N32205-17-R-4004
USNS HUMPHREYS (T-AO 188) RFC 17
ATTACHMENT J - 8
REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR:
SPECIFICATION ITEM NO.: ______________101_____________________
PARAGRAPH / SECTION NO: ______________1.1, 3.1.1, ____________________
TITLE: MAIN DECK AND 01 LEVEL DECK HYDROBLAST AND RECOAT
QUESTION:
Should Paragraph 3.1.1 state Main Deck AND 01 Level from frame 33 to frame 46?
Please clarify that the location to be worked is BOTH the MAIN DECK AND THE 01 LEVEL from frame 33 to 46.
ANSWER: On the TAO class ships the Main deck and 01 level are the same, the lower deck 1 is referred to as the tank deck.