N0040618R0002
Section SF 30 - BLOCK 14 CONTINUATION PAGE
NOTICE TO OFFERORS
1. QUESTIONS: All questions regarding this solicitation shall be submitted in writing no later than 15 days prior to the RFP closing time, to the Contract Specialist, Brian Reed, via email: brian.c.reed@navy.mil.
1. EXCEPTIONS: Any exceptions or deviations to the Government Statement of Work must be clearly identified in a cover letter and submitted as part of your proposal. If deviations are proposed, the offeror may provide an explanation of how the proposal meets the functional requirement. Failure to notify the Government of all deviations or exceptions prior to award may be grounds for contract termination.
1. EVALUATIONS: Proposals will be evaluated in accordance with paragraph entitled “LOW PRICE TECHNICALLY ACCEPTABLE EVALUATION”.
1. INVOICING: Invoices are to be submitted electronically using Wide Area Work flow (WAWF)—Receipt and Acceptance. Invoices may be submitted not more than once per month. Back-up information shall be provided for end of year rate adjustment billings and shall include the type of adjustment, the period covered, and the total dollar amount, identified by contractor.
1. Standard Form 33, page 1 of solicitation. In block 12, insert number of calendar days offer is valid. Request offerors allow time for Government evaluation of proposals.
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Hitch Girder Raw Material - ACE #3
CPFF
Raw materials for the hitch girder end structural assemblies (4) shall be ordered by the contractor utilizing 5083 H-128 in accordance with the SOW.
Contractor shall identify method of transportation (e.g. surface or air) proposed.
FOB: Destination
PURCHASE REQUEST NUMBER: N6275818RCPS00X
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Raw Materials Parts Cutting - ACE #3
Contractor shall provide pricing for the parts cutting process.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Hitch Girders Prefabrication - ACE #3
Welding and fabrication shall be in accordance with NAVSEA 802-7094539 (CVN 78 Class Aircraft Carrier Project Peculiar Document Fabrication, Welding and Inspection of Hull Structure), with the additional inspection and welding requirements of enclosure (1) in accordance with the SOW.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Hitch Girder Raw Material - ACE #1 |
CPFF
Raw materials for the hitch girder end structural assemblies (4) shall be ordered by the contractor utilizing 5083 H-128 in accordance with the SOW.
Contractor shall identify method of transportation (e.g. surface or air) proposed.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Raw Materials Parts Cutting - ACE #1 |
CPFF
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Hitch Girders Prefabrication - ACE #1 |
CPFF
Welding and fabrication shall be in accordance with NAVSEA 802-7094539 (CVN 78 Class Aircraft Carrier Project Peculiar Document Fabrication, Welding and Inspection of Hull Structure), with the additional inspection and welding requirements of enclosure (1) in accordance with the SOW.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Hitch Girder Raw Material - ACE #4 |
CPFF
Raw materials for the hitch girder end structural assemblies (4) shall be ordered by the contractor utilizing 5083 H-128 in accordance with the SOW.
Contractor shall identify method of transportation (e.g. surface or air) proposed.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Raw Materials Parts Cutting - ACE #4 |
CPFF
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
| OPTION |
| Hitch Girders Prefabrication - ACE #4 |
CPFF
Welding and fabrication shall be in accordance with NAVSEA 802-7094539 (CVN 78 Class Aircraft Carrier Project Peculiar Document Fabrication, Welding and Inspection of Hull Structure), with the additional inspection and welding requirements of enclosure (1) in accordance with the SOW.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
CLAUSES INCORPORATED BY REFERENCE
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| JUL 2016 |
Section C - Descriptions and Specifications
STATEMENT OF WORK
CVN Aircraft Elevator Platform Repairs
Task Title: USS RONALD REAGAN (CVN 76) Aircraft Elevator #1, #3 and #4 Hitch Girder End Structural Assemblies Prefabrication.
Purpose: The majority of cracking found to date on Aircraft Carrier (CVN) aluminum Aircraft Elevator (ACE) platforms have been located in the hitch girder end structural assemblies. Replacing hitch girder end structural assemblies will permanently remove most of the highest risk cracks.
Objective: The objective of this task is for the contractor to prefabricate hitch girder end structural assemblies for ACE platform hitch girder ends, and to provide ship installation drawings and list of materials ordered for prefabrication of hitch girder end structural assemblies for ACE #3 during the Fiscal Year (FY) 2019 Selected Restricted Availability (SRA), ACE #1 during the FY 2020 SRA, and ACE #4 during the FY 2021 SRA.
Scope of Work:
Prefabrication of Hitch Girder End Structural Assemblies (Including Planning for Prefabrication):
A. Accomplish the prefabrication of ACE #3, #1 and #4 hitch girder end structural assemblies (twelve (12) assemblies) and delivery, prior to the installations during FY 2019, FY 2020 and FY 2021 SRAs, respectively.
1) Determine the amount of material and “in yard need dates” to support fabrication of the hitch girder end structural assemblies for installation on the following CVN 76 ACEs:
· ACE #3 during the FY 2019 SRA (01-Dec-2018 to 09-May-2019)
· ACE #1 during the FY 2020 SRA (01-Dec-2019 to 09-May-2020)
· ACE #4 during the FY 2021 SRA (01-Dec-2020 to 09-May-2021)
Prefabricated hitch girder end structural assemblies must be on station in Yokosuka, Japan no later than 01 December of their assigned SRA.
B. Accomplish material ordering of CVN 76’s ACE #3, #1 and #4 hitch girder end structural assemblies (twelve (12) assemblies) in preparation for prefabrication to support installations to occur during FY 2019, FY 2020 and FY 2021 SRAs, respectively. The contractor shall determine cost and amount of material and “in yard need dates” to support fabrication of hitch girder end structural assemblies.
C. Replacement hitch girder end structural assemblies shall be fabricated with aluminum alloy 5083 H-128 material. The contractor shall determine if 5083 H-128 material per ASTM B928 (14) is available in required thicknesses and quantities.
D. If a third party vendor is used to cut material to suit fabrication needs, the contractor shall obtain scrap or remnant material from the vendor. Scrap or remnant material shall include all material cut from the plates used to form the upper and lower flanges. The contractor shall identify from which assembly the scrap or remnant was cut and make the scrap or remnant material available to the Government for retention and future destructive material testing if the Government deems necessary. The contractor is requested, if Government deems necessary, to deliver the scrap or remnant material to the Government for retention and future destructive material testing.
E. Contractor shall provide an excess materials report illustrating the amount of material left over from all previous material and prefabrication contract actions for hitch girder end assemblies in support of CVN 76. The excess materials shall be utilized for the prefabrication of each hitch girder end assembly referenced in this Statement of Work. The reports shall be provided as follows:
Report #1: Due 60 days after receipt of initial award. Report shall include all remaining material from the prefabrication of the hitch girder end assemblies in support of ACE #2.
Report #2: Due 30 days after receipt of modification exercising option quantity for ACE #1. Report shall include all remaining material from the prefabrication of the hitch girder end assemblies in support of ACE #2 and #3.
Report #3: Due 30 days after receipt of modification exercising option quantity for ACE #4. Report shall include all remaining material from the prefabrication of the hitch girder end assemblies in support of ACE #2, #3, and #1.
F. The contractor shall ensure the material is defect free and perform ASTM G67 testing on all material that has not been tested within one year to ensure that it is not already sensitized. For any exposed edges of Al 5083-H128 hitch girder webs and face plate material used in the fabrication of the hitch girder end structural assemblies that do not pass the accelerated G67 Nitric Acid Mass Loss (NAML) test invoked in section 10 of ASTM-B928 14, the contractor shall submit failure documentation to the Supervising Activity with recommendations for repair. Repairs will be considered growth work, but repair method will require NAVSEA 05V concurrence prior to execution. Include Eddy Current Testing (ET) and Ultrasonic Testing (UT) of material as detailed in Enclosure (1) before start of prefabrication welding.
G. Contractor will store aluminum material in such a way to prevent exposure to worst case scenarios (e.g. tropical temperatures and sea air/spray). Proper storage will mitigate sensitization, which is temperature driven, and crevice and galvanic corrosion, which are moisture driven.
H. Indoor storage is preferred to reduce corrosion risk, however if shipyard logistics dictate the necessity for outdoor storage, excess 5083 H128 material shall be fitted with a cover to prevent exposure to inclement weather, water/sea spray, and contact with dissimilar metallic objects. The cover shall be light colored with an air gap between the cover and aluminum to minimize moisture or heat build-up.
I. Store excess aluminum (i.e. excess material remaining after the hitch girders have been prefabricated) until the end of the period of performance.
J. Testing in accordance with ASTM G67 must be repeated if aluminum material certifications are over one year old.
K. Develop ship installation drawings and list of materials ordered for each set of Hitch Girder End assemblies. Delivery of the drawings to the Government should be March prior to the FY of installation:
· ACE #3 drawings required by March 2018 for a FY 19 installation
· ACE #1 drawings required by March of 2019 for a FY20 installation
· ACE #4 drawings required by March of 2020 for a FY21 installation.
L. Welding and fabrication shall be in accordance with NAVSEA 802-7094539 (CVN 78 Class Aircraft Carrier Project Peculiar Document Fabrication, Welding and Inspection of Hull Structure), with the additional inspection and welding requirements of enclosure (1).
M. Bi-weekly progress reports shall be submitted on the 1st and 15th of each month to the COR providing updated status of work in progress.
CLAUSES INCORPORATED BY FULL TEXT
MATERIAL CERTIFICATION
1. Material certification shall be provided for the material specified. Notwithstanding the requirements for any Government inspection and test contained in specifications applicable to this contract, except where specialized inspections or tests are specified for performance solely by the Government, the Contractor shall perform or have performed the inspections and tests required to substantiate that the supplies and services provided under the contract conform to the drawings, specifications and contract requirements listed herein, including, if applicable, the technical requirements for the manufacturer's part numbers specified in the contract. The acceptance range shall be stated and actual test data shall be present which substantiates that the materials provided are within the stated acceptance range. Each test report must be identified to the material via the unique serial number. Material certification shall include certified reports of numerical results of required objective quality evidence. Such reports shall be in the form of reports issued by the organization performing the tests or exact copies thereof; data transcribed to another organization's forms are not acceptable.
2. If, during the Contractor's or Government's own tests or inspections, items furnished under the contract fail to meet all contract requirements, the Contractor is financially responsible in accordance with the inspection provisions of the contract for correcting these conditions, regardless of the extent of testing or inspection required of the Contractor by the contract.
STANDARD WARRANTY
The Contractor shall extend to the Government the full coverage of any standard warranty normally offered in a similar sale, provided such warranty is available at no additional cost to the Government. Acceptance of the standard warranty does not waive the Government's rights under any "Inspection" clause that may be in the contract nor does it limit the Government's rights with regard to the other terms and conditions of this contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard warranty. The standard warranty period shall begin upon final acceptance of the applicable material and/or services listed in the Schedule.
The Contractor shall provide a copy of its standard warranty (if applicable) with its offer. The warranty covers a period of ____________ months (offeror is to insert number).
Section D - Packaging and Marking
MARKING OF WARRANTED ITEMS
(a) Each item covered by a warranty shall be stamped or marked with the following information:
| (1) | National stock number or manufacturer's part number. |
| (2) | Serial number or other item identifier (if the warranty applies to uniquely identified items). |
| (3) | Contract number. |
| (4) | Indication that a warranty applies. |
| (5) | Manufacturer or entity (if other than the contractor) providing the warranty. |
| (6) | Date or time when the warranty expires. |
| (7) | Indication of whether or not attempted on-site repair by Government personnel will void the |
warranty.
(b) Where this is impracticable, written notice shall be attached to or furnished with the warranted item.
PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED ITEMS)
(a) Preservation, packaging, and packing shall be in accordance with ASTM-D-3951 (most current edition), "Standard for Commercial Packing." The unit pack quantity that applies to items under this contract is "Industry Standard".
(b) Prohibited Packing Materials. The use of asbestos, excelsior, loose fill polystyrene, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited.
(c) Non-Manufactured Wood Packing. All non-manufactured wood utilized in wood pallets and wood containers shall be heat treated to a minimum core temperature of 56 degrees centigrade for 30 minutes and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC). Refer to www.aphis.usda.gov/ppq/swp/eunmwp.html for wood packing policy, enforcement regulations and accredited agencies. Non-coniferous (hardwood) and manufactured wood, such as particleboard and plywood, are exempt from this requirement.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 0002 |
| Destination |
| Government |
| Destination |
| Government |
| 0003 |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 1002 |
| Destination |
| Government |
| Destination |
| Government |
| 1003 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
| 2002 |
| Destination |
| Government |
| Destination |
| Government |
| 2003 |
| Destination |
| Government |
| Destination |
| Government |
| 52.246-3 |
| Inspection Of Supplies Cost-Reimbursement |
| MAY 2001 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
INSPECTION AND ACCEPTANCE (DESTINATION)
Inspection and acceptance of the supplies or services to be furnished hereunder shall be made at destination by the receiving activity, in Yokosuka, Japan.
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 0002 |
| N/A |
| N/A |
| N/A |
| N/A |
| 0003 |
| N/A |
| N/A |
| N/A |
| N/A |
| 1001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 1002 |
| N/A |
| N/A |
| N/A |
| N/A |
| 1003 |
| N/A |
| N/A |
| N/A |
| N/A |
| 2001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 2002 |
| N/A |
| N/A |
| N/A |
| N/A |
| 2003 |
| N/A |
| N/A |
| N/A |
| N/A |
| 52.242-15 Alt I |
| Stop-Work Order (Aug 1989) - Alternate I |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
PROOF OF DELIVERY
If United Parcel Service (UPS) or Federal Express services are used for transportation, each package must have a unique package identification number. The Government will not consider the manifest as proof of delivery unless each package can be uniquely identified. Acceptance will occur only after the Government can verify actual receipt of the contract items--packaged, marked and labeled as required elsewhere in this contract.
PLACE OF DELIVERY - DESTINATION
(a) The articles to be furnished hereunder shall be delivered all transportation charges paid by the contractor to: SRF-JRMC Yokosuka, Japan
(b) Bids submitted on a basis other than F.O.B. destination may be rejected as nonresponsive and offers may be deemed unacceptable.
Section G - Contract Administration Data
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
INVOICE
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
DESTINATION
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF
| Pay Official DoDAAC | HQ0721 | ||
| Issue By DoDAAC | N00406 | ||
| Admin DoDAAC | N00406 | ||
| Inspect By DoDAAC | N62758 | ||
| Ship To Code | N62758 | ||
| Ship From Code | N/A | ||
| Mark For Code | N/A | ||
| Service Approver (DoDAAC) | N/A | ||
| Service Acceptor (DoDAAC) | N/A | ||
| Accept at Other DoDAAC | N/A | ||
| LPO DoDAAC | N62758 | ||
| DCAA Auditor DoDAAC | N/A | ||
| Other DoDAAC(s) | N/A |
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
SRF-JRMCWAWF@SRF.navy.mil
"Receipts / service completion reports should be attached into WAWF for service contracts."
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Kimberly.sparks@srf.navy.mil & Kumiko Charron, Kumiko.charron.JA@SRF.NAVY.MIL (Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
CONTRACTOR POINT OF CONTACT
(a) In the event your firm receives a contract as a result of this solicitation, designate a person whom the Government may contact during the period of the contract for prompt contract administration.
NAME: _______________________________________________
TITLE:________________________________________________
ADDRESS: ____________________________________________
PHONE:_______________________________________________
TOLL-FREE PHONE NO: (800)____________________________
FULL INTERNET E-MAIL ADDRESS: _____________________
FAX NO:______________________________________________
(b) This contract may be subject to Contract Performance Assessment Reporting System (CPARS). Designate an individual who has the authority to review and provide comments on Government appraisals of your firm's performance under this contract.
NAME: _______________________________________________
TITLE:________________________________________________
PHONE:_______________________________________________
TOLL-FREE PHONE NO: (800)____________________________
FULL INTERNET E-MAIL ADDRESS: _____________________
NOTICE TO CONTRACTOR -"REMIT TO" ADDRESS
The offeror shall indicate in the space provided below the address to which payment should be mailed, if such address is different from that shown for the offeror. The address may be different but the contractor's name must be the same as page 1 on the resultant contract/order, or there must be a proper Notice of Assignment. This invoice information is critical to prevent delays in payment.
| ___________________________________________________ |
| ___________________________________________________ |
| ___________________________________________________ |
CONTRACT ADMINISTRATION PLAN
In order to expedite administration of this contract/order, the following delineation of duties is provided. The names, addresses, e-mail addresses and phone numbers for each individual or office is specified below or will be provided upon award. The individual/ position designated as having responsibility should be contacted for any questions, clarifications or information regarding the functions assigned.
1. PROCURING CONTRACTING OFFICER (PCO) is responsible for:
| a. All pre-award information, questions, or data; |
| b. Freedom of Information inquiries; |
| c. Change/question/information regarding the scope, terms or conditions of the basic contract document; |
and/or
d. Arranging the post-award conference (see FAR 42.503).
| Name: | Austin Carter |
| Address: | FLC Puget Sound, Bremerton, WA |
| E-mail: | austin.carter@navy.mil |
| Phone: | 360-476-0844 |
2. CONTRACT ADMINISTRATION OFFICE (CAO) is responsible for matters specified in FAR 42.302 and DFARS 242.302 except in those areas otherwise designated herein.
| Name: | Brian Reed |
| Address: | FLC Puget Sound, Bremerton, WA |
| E-mail: | brian.c.reed@navy.mil |
| Phone: | 360-476-2804 |
3. DEFENSE CONTRACT AUDIT AGENCY (DCAA) is responsible for audit verification/provisional approval of invoices and final audit of the contract prior to final payment to the contractor.
Name: To be determined Address:
E-mail:
Phone:
4. PAYING OFFICE is responsible for payment of proper invoices after acceptance is documented.
Name: To be determined Address:
E-mail:
Phone:
5. CONTRACTING OFFICER'S REPRESENTATIVE (COR) is responsible for:
| a. Liaison with personnel at the Government installation and the contractor personnel on site; |
| b. Technical advice/recommendations/clarification on the statement of work (SOW); |
| c. The SOW for delivery/task orders placed under this contract; |
| d. An independent government estimate of the effort described in the definitized SOW; |
| e. Quality assurance of services performed and acceptance of the services or deliverables; |
| f. Government-furnished property (GFP); |
| g. Security requirements on Government installation; |
| h. Providing the PCO or his designated Ordering Officer with appropriate funds for issuance of the |
delivery/task order;
i. Certification of invoice for payment; and/or
j. Generation of CPARS report after completion of each period of performance (i.e., base period, option year, etc.).
NOTE: When, in the opinion of the Contractor, the COR requests effort outside the existing scope of the contract (or delivery/task order), the Contractor shall promptly notify the Contracting Officer (or Ordering Officer) in writing. No action shall be taken by the contractor under such direction until the Contracting Officer has issued a modification to the contract or, in the case of a delivery/task order, until the Ordering Officer has issued a modification of the delivery/task order; or until the issue has otherwise been resolved.
THE COR IS NOT AN ADMINISTRATIVE CONTRACTING OFFICER AND DOES NOT HAVE THE AUTHORITY TO DIRECT THE ACCOMPLISHMENT OF EFFORT WHICH IS BEYOND THE SOW IN THE CONTRACT OR DELIVERY/TASK ORDER.
COR Name: To be determined at time of award Address:
E-mail:
Phone:
In the event that the COR named above is absent due to leave, illness, or official business, all responsibilities and functions assigned to the COR will be the responsibility of the alternate COR listed below:
ACOR Name: N/A Address:
E-mail:
Phone:
6. TECHNICAL ASSISTANT, if assigned by the requiring activity, is responsible for providing technical assistance and support to the COR in contract administration by:
| a. Identifying contractor deficiencies to the COR; |
| b. Reviewing contract/delivery/task order deliverables and recommending acceptance/rejection of |
deliverables;
| c. Identifying contractor noncompliance with reporting requirements; |
| d. Evaluating contractor proposals for specific delivery/task orders and identifying areas of concern |
affecting negotiations;
e. Reviewing contractor status reports and providing recommendations for acceptance, rejection and/or clarification;
f. Reviewing invoices for appropriateness of costs and providing recommendations to facilitate certification of the invoice;
g. Providing COR with timely input regarding the SOW, technical direction to the contractor and recommending corrective actions;
h. Providing written reports to the COR as required concerning trips, meetings or conversations with the contractor; and
i. Assisting in preparation of final report on contractor performance for the applicable contract/delivery/ task order.
Name: To be determined at time of award Address:
E-mail:
Phone:
7. ORDERING OFFICER is responsible for:
| a. Requesting, obtaining, and evaluating proposals for orders to be issued; |
| b. Determining the estimated cost of the order is fair and reasonable for the effort proposed; |
| c. Obligating the funds by issuance of the delivery/task order; |
| d. Authorization for use of overtime; |
| e. Authorization to begin performance; and/or |
| f. Monitoring of total cost of delivery/task orders issued. |
The following limitations/restrictions are placed on the Ordering Officer:
| a. Type of order issued is limited by this contract to @@ pricing arrangements; |
| b. No order shall be placed in excess of $ @@ without the prior approval of the PCO; |
| c. No order shall be placed with delivery requirements in excess of @@; |
| d. The Ordering Officer may negotiate revisions/modifications to orders, but only within the scope of this |
contract. Ordering Officers have no authority to modify any provision of the basic contract; and/or
e. The Ordering Officer may enter into mutual no-cost cancellations of orders under this contract and may reduce the scope of orders/task, but Terminations for Convenience or Terminations for Default shall be issued only by the CAO.
| Name: | Various C/200 Contracting Officers |
| Address: | FLC Puget Sound, Bremerton, WA |
| E-mail: | N/A |
| Phone: | N/A |
Section H - Special Contract Requirements
THE FOLLOWING NAVSUP LOCAL TEXT IS HEREBY MADE PART OF THE STATEMENT OF WORK/PERFORMANCE WORK STATEMENT.
REPORTING REQUIREMENTS
A status report shall be submitted on a monthly basis to the Procuring Contracting Officer, Contracting Officer's Representative, Ordering Officer (if applicable) and Administrative Contracting Officer. The report shall provide the number of hours expended, the total cost incurred to date, data status and delivery status.
Section I - Contract Clauses
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-6 |
| Restrictions On Subcontractor Sales To The Government |
| SEP 2006 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-13 |
| Contractor Code of Business Ethics and Conduct |
| OCT 2015 |
| 52.204-2 |
| Security Requirements |
| AUG 1996 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| OCT 2016 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2016 |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications. |
| DEC 2014 |
| 52.209-6 |
| Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment |
| OCT 2015 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.210-1 |
| Market Research |
| APR 2011 |
| 52.211-5 |
| Material Requirements |
| AUG 2000 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-2 Alt II |
| Audit and Records--Negotiation (Oct 2010) - Alternate II |
| AUG 2016 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.215-10 |
| Price Reduction for Defective Certified Cost or Pricing Data |
| AUG 2011 |
| 52.215-11 |
| Price Reduction for Defective Certified Cost or Pricing Data--Modifications |
| AUG 2011 |
| 52.215-12 |
| Subcontractor Certified Cost or Pricing Data |
| OCT 2010 |
| 52.215-13 |
| Subcontractor Certified Cost or Pricing Data--Modifications |
| OCT 2010 |
| 52.215-14 Alt I |
| Integrity of Unit Prices (Oct 2010) - Alternate I |
| OCT 1997 |
| 52.215-15 |
| Pension Adjustments and Asset Reversions |
| OCT 2010 |
| 52.215-18 |
| Reversion or Adjustment of Plans for Postretirement Benefits (PRB) Other than Pensions |
| JUL 2005 |
| 52.215-19 |
| Notification of Ownership Changes |
| OCT 1997 |
| 52.215-21 |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data -- Modifications |
| OCT 2010 |
| 52.215-23 |
| Limitations on Pass-Through Charges |
| OCT 2009 |
| 52.216-8 |
| Fixed Fee |
| JUN 2011 |
| 52.219-8 |
| Utilization of Small Business Concerns |
| NOV 2016 |
| 52.219-9 |
| Small Business Subcontracting Plan |
| JAN 2017 |
| 52.219-9 Alt II |
| Small Business Subcontracting Plan (JAN 2017) Alternate II |
| NOV 2016 |
| 52.219-9 Alt II (Dev) |
| Small Business Subcontracting Plan (Deviation 2016-O0009) - Alternate II |
| JAN 2017 |
| 52.219-16 |
| Liquidated Damages-Subcontracting Plan |
| JAN 1999 |
| 52.222-20 |
| Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 |
| MAY 2014 |
| 52.222-21 |
| Prohibition Of Segregated Facilities |
| APR 2015 |
| 52.222-26 |
| Equal Opportunity |
| SEP 2016 |
| 52.222-35 |
| Equal Opportunity for Veterans |
| OCT 2015 |
| 52.222-35 (Dev) |
| Equal Opportunity for Veterans (Deviation 2017-O0008) |
| SEP 2017 |
| 52.222-36 |
| Equal Opportunity for Workers with Disabilities |
| JUL 2014 |
| 52.222-36 (Dev) |
| Equal Opportunity for Workers with Disabilites (Deviation 2017-O0008) |
| SEP 2017 |
| 52.222-37 |
| Employment Reports on Veterans |
| FEB 2016 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-54 |
| Employment Eligibility Verification |
| OCT 2015 |
| 52.222-60 |
| Paycheck Transparency (Executive Order 13673) |
| OCT 2016 |
| 52.222-61 |
| Arbitration of Contractor Employee Claims (Executive Order 13673) |
| DEC 2016 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| JUN 2008 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-2 |
| Notice And Assistance Regarding Patent And Copyright Infringement |
| DEC 2007 |
| 52.227-14 |
| Rights in Data--General |
| MAY 2014 |
| 52.230-2 |
| Cost Accounting Standards |
| OCT 2015 |
| 52.230-6 |
| Administration of Cost Accounting Standards |
| JUN 2010 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-20 |
| Limitation Of Cost |
| APR 1984 |
| 52.232-23 Alt I |
| Assignment of Claims (May 2014) - Alternate I |
| APR 1984 |
| 52.232-25 |
| Prompt Payment |
| JAN 2017 |
| 52.232-33 |
| Payment by Electronic Funds Transfer--System for Award Management |
| JUL 2013 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-1 Alt I |
| Disputes (May 2014) - Alternate I |
| DEC 1991 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-3 Alt I |
| Protest After Award (Aug 1996) - Alternate I |
| JUN 1985 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.242-1 |
| Notice of Intent to Disallow Costs |
| APR 1984 |
| 52.242-2 |
| Production Progress Reports |
| APR 1991 |
| 52.242-3 |
| Penalties for Unallowable Costs |
| MAY 2014 |
| 52.242-4 |
| Certification of Final Indirect Costs |
| JAN 1997 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.243-2 |
| Changes--Cost-Reimbursement |
| AUG 1987 |
| 52.244-5 |
| Competition In Subcontracting |
| DEC 1996 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| JAN 2017 |
| 52.245-1 |
| Government Property |
| JAN 2017 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.246-24 |
| Limitation Of Liability--High-Value Items |
| FEB 1997 |
| 52.249-6 |
| Termination (Cost Reimbursement) |
| MAY 2004 |
| 52.249-14 |
| Excusable Delays |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.201-7000 |
| Contracting Officer's Representative |
| DEC 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 Alt A |
| System for Award Management Alternate A |
| FEB 2014 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| OCT 2016 |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| MAY 2016 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| OCT 2015 |
| 252.215-7000 |
| Pricing Adjustments |
| DEC 2012 |
| 252.215-7002 |
| Cost Estimating System Requirements |
| DEC 2012 |
| 252.219-7003 |
| Small Business Subcontracting Plan (DOD Contracts)--Basic |
| MAR 2016 |
| 252.222-7006 |
| Restrictions on the Use of Mandatory Arbitration Agreements |
| DEC 2010 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.225-7005 |
| Identification Of Expenditures In The United States |
| JUN 2005 |
| 252.225-7012 |
| Preference For Certain Domestic Commodities |
| DEC 2016 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.226-7001 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| SEP 2004 |
| 252.227-7013 |
| Rights in Technical Data--Noncommercial Items |
| FEB 2014 |
| 252.227-7016 |
| Rights in Bid or Proposal Information |
| JAN 2011 |
| 252.227-7030 |
| Technical Data--Withholding Of Payment |
| MAR 2000 |
| 252.227-7037 |
| Validation of Restrictive Markings on Technical Data |
| SEP 2016 |
| 252.231-7000 |
| Supplemental Cost Principles |
| DEC 1991 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.242-7004 |
| Material Management And Accounting System |
| MAY 2011 |
| 252.242-7005 |
| Contractor Business Systems |
| FEB 2012 |
| 252.242-7006 |
| Accounting System Administration |
| FEB 2012 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
| 252.244-7001 |
| Contractor Purchasing System Administration |
| MAY 2014 |
| 252.245-7002 |
| Reporting Loss of Government Property |
| APR 2012 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
| 252.246-7001 |
| Warranty Of Data |
| MAR 2014 |
| 252.246-7003 |
| Notification of Potential Safety Issues |
| JUN 2013 |
| 252.246-7004 |
| Safety of Facilities, Infrastructure, and Equipment for Military Operations |
| OCT 2010 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| APR 2014 |
| 252.247-7024 |
| Notification Of Transportation Of Supplies By Sea |
| MAR 2000 |
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM
EMPLOYEES OF WHISTLEBLOWER RIGHTS (APR 2014)
(a) This contract and employees working on this contract will be subject to the whistleblower rights and remedies in the pilot program on Contractor employee whistleblower protections established at 41 U.S.C. 4712 by section 828 of the National Defense Authorization Act for Fiscal Year 2013 (Pub. L. 112-239) and FAR 3.908.
(b) The Contractor shall inform its employees in writing, in the predominant language of the workforce, of employee whistleblower rights and protections under 41 U.S.C. 4712, as described in section 3.908 of the Federal Acquisition Regulation.
(c) The Contractor shall insert the substance of this clause, including this paragraph (c), in all subcontracts over the simplified acquisition threshold.
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its information system.
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management database via https://www.acquisition.gov.
(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments--
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by--
(i) Government personnel and authorized users performing business on behalf of the Government; or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for--
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the Contractor's record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013)
(a) Invoicing.
(1) The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with Federal Acquisition Regulation (FAR) subpart 31.2 in effect on the date of this contract and the terms of this contract. The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract.
(2) Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior to the final payment under the contract are contract financing payments, except interim payments if this contract contains Alternate I to the clause at 52.232-25.
(3) The designated payment office will make interim payments for contract financing on the (Contracting Officer insert day as prescribed by agency head; if not prescribed, insert “30th”) day after the designated billing office receives a proper payment request.
In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(b) Reimbursing costs. (1) For the purpose of reimbursing allowable costs (except as provided in subparagraph (b)(2) of the clause, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term "costs" includes only--
(i) Those recorded costs that, at the time of the request for reimbursement, the Contractor has paid by cash, check, or other form of actual payment for items or services purchased directly for the contract;
(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for--
(A) Supplies and services purchased directly for the contract and associated financing payments to subcontractors, provided payments determined due will be made--
(1) In accordance with the terms and conditions of a subcontract or invoice; and
(2) Ordinarily within 30 days of the submission of the Contractor's payment request to the Government;
(B) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;
(C) Direct labor;
(D) Direct travel;
(E) Other direct in-house costs; and
(F) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under Government contracts; and
(iii) The amount of financing payments that have been paid by cash, check, or other forms of payment to subcontractors.
(2) Accrued costs of Contractor contributions under employee pension plans shall be excluded until actually paid unless--
(i) The Contractor's practice is to make contributions to the retirement fund quarterly or more frequently; and
(ii) The contribution does not remain unpaid 30 days after the end of the applicable quarter or shorter payment period (any contribution remaining unpaid shall be excluded from the Contractor's indirect costs for payment purposes).
(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) of this clause, allowable indirect costs under this contract shall be obtained by applying indirect cost rates established in accordance with paragraph (d) of this clause.
(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government shall be disregarded for purposes of cost-reimbursement under this clause.
(c) Small business concerns. A small business concern may receive more frequent payments than every 2 weeks.
(d) Final indirect cost rates. (1) Final annual indirect cost rates and the appropriate bases shall be established in accordance with Subpart 42.7 of the Federal Acquisition Regulation (FAR) in effect for the period covered by the indirect cost rate proposal.
(2)(i) The Contractor shall submit an adequate final indirect cost rate proposal to the Contracting Officer (or cognizant Federal agency official) and auditor within the 6-month period following the expiration of each of its fiscal years. Reasonable extensions, for exceptional circumstances only, may be requested in writing by the Contractor and granted in writing by the Contracting Officer. The Contractor shall support its proposal with adequate supporting data.
(ii) The proposed rates shall be based on the Contractor's actual cost experience for that period.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.