Amendment No.: 2 to Solicitation N0RC91014-56
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment1.pdf | ||
| Statement_of_Work.pdf | ||
| toc.pdf | ||
| PACKING_AND_DELIVERY_OF_PROPOSALS.pdf | ||
| List_of_Government_Furnished_Property.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Number : N02RC91014-56 Amendment 2
- 1 -
OFFICE OF ACQUISITIONS
NATIONAL CANCER INSTITUTE
REQUEST FOR PROPOSAL NUMBER: N02RC91014-56
Amendment No.: 2
Date of Issuance: June 9, 2009
The above numbered Request For Proposal (RFP) is amended as set forth below. The hour and date specified for receipt of Offerors is changed to: 3:30 p.m. ET on June 12, 2009.
Offerors MUST acknowledge receipt of the amendment prior to the hour and the date specified in the solicitation or as amended, by separate letter, telegram, or Electronic Mail which includes a reference to the RFP and Amendment number(s). For your convenience, the Proposal Intent Response Form is provided in SECTION J - List of Attachments of this RFP, for this purpose.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERORS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
This Amendment revises the RFP as stated below:
The proposal receipt date is changed to: June 12, 2009.
Questions and answers associated with this RFP
1. Is repository work associated with this contract other than from samples generated in the SOW?
Answer: No, however the stored samples include samples from prior contracts.
2. How many samples will be transferred from the current contractor and how much cubic feet will be needed for these samples at the time of transfer?
Answer: This question is answered together with question 4.
3. How many samples will be generated per year?
Answer: The number of samples generated per year varies due to the types of studies. For the purposes of the contract, the uniform assumptions stated below should be followed.
4. Are the storage requirements listed above needed equally throughout the entire contract?
Answer to questions 2 and 4: The precise inventory of samples is not available. For the purposes of estimating costs and providing facilities, all offerors should propose based on the uniform assumptions stated below.
UNIFORM ASSUMPTIONS FOR TOTAL FREEZER SPACE REQUIRED.
The amount of material to be transferred and the amount of material to be stored through the life of the contract are sufficient to require the following:
Two (2) Liquid nitrogen freezers (equates to approximately 50 total cubic feet of storage), Four (4) -80 degree Celsius chest freezers (equates to approximately 80 total cubic feet), and Two (2) -20 degree celeries chest freezers (equates to approximately 50 total cubic feet)