Copy_of_J-3_CAT_B_Rev_4-5-16.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- USNS KANAWHA MID TERM AVIALABILITY (MTA)
- Solicitation number
- N32205-16-R-4004
About this file
Attachment J-3 Revised 4-5-16
View the file
Other files
Show 40 more
Latest 50 of 60 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cat B Items
| Contractor's price will be broken down for each item of the specification, as follows: | ||||||||||||||||
| CATEGORY “B” ITEMS | ||||||||||||||||
| GENERAL REQUIREMENT | Price / Tank | QTY | UI | Unit Price | Total | PRIME Contractor | SUBCONTRACTOR | OTHER COSTS | ||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Total Labor Hours | Total Material | TOTAL PRICE | ||||||
| CATEGORY "B" | ||||||||||||||||
| 025 | PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION BRAVO-DELTA | |||||||||||||||
| 7.11 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION BRAVO | 1 | DAY | $0.00 | $0 | |||||||||||
| 7.12 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 1 | DAY | $0.00 | $0 | |||||||||||
| 7.13 | COST TO ESTABLISH PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 1 | DAY | $0.00 | $0 | |||||||||||
| 7.11 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION BRAVO | 10 | DAY | $0.00 | $0 | |||||||||||
| 7.12 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION CHARLIE | 10 | DAY | $0.00 | $0 | |||||||||||
| 7.13 | COST TO MAINTAIN PHYSICAL SECURITY AT PRIVATE CONTRACTOR'S FACILITY IN FORCE PROTECTION CONDITION DELTA | 10 | DAY | $0.00 | $0 | |||||||||||
| WI 025 SUBTOTAL | $0.00 | $0 | ||||||||||||||
| 030 | CONTINUATION OF SERVICES | |||||||||||||||
| 7.1 | Overhaul Management Team | 15 | DAY | $0.00 | $0 | |||||||||||
| 7.2 | General Services For The Ship | 15 | DAY | $0.00 | $0 | |||||||||||
| 7.3 | Telephone Services | 15 | DAY | $0.00 | $0 | |||||||||||
| 7.4 | Project Planning and Monitoring | 15 | DAY | $0.00 | $0 | |||||||||||
| 7.5 | Fire Protection and Ship's Safety | 15 | DAY | $0.00 | $0 | |||||||||||
| 7.6 | Delivery, Care and Redelivery of the Vessel | 15 | DAY | $0.00 | $0 | |||||||||||
| 7.7 | Shipboard Access and Security | 15 | DAY | $0.00 | $0 | |||||||||||
| 7.8 | Gas Free Certificates | 15 | DAY | $0.00 | $0 | |||||||||||
| WI 030 SUBTOTAL | $0.00 | $0 | ||||||||||||||
| 104 | RAS & FAS KINGPOST SUPPORT BRACKETS | |||||||||||||||
| 3.2.1 | RAS Stations | 2 | EA | $0.00 | $0 | |||||||||||
| 3.2.2 | FAS Stations | 5 | EA | $0.00 | $0 | |||||||||||
| WI 104 SUBTOTAL | $0.00 | $0 | ||||||||||||||
| 509 | MISC. PIPING REPAIRS | |||||||||||||||
| 3.1.2.1 | Eight Inch Schedule 80 Steel Pipe | 60 | LF | $0.00 | $0 | |||||||||||
| 3.1.2.2 | Eight Inch Flanges Four Bolt 150# Flat Face, Socket Welded | 8 | EA | $0.00 | $0 | |||||||||||
| 3.1.2.3 | Eight Inch 90 Degree Elbos | 4 | EA | $0.00 | $0 | |||||||||||
| 3.1.2.4 | Six Inch Schedule 80 Steel Pipe | 80 | LF | $0.00 | $0 | |||||||||||
| 3.1.2.5 | Six Inch Flanges Four Bolt 150# Flat Face, Socket Welded | 8 | EA | $0.00 | $0 | |||||||||||
| 3.1.2.6 | Six Inch 90 Degree Elbos | 4 | EA | $0.00 | $0 | |||||||||||
| 3.1.2.7 | Five Inch Schedule 80 Steel Pipe | 80 | LF | $0.00 | $0 | |||||||||||
| 3.1.2.8 | Five Inch Flanges Four Bolt 150# Flat Face, Socket Welded | 8 | EA | $0.00 | $0 | |||||||||||
| 3.1.2.9 | Five Inch 90 Degree Elbos | 4 | EA | $0.00 | $0 | |||||||||||
| 3.1.2.10 | Three Inch Schedule 40 Steel Pipe | 80 | LF | $0.00 | $0 | |||||||||||
| 3.1.2.11 | Three Inch Flanges Four Bolt 150# Flat Face, Socket Welded | 8 | EA | $0.00 | $0 | |||||||||||
| 3.1.2.12 | Three Inch 90 Degree Elbos | 4 | EA | $0.00 | $0 | |||||||||||
| 3.1.2.13 | Two and a Half Inch Schedule 40 Steel Pipe | 80 | LF | $0.00 | $0 | |||||||||||
| 3.1.2.14 | Two and a Half Inch Flanges Four Bolt 150# Flat Face, Socket Welded | 8 | EA | $0.00 | $0 | |||||||||||
| 3.1.2.15 | Two and a Half Inch 90 Degree Elbos | 4 | LF | $0.00 | $0 | |||||||||||
| WI 509 SUBTOTAL | $0.00 |
TOTALS Total CAT "B" $0.00
| &14USNS KANAWHA (T-AO 196) | &14CONTRACTOR PRICE BREAKDOWN |
| &"Arial,Bold"CATEGORY "B" ITEMS | &14N32205-16-R-4001 |
ATTACHMENT J-3
File details come from the government source that posted it. Updated .