBILE, OR BRIDGE (3 tons or over)
NAVIGATIONAL RESTRICTIONS (indicate at M.L.W.)
MINIMUM CHANNEL (depth width) MINIMUM HORIZONTAL AND VERTICAL BRIDGE CLEARANCES
DISTANCE TO NEAREST DISTANCE TO NEAREST
AIRPORT RAILROAD CONNECTION (identify)
LIST ANY OTHER RESTRICTIONS (include projects under construction which will after navigational restrictions)
MAX REACH HEIGHT OF HOOK
NO TYPE CAPACITY MAX SPAN CAPACITY BOOM HEIGHT ABOVE BASE HEIGHT OF HOOK AREA SERVICE DATE CERTIFIED, CERTIFIED BY WHOM &
(STD TONS) (BRIDGE) AT REACH LENGT HINGE ABOUT REACH (BRIDGE) DATE CERTIFICATION EXPIRES
SHIPYARD:
MSC SHIP FACILITY SURVEY (continued)
PRINCIPAL SHOPS AND BUILDINGS
STORAGE SPACE FOR COMPONENTS AND MATERIALS
(LIST DIMENSIONS FOR EACH AREA, PLUS TYPE MATERIAL STORED)
NAME OF SHOP
OR BUILDING
FABRICATING
PLATE
SHEET METAL
SUBASSEMBLY
WOOD WORKING
BOAT ASSEMBLY
OR MOLDING
BOILER
MACHINE
ELECTRICAL
ELECTRONIC
PIPE
FOUNDRY
RIGGER
DIMENSIONS OF
SHOP OR BUILDING
LARGEST EXIT
WIDTH HEIGHT
ALL OTHER SHOPS
(LIST NAMES AND DIMENSIONS)
RAW STEEL STORAGE (SQ. FT.) ___________________________________________________________
WELDING AND ASSEMBLY (SQ. FT.) _______________________________________________________
LIST TYPES OF WORK NORMALLY SUBCONTRACTED
ACREAGE LEGALLY CONTROLLED
IN USE DEVELOPED TOTAL
EXISTING LOCAL ORDINANCES LIMITING PRODUCTIVE USE
LIMITATION IMPOSED BY PROPERTY ZONING CLASSIFICATION
SHIPYARD:
MSC SHIP REPAIR FACILITY SURVEY (continued)
EMPLOYMENT
MANAGEMENT, ADMINISTRATION
PROFESSIONAL ENGINEERING
PRODUCTION SKILLED
PRODUCTION UNSKILLED
NONPRODUCTION
TOTAL:
CURRENT
CURRENT
SHIFTS
POTENTIAL MAXIMUM
MAXIMUM
NORMAL
NORMAL
REQUIRED SUBMITTALS TO ACCOMPANY THIS FORM:
1. PLOT PLAN OF YARD.
2. CERTIFIED DEPTH OF WATER PLOT
3. FOR EACH SHOP LISTED ON SHEET 4, A LIST OF MACHINE TOOLS AND
EQUIPMENT WHICH INDICATES THE CAPACITIES OF THE SHOP.
4. A GENERAL STATEMENT (INCLUE, NAME OF SHIP, DATES, AND
DOLLAR AMONT OF JOB) OF SHIP REPAPIR WORK WHICH HAS BEEN
ACCOMPLISHED BY THE APPLICANT.
5. LISTING OF OFFICIALS AND THE QUALIFICATIONS OF EACH FOR SHIP
REPAIR (INCLUDE AS A MINIMUM JOBS HELD, YEARS, HELD, ONE
LINE
6. IF FACILITIES ARE LOCATED AT MORE THAN ONE LOCATION THEN
LIST EACH FACILITY AND ITS LOCATION.
7. POINT OF CONTACT FOR INFORMATION SUBMITTED IN THIS FORM
(NAME/TITLE/PHONE NUMBER).
ARE YOU CERTIFIED AS A SMALL BUSINESS? YES NO
NAME AND TITLE OF SENIOR SURVEYOR SIGNATURE DATE SIGNED
LIST ANY EQUIPMENT OR CAPABILITY NOT OTHERWISE DESCRIBED IN THIS FORM
PART D (to be completed by ALL Shipyards)
1. The Offeror shall provide a list of the vessels (and their principal characteristics) drydocked in this drydock over the past 2 years. (Attach a separate page)
2. The Offeror shall describe the nature and cause of accidents experienced by the shipyard in drydocking operations over the past 5 years. The Offeror shall describe corrective action taken or practices implemented to prevent recurrence of accident. (Attach a separate page)
I hereby certify that the above information is true and accurate.
Name and Title of Shipyard Official
Signature of Shipyard Official
Date
File details come from the government source that posted it.