N00421-10-R-0031_Attach P5_CLIN Breakout Spreadsheet.xls

XLS spreadsheet 2 MB Posted

Attached to
Air Vehicle Technical Support Services
Solicitation number
N00421-10-R-0031
Issued by

About this file

CLIN Breakout Spreadsheet

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions
(Please note that the cells referenced below correspond to the Cost Type sheet. The Fixed Price sheet is numbered slightly differently due to the absence of the Capacity Increase CLIN. For example, cell I417 on the Cost Type sheet is cell I409 on the Fixed Price sheet.)
Government:
AOn Footer Tab for the worksheet, insert the RFP number after the colon.
BInsert the Contract Line Item Numbers (CLINs) at Cells I2, K2, M2, O2, Q2, S2, U2, W2, Y2 and AA2 for the services and at I415, K415, M415, O415, Q415, S415, U415, W415, Y415 and AA415 for ODCs.
CInsert the CLIN description at Cells I4, K4, M4, O4, Q4, S4, U4, W4, Y4 and AA4. It can be color of money such as APN, OM&N, RDT&E, etc; or it may be specific tasks areas or locations, depending on how the Performance Based Statement of Work is written. (Once these cells are filled in, they will automatically populate cells I417, K417, M417, O417, Q417, S417, U417, W417, Y417 and AA417 with the same information.
DIn column A starting at row 5, insert the Government Labor Categories from the Historical Information being provided in the solicitation. List each category only once regardless of the number of estimated support hours. Once A5 through A40 are filled in, they will automatically populate the corresponding cells for the subcontractors 1 through 8.
EIf the Increased Services/ODCs CLIN is not being utilized in the solicitation, change the "10%" in cells G407, G408 and G427 to "zero" and hide the rows 406-410, 426 and 427. If utilized, Increased Services/ODCs is to be used for all applicable Cost Type CLINs for each period. Section L of the RFP states which Cost Type CLINs have applicable Increased Services/ODCs. For Rows 407, 408, and 427 columns I, K, M, O, Q, S, U, W, Y and AA, enter "0" for each Cost Type CLIN for which the Increased Services/ODCs CLIN is not applicable.
Contractor:
1On Header Tab for each worksheet, insert the proposal number. The file name should be automatically populated.
2On Footer Tab for the worksheet, insert the firm's name after colon. Insert the RFP number after the colon, if it has not been filled-in.
3A worksheet should be prepared for each period of performance. The tab should be renamed to match the period of performance. A SUMMARY SHEET OF ALL PERIODS NEEDS TO BE COMPLETED AS A SEPARATE TAB.
4Every worksheet should have items 1 through 3 completed.
5The worksheets of the workbook should all be formatted for printing on letter-size paper, without requiring "adjustments." It may be formatted for either landscape or portrait. DO NOT FORMAT FOR LEGAL SIZE PAPER.
6Within the work sheet any cell colored "blue" contains a formula and should not be edited.
7The worksheet is arranged that the workforce being proposed for an entire period of performance is shown together, even though it will separated by individual CLINS in Section B. When the numbers are carried to Section B, they will be the same as shown on the worksheet.
8In Cell B2, enter the period of performance calendar dates. (ex: 1 Jan 09 - 31 Dec 09)
9In column A, starting at row 5 to 40, the Government Labor Categories from the Historical Information should have been inserted. In column B, the Offeror can insert the title of the labor category it will be utilizing. If it is comparable to one of the Government Labor Categories, then it should appear opposite that category. However, if it is not comparable, utilize the "not comparable" row. This applies to the Prime Contractor's section and those sections for its subcontractors. If necessary, insert additional rows--but ensure integrity of formulas. The Offeror is not required to utilize the Government's labor categories. However, in evaluation, the Offeror's proposal will be compared to the Government Estimate in terms of hours and labor categories. The Offeror does not insert any subcontractor information in this section. Also, labor categories with more than one person providing service shall be listed multiple times for each person performing work. For example, if the offeror proposes four Senior Analysts, then the labor category Senior Analyst shall be listed four times along with their applicable rates and information.
10In column C, the Offeror should insert a "K" if the worker will be performing at the Contractor's facility or a "G" if it will be performing in Government spaces.
11In column D, for the prime contractor's own workforce, the field is colored "green" indicating no input. (This reflects that the prime contractor is proposing its own employees or contingency hires--it does not include any subcontractors.) For the subcontractors, their fields are in yellow. No input is required by the Offeror in this column. Please note if more subcontractors are needed, the contractor may add additional rows to accommodate them, but ensure integrity of formulas.
12In column E, for both the prime contractor's own workforce and that of the individual subcontractors' workforces, identify for the specific labor category individual whether they are full-time on this acquisition or part-time. Enter "F" for full-time or "P" for part-time.
13In column F, enter the name of the proposed individual for that position.
14In column G
(a) for the prime contractor, enter the unburdened labor rate for each individual (e.g. rows 5-44)
(b) In Cell G46 the prime contractor should insert its fringe rate for full time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell G47 the prime contractor should insert its fringe rate for part-time, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank. If no part-time employees are proposed this should also be left blank.
(d) In Cell G50, the prime contractor should insert its overhead rate for work performed at the contractor's facility.
(e) In Cell G51, the prime contractor should insert its overhead rate for work performed at the Client/Government's facility.
(f) In Cell G53, the prime contractor should insert its G&A rate being applied.
(g) for the subcontractor enter the fully burden cost including fixed fee associated with individual labor category for CLIN XX00 (e.g., rows 59-98, 101-140, 143-182, 185-224, 227-266, 269-308, 311-350, and 353-392)
(h) In Cell G395, the prime should insert the subcontractor handling charge, if any.
(i) In Cell G398, the prime should insert the fixed fee rate applied to its cost excluding subcontractor labor.
(j) In Cell G399, the prime should insert the fixed fee rate it is applying to the subcontractor labor, if any.
(k) In Cell G422, the prime should insert the material handling rate it is applying it to the material, if any. If not applying a material handling, cell should be left blank.
(l) In Cell G423, the prime should insert the G&A rate it is applying to the ODCs, if any. If not applying a G&A rate, cell should be left blank.
15In column H, and then similarly for Columns J, L, N, P, R, T, V, X and Z.
(a) for the prime contractor and the subcontractor enter the hours associated with individual labor category for CLIN XX00 (e.g., rows 5-44, 59-98, 101-140, 143-182, 185-224, 227-266, 269-308, 311-350, and 353-392). Also make sure you plug in the hours for columns J, L, N and so on.
(b) In Cell H46, the prime contractor should insert the base its fringe rate for full time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(c) In Cell H47, the prime contractor should insert the base its fringe rate for part time is being applied to, if it is not included in its overhead rate. If the fringe is included in the overhead rate, this cell should be left blank.
(d) In Cell H50, the prime contractor should insert the base its overhead rate is being applied to for work performed at the contractor's facility.
(e) In Cell H51, the prime contractor should insert the base its overhead rate is being applied to for work performed at the Client/Government's facility.
(f) In Cell H53, the prime contractor should insert the base its G&A rate is being applied to.
(g) In Cell H398, the prime should insert the prime labor base its fixed fee rate is being applied to (excluding subcontractor labor).
(h) In Cell H399, the prime should insert the subcontractor labor base its fixed fee rate is being applied to, if any.
(i) Under Other Direct Costs, the prime contractor should insert the Travel, Material and NMCI by CLIN.
16Insert the CLIN number for the specific period of performance as identified in Section B of the Solicitation in cells I2, K2, M2, O2, Q2, S2, U2, W2, Y2 and AA2 when creating the additional sheets for the option periods.
17Column AB automatically calculated the total hours for all the CLINS.
18Column AD is a summation of the costs.
19If there is not going to be any data entry in a row or group of rows, please just hide the rows. Do not delete. For example, if the prime is only utilizing two subcontractors, then the rows concerning sub 3 through 8 (which are rows 142 through 393) would be hidden.
20When submitting this file, the instructions may be deleted.

&RAttachment P5

&RN00421-10-R-0031

Base Period Cost Type

DO NOT TYPE IN ANY COLORED AREAS
Period of Performance:CLIN0001CLINCLINCLINCLINCLINXX05CLINXX06CLINXX07CLINXX08CLINXX09
ServicesContractorhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalhrssubtotalHrs
Government Labor CategoryProposed Categorysitesubf/pEmployee NameRateLaborSUMTotal
Program Manager$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Lead Engineer$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Engineer$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Journeyman Engineer$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Programmer/Analyst$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Subject Matter Expert$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Junior Engineer$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Entry Level Engineer$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Programmer/Analyst$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Simulation Technician$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Simulation Technician$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Computer Prog$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Software Support$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Project Manag$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
subtotal0$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
fringe fulltime0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
fringe part time0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
OverheadBaseBaseBaseBaseBaseBaseBaseBaseBaseBase
Contractor site0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Client site0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
G&A0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
COM0.00%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor$ - 0
Subcontractors
Sub: 1:
Program Manager1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Lead Engineer1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Engineer1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Journeyman Engineer1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Programmer/Analyst1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Subject Matter Expert1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Junior Engineer1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Entry Level Engineer1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Programmer/Analyst1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Simulation Technician1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Simulation Technician1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Computer Prog1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Software Support1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Project Manag1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable1$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 1- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 2:
Program Manager2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Lead Engineer2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Engineer2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Journeyman Engineer2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Programmer/Analyst2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Subject Matter Expert2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Junior Engineer2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Entry Level Engineer2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Programmer/Analyst2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Simulation Technician2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Simulation Technician2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Computer Prog2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Software Support2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Project Manag2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable2$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 2- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 3
Program Manager3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Lead Engineer3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Engineer3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Journeyman Engineer3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Programmer/Analyst3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Subject Matter Expert3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Junior Engineer3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Entry Level Engineer3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Programmer/Analyst3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Simulation Technician3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Simulation Technician3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Computer Prog3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Software Support3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Project Manag3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable3$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 3- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 4:
Program Manager4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Lead Engineer4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Engineer4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Journeyman Engineer4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Programmer/Analyst4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Subject Matter Expert4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Junior Engineer4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Entry Level Engineer4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Programmer/Analyst4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Simulation Technician4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Simulation Technician4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Computer Prog4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Software Support4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Project Manag4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable4$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 4- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 5:
Program Manager5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Lead Engineer5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Engineer5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Journeyman Engineer5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Programmer/Analyst5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Subject Matter Expert5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Junior Engineer5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Entry Level Engineer5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Programmer/Analyst5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Simulation Technician5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Simulation Technician5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Computer Prog5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Software Support5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Project Manag5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable5$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 5- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 6:
Program Manager6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Lead Engineer6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Engineer6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Journeyman Engineer6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Programmer/Analyst6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Subject Matter Expert6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Junior Engineer6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Entry Level Engineer6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Programmer/Analyst6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Simulation Technician6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Simulation Technician6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Computer Prog6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Software Support6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Project Manag6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable6$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 6- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 7
Program Manager7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Lead Engineer7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Engineer7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Journeyman Engineer7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Programmer/Analyst7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Subject Matter Expert7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Junior Engineer7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Entry Level Engineer7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Programmer/Analyst7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Simulation Technician7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Simulation Technician7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Computer Prog7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Software Support7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Assistant, Project Manag7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Administrative7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
X7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
not comparable7$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
sub total on Sub 7- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0- 0$ - 0
Sub: 8:
Program Manager8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Lead Engineer8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Engineer8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Journeyman Engineer8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Engineer8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Senior Programmer/Analyst8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Subject Matter Expert8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Technical Writer8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Junior Engineer8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0
Entry Level Engineer8$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 00$ - 0- 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .