N32205-17-R-3518_A0001.pdf
PDF 95 KB Posted
- Attached to
- Augusta Bay, Italy MSV 1. 0 Federal contract opportunity
- Solicitation number
- N32205-17-R-3518
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach_G_-_Boat_Dimensions.docx | DOCX document | |
| N32205-17-R-3518_A0002.pdf | ||
| 17-R-3518_QA__1-3.pdf | ||
| Attachment_F_MSC_BUNKER_FUEL_MANUAL.PDF | ||
| Attachment_E_-_EPIC.pdf | ||
| Attachment_D_-_DD254.pdf | ||
| N32205-17-R-3518.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
1. Per FAR 19.702(b)(3), Amendment 0001 is issued to remove the Subcontracting Plan requirement from 52.212-2 (c).
2. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Apr-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3220517R3518
X 9B. DATED (SEE ITEM 11)
06-Apr-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Apr-2017
CODE
MILITARY SEALIFT COMMAND NORFOLK
471 EAST C STREET BLDG T-26
NORFOLK VA 23511
N32205 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N3220517R3518
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
a) The Government will evaluate offers on a Lowest Price Technically Acceptable (LPTA) basis in accordance with FAR 15.101-2. The evaluation will be conducted in accordance with FAR 52.212-1 and 52.212-2 of the
RFP. The technical factor and past performance will be evaluated on an acceptable/unacceptable basis.
Technical tradeoffs will not be made and no additional credit will be given for exceeding the minimum requirements of the solicitation. Award(s) will be made to the responsible Offeror or combination of Offerors with the lowest evaluated price proposal and acceptable past performance whose offer conforms fully to the solicitation requirements and meets the acceptability standards for all non-price factors. In order to be considered for award, an offer must receive an acceptable rating in every non-price factor. An unacceptable rating in any non-price factor will render the entire offer unacceptable.
The Government intends to award without discussions. Pursuant to FAR 52.215-1(f) (4), however, the
Government reserves the right to conduct discussions.
In selecting the lowest price technically acceptable offer, the following factors will be considered:
Factor 1: Technical
Factor 2: Price
Factor 3: Past Performance
(b) Evaluation of Factors
1. Technical.
The Government will review the offeror’s proposed vessel and vessel characteristics in accordance with
FAR 52.212-1(ADDENDUM – ADDITIONAL INSTRUCTIONS TO OFFERORS – COMMERCIAL
ITEMS).
Any offer that fails to warrant compliance with each category (and, for “Deck Equipment,” each sub-category), shall be evaluated as Unacceptable. In addition, if any ship particulars the offeror fills in on the
Submission Package fails to meet the minimum requirements in the PWS, then the Offeror’s proposal shall be unacceptable.
2. Price
The total evaluated price will equal the sum of the total dollar amounts for the firm and option periods for daily hire, and any delivery and/or redelivery fees, if offered. The daily hire will equal the offered daily rate multiplied by the number of days in the applicable period. Reimbursable costs such as fuel and port charges will not be evaluated.
The option price to include the FAR 52.217-8 six month period will be included in the total evaluated price, and will be reviewed for price reasonableness.
Price analysis techniques will be used to determine price reasonableness. Adequate price competition is expected. Materially unbalanced offers will not be considered for award.
3. Past Performance
The past performance evaluation will assess the offeror’s probability of meeting the solicitation requirements. To develop an overall rating, the Government’s evaluation will take into account relevant information submitted by each offeror as part of its proposal and the Government’s assessment and evaluation of other sources of information. Other sources of information for past performance may include, but are not limited to, Past Performance Information Retrieval System (PPIRS) reports, the Federal
Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Report System
(ESRS), other databases, questionnaires and interviews.
(1) The Government will consider the recency and relevancy of past performance information compared to the requirements detailed in the PWS, the source of the information, the context of the data and general trends in the offeror’s performance and any associated risk.
(2) The Government will consider the extent of the offeror’s ability to perform a previous contract successfully in the areas of; (a) quality of product or services; (b) timeliness or scheduling of supplies/deliveries; (c) business relations/customer satisfaction; (d) key personnel and staffing (including subcontractors); and (e) cost controls (COST CONTRACTS ONLY).
(3) The Government will consider the company itself, predecessor companies, key personnel who have relevant experience and subcontractors who will perform major or critical aspects of the requirement.
(4) For all offerors, the Government will consider historical compliance with the requirements of FAR Part
52.219-8 (Utilization of Small Business Concerns). In addition, for large businesses, the Government will consider historical compliance with the requirements of FAR Part 52.219-9 (Small Business Subcontracting
Plan) and DFARS 252.219-7003 (Small Business Subcontracting Plan, DOD Requirements).
The Government reserves the right to consider Past Performance Questionnaires received after the due date for receipt of proposals. The Government reserves the right to contact references for verification or additional information and the right to consider other relevant past performance information. The
Government may call customers, whether or not provided by the offeror, to inquire about the offeror’s past performance. The Government does not assume the duty to search for data to cure the problems it finds with the information provided by the offeror. The burden of providing thorough and complete past performance information remains with the offeror.
In accordance with FAR 15.305(a) (2) (iv), an offeror without a record of relevant past performance or for whom information on past performance is not available, will not be evaluated favorably or unfavorably on past performance.
(c) Reserved.
(d) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(e) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .