Q_AND_A__1.docx

DOCX document 28 KB Posted

Attached to
USNS CESAR CHAVEZ ROH/DD Federal contract opportunity
Solicitation number
N32205-15-R-3004
Issued by
Department of the Navy Military Sealift Command

About this file

Q A 1

View the file

Other files for this federal contract opportunity

Other files attached to USNS CESAR CHAVEZ ROH/DD, newest first.
File Type Posted
N32205-15-R-3004_Amendment_0004.doc DOC document
N32205-15-R-3004_Amendment_0003.doc DOC document
J-A_-_ROH-DD_USNS_CESAR_CHAVEZ_(T-AKE_14)_FBO.doc DOC document
Q_AND_A__5.docx DOCX document
WORK_ITEM_905_Reference_520-8391617A_RO_Sys_FM_Feed.pdf PDF
WI_905_RO_Sys_FM_Feed.pdf PDF
Q_AND_A__4.docx DOCX document
Q_AND_A__3.docx DOCX document
Q_AND_A__2.docx DOCX document
N32205-15-R-3004_Amendment_0002.doc DOC document
N32205-15-R-3004_Amendment_0001.doc DOC document
J-4.pdf PDF
J_-_10_Interport_Differential.doc DOC document
J-6.zip ZIP file
J_-_11_Dry_Dock_Evaluation_Form.docx DOCX document
J_-_9_Disclosure_of_Lobbying_Activities_SF-LLL.doc DOC document
J_-_12_Past_Performance_Data.doc DOC document
J_-_14_Technical_Data_Non-Disclosure.docx DOCX document
T-AKE_14_ROH-DD_WI_Index.doc DOC document
J_-_2_Category_A_Items.xls XLS spreadsheet
J_-_3_Category_B_Items.xls XLS spreadsheet
J_-_13__PAST_PERFORMANCE_QUESTIONNAIRE.docx DOCX document
J_-_8_Request_for_Spec_Clarification.doc DOC document
N32205-15-R-3004.doc DOC document
SYNOPSIS_CESAR_CHAVEZ_ROHDD.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N32205-15-R-3004

QUESTIONS AND ANSWERS #1

The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.

1. It was noted there are several discrepancies between the Work item specification and the Attachment J-4 for Government furnished materials. Here is a list of noted work items with discrepancies: 303, 507, 511, 514, 602, 902, 904, 908, 909 & 1001.

Should contractor assume the written specification take precedence?

ANSWER: The Work Item shall take precedence, where discrepancies exist between the Work Item and the J-4 Attachment.

Additionally, Work Item 512 does not list any GFM within the Work Item. This shall be revised to include the CuNi Piping for replacement as GFM. A revised Work Item shall be submitted via amendment.

2. Work item 305 paragraph 4.0 states there is no GFM material and paragraph 5.4 states that GFM is provided in references 2.8, 2.9 and 2.10. Those references are only manufactures spec sheets and installation instructions. There is no GFM provided in those references. Please provide GFM required for work item 305 or guidance on how to proceed.

ANSWER: Paragraph 5.4 is incorrect and shall be deleted. All Material for the Work Item 305 shall be Contractor Furnished.