- INTENT TO SOLE SOURCE, OEM IMECO INC (TRIDENT MARITIME SYSTEMS) SERVICES FOR HVAC SYSTEM REPAIRS
- Solicitation number
- N0040624Q0773
About this file
This document is a solicitation amendment for contract N0040624Q0773 issued by NAVSUP Fleet Logistics Center Puget Sound on behalf of Military Sealift Command. The amendment updates the Statement of Work to require the original equipment manufacturer (OEM) technical representative to make repairs to the shipboard air conditioning and cargo refrigeration plants, including replacing parts, performing overhauls, and testing the systems. The amendment extends the due date for offers to August 13, 2024 and adds several FAR and DFARS clauses related to government property. Key details include the location of the work (Gwangyang, South Korea), the equipment to be repaired (3 air conditioning plants, 1 cargo refrigeration plant, and 1 R404A pump out unit), and the government-furnished materials to be provided. The contract is a firm fixed-price service type with no additional quality assurance requirements specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Figure 1.pdf | ||
| GFP Spreadsheet.pdf | ||
| 4.0 24Q0773-0001 SOLE2.pdf | ||
| 4.0 24Q0773-0001 SOLE1.pdf | ||
| 4.0 24Q0773 SOL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1301180739
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to update the Statement of Work, add Enclosure 1, add Enclosure 2, extend the due date, add FAR 52.245-1, add FAR 52.245-9, add DFARS 252.245-7003, and add DFARS 252.245-7005. For further changes are made. The POC for this action is Roger Bow ers (roger.s.bow ers.civ@us.navy.mil)
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0040624Q0773
X 9B. DATED (SEE ITEM 11)
31-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2024
CODE
NAVSUP FLC PUGET SOUND
467 W STREET, 2ND FLR
ATTN: ROGER BOWERS
BREMERTON WA 98314
N00406 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0040624Q0773
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
SOW
1.0 ABSTRACT:
1.1 This item describes the requirement for original
equipment manufacturer (OEM) technical representative to make repairs to the shipboard air conditioning and cargo refrigeration plants and R404A pump out unit.
2.0 REFERENCES/ENCLOSURES:
2.1 T9516-BB-MMC-010; Technical Manual for Refrigeration
Plant, Air Conditioning for USNS Lewis and Clark Class
(T-AKE 1)
2.2 T9516-MMC-010; Refrigeration Plant, Cargo
2.3 T9516-BG-MMC-010; Pump Out Unit
2.4 MSC Standard Drawing 803-7081122, Military Sealift
Command General Technical Requirements (GTRs)
2.5 MSFSC SMS Procedure 2.1-004-All, Tagout/Lockout
3.0 ITEM LOCATION/QUANTITY/ITEM DESCRIPTION/MANUFACTURER’S
DATA:
3.1 Location: AMR 5-58-01
3.2 Quantity:
3.2.1 Three (3ea) Air Condition Refrigeration Plants, York Marine AB VSM89, Capacity-210 KW Nominal
3.2.2 One (1ea) Cargo Refrigeration Plant
Compressors, Frick Model XJF151L1492L, Refrigerant R404A
3.2.3 One (1ea) R404a Pump Out Unit Model
19XB04280215.
3.3 Bill of Materials: (Contractor Supplied):
Description Part Number Qty
No. 5 A/C Motor Bearings Part No. 6317M/C3
IM13000666
2ea
No. 1 Cargo Reefer Plant Mount
Part No. V45HW 1ea
A/C Compressor Discharge Thermometer
Part No. 1543.083 1ea
A/C Condenser Liquid Level Indicator Complete
Part No. 3951 6054 040 1ea
OP3 Station Computer Assy. SE2200 Control System 1ea Filter Element Part No. 1517.061 6ea
3.3.1 Contractor will provide all the necessary labor and additional material not provided as GFM to make repairs to the shipboard air conditioning plants and the cargo refrigeration plants.
4.0 GOVERNMENT FURNISHED EQUIPMENT/ MATERIALS/ SERVICES:
4.1 R404a Pump-Out Unit Condenser, P/N 19EA41531; QTY 1ea.
4.2 A/C Compressor Shaft Seal Kit, P/N 3084.722; QTY 1ea.
4.3 Cargo Refrig Compressor Shaft Seal Kit, P/N
534B0732H01; QTY 1ea
4.4 R404a and R134a Refrigerants
4.5 SOLEST 180 Oil
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless of
tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.
5.2 The contractor and all subcontractors, regardless of
tier, must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTRs.
5.3 THIS SHIP CONTAINS HIGH VOLTAGE (HV) ELECTRICAL
SYSTEMS. OBEY ALL POSTED AND VERBAL INSTRUCTIONS
REGARDING SAFETY AND EXCLUSION FROM HIGH VOLTAGE AREAS.
AT NO TIME APPROACH, WORK ON, OR ENTER A HIGH VOLTAGE
AREA WITHOUT PROPER AUTHORIZATION.
5.4 Performance Period: SEE SCHEDULE
5.5 Performance Location: Gwangyang, South Korea
5.6 Port Engineer Contact information:
REDACTED
5.7 THE T-AKE CLASS ELECTRICAL COLOR CODING DOES NOT FOLLOW
CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE
CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK,
AND WHITE. ASSUME ALL ELECTRICAL CABLES ARE ENERGIZED
Filter Element Part No. 1517.169 6ea MISC Pipe & Tube Fittings for R404a Pump-out Unit
As Required As RQD
UNTIL TESTED AND PROVEN OTHERWISE. TEST ALL ELECTICAL
CABLES TO ENSURE THEY ARE DE-ENERGIZED PRIOR TO WORKING
ON THE ITEM.
5.8 To gain access to the ship, all contractors that will
be performing work on the ship must submit their name and security information as follows:
5.8.1 Email Ship Access Requests on company
letterhead to the Port Engineer with the following information:
5.8.1.1 US Citizen Contractors: Full Name; Last
4 SSN; Passport and expiration date; Ship Attending; Reason for Visit; Dates requiring access.
5.8.1.2 Non-US Citizen Contractors: Full Name;
Date of Birth; Nationality; SSN/Passport No./ARC No.; Ship Attending; Reason for Visit; Dates requiring access.
5.9 Any-and-all hazardous waste material must be disposed
of following all local regulations.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Provide the services of the original equipment
manufacturer (OEM) technical representative to make repairs to the shipboard air conditioning plants and the cargo refrigeration plants.
7.2 With the assistance of ship’s Force, tag-out the
affected shipboard air conditioning plants and the cargo refrigeration plants.
7.2.1 Drain and dispose of any liquid in
accordance with all federal, state, and local regulations.
7.3 OEM Technical Representative is required to make the
following repairs:
7.3.1 No. 1 A/C Condenser Liquid Level Indicator
Repair/Replace and verify proper operation.
7.3.2 No. 2 A/C Compressor Shaft Seal Repairs.
7.3.3 No. 5 A/C Motor Bearings Replace; op-test for
minimum 48 hours at >75% load.
7.3.4 No. 2 Cargo Reefer. Compressor. Perform OEM
Certified Factory Overhaul and Return Ship to MSC BATS, San Diego, CA.
7.3.5 R404a Purge Pump-out Unit Condenser
Replacement; remove existing temp-repaired unit, install new; re-use or renew refrigerant and cooling water piping/fittings, as required.
7.3.6 Provide Replacement OP-3 Computer Assy, including programming; install and verify system operation.
7.3.7 Replace and adjust missing vibration mount for
NR1 Cargo Refrigeration Plant foundation; refer to Figure 1.
7.3.8 Perform refrigerant leak testing of all Air
Conditioning (5EA), Cargo Refrigeration (3EA), and Domestic Refrigeration (2EA) plants in the presence of ship’s crew; provide condition report of any leaks.
7.4 Perform pre-operational inspections and operational
testing on the affected units and test all operational parameters and safety set points.
7.5 Perform Operational test of the start-up and shutdown
cycles.
7.5.1 Verify all preset values prior to system
operational test and record.
7.5.2 Record all operational parameters, safety alarm
and shutdown values found during tests. Include all temperatures, pressures and fluid levels.
7.6 Preparation of Drawings:
7.6.1 Provide a final service report to the Port
Engineer with the repairs completed.
8.0 GENERAL REQUIREMENTS: None additional
Enclosures: Figure 1 (1), GFP Spreadsheet (2)
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 07-Aug-2024 01:00 PM to 13-Aug-2024 05:00 PM.
The following have been added by reference:
52.245-1 Government Property SEP 2021 52.245-9 Use And Charges APR 2012 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7005 Management and Reporting of Government Property JAN 2024
(End of Summary of Changes)