N00383-19-R-9504 1

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER RATING PAGE OF PAGES

UNDER DPAS (15 CFR 700) 1 104

2.CONTRACT

3.SOLICITATION NUMBER 4.TYPE OF SOLICITATION 5.DATE ISSUED 6.REQUISITION/PURCHASE NUMBER

N00383-19-R-9504

SEALED BID (IFB)

NEGOTIATED (RFP) 02/08/2019

N00383-19-Y-9504

7. ISSUED BY CODE N00383 8. ADDRESS OFFER TO (If other than Item 7)

NAVSUP Weapon Systems Support-Philadelphia 700 Robbins Avenue Philadelphia, PA 19111-5098

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”

SOLICITATION

9. Sealed offer in original and 0 copies for furnishing the supplies or service in the Schedule will be received at the place specified in Item 8, or if handicapped, uploaded electronically to the secure server located at: www.neco.navy.mil until 2:00 p.m. local time 11 March 2019.

CAUTION – LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL ►

A. NAME B. TELEPHONE (NO COLLECT CALLS) C. E-MAIL ADDRESS

AREA CODE NUMBER EXT

Tiffany Vu 215 697 - 0104 0104 Tiffany.vu@navy.mil

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)

PART I – THE SCHEDULE PART II – CONTRACT CLAUSES

x A SOLICITATION/CONTRACT FORM 1 x I CONTRACT CLAUSES x B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART III – LIST OF DOCUMENTS, ESHIBITS ANDOTHER ATTACH.

x C DESCRIPTION/SPECS./WORK STATEMENT x J LIST OF ATTACHMENT x D PACKAGING AND MARKING PART IV – REPRESENTATIONS AND INSTRUCTIONS x

E INSPECTION AND ACCEPTANCE

K

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS x F DELIVERIES OR PERFORMANCE x x G CONTRACT ADMINISTRATION DATA x L INSTRS.,CONDS., AND NOTICES TO OFFERORS x H SPECIAL CONTRACT REQUIREMENTS x M EVALUATION FACTORS FOR AWARD

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within 180 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s) within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT 10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS(%) CALENDAR DAYS(%)

(See Section I, Clause No. 52.232-8) ►

14. ACKNOWLEDGEMENT OF AMEND-

MENTS (The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

AMENDMENT NO. DATE AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFEROR

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or Print)

15B. TELEPHONE NUMBER 15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE – ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18.OFFER DATE

AREA CODE NUMBER EXT

AWARD (To be completed by Government)

19.ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL ANDOPEN COMPETITION: 23. SUBMIT INVOICES TO ADDRESS SHOWN IN(4 copies unless otherwise specified)

ITEM

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28.AWARD DATE

(Signature of Contracting Officer)

IMPORTANT – Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

N00383-19-R-9504 2

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED

PAGES

NAME OF OFFEROR OR CONTRACTOR

ITEM NO. SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

A001 7R H 1650-01-551-6047

VALVE ASSEMBLY, HYDR

0711475-015

A002

A002AA

7R H 1650-01-614-7896

VALVE, START, EAPS

0711570-001

7R H 1650-01-588-7629

VALVE ASSEMBLY, HYDR

0711475-019

N00383-19-R-9504 3

TABLE OF CONTENTS

PART I THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A01 - TYPE OF CONTRACT – REQUIREMENTS CONTRACT

A02 - FAR 52.216-21 - REQUIREMENTS (OCT 1995)

A03 - DFARS 252.216-7006 - ORDERING (MAY 2011)

A04 - FAR 52.216-19 - ORDER LIMITATIONS (OCT 1995)

SECTION B - SUPPLIES/SERVICES AND PRICES

B01 - SERVICES, MATERIALS, AND PARTS TO BE FURNISHED

B02 - PLACING AND PROCESSING ORDERS

B03 – DFARS 252.217-7028 – OVER AND ABOVE WORK (DEC 1991)

B04 - WSSTERMBZ01 - ***IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION REPORTING***

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C01 - INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED

C02 - SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK (SOW)(AUG 2006)

C03 - WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK (SOW)

C04 – SUPTXT204-9400(1-17) - CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED HEALTH INFORMATION

(APR 2017)

C05 - WSSTERMCZ01 - CONFIGURATION CONTROL

C06 - DFARS 252.211-7005 - SUBSTITUTIONS FOR MILITARY OR FEDERAL SPECIFICATIONS AND STANDARDS (NOV 2005) (applicable >$3K)

C07 – SPECIFICATIONS FOR MINI-STOCK POINT

SECTION D - PACKAGING AND MARKING

D01 - DFARS 252. 211-7006 - PASSIVE RADIO FREQUENCY IDENTIFICATION (JUN 2016)

D02 - DFARS 252.211-7003 - ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)

D03 - WSSTERMDZ03 - PRESERVATION, PACKAGING, PACKING AND MARKING

SECTION E - INSPECTION AND ACCEPTANCE

E01 - FAR 52.246-2 (IBR) - INSPECTION OF SUPPLIES - FIXED-PRICE (AUG 1996)

E02 - FAR 52.246-16 - RESPONSIBILITY FOR SUPPLIES (APR 1984)

E03 - WSSTERMEZ03 - HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT

E04 - INSPECTION AND ACCEPTANCE AT ORIGIN (REPAIRABLE ASSEMBLIES)

E05 - INSPECTION AND ACCEPTANCE AT DESTINATION (REPORTS)

SECTION F - DELIVERIES OR PERFORMANCE

F01 - FAR 52.252-2 - CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

F02 - TIME OF DELIVERY

F03 - PLACE OF DELIVERY

F04 - WSSTERMFZ05 - FMS DELIVERY AND SHIPPING INSTRUCTIONS

F05 - WSSTERMFZ07 - REDISTRIBUTION ORDER/READY FOR ISSUE – NAVY TRANSPORTATION – CAV DIRECT SHIP

F06 – WSSTERMFZ15 - COMMERCIAL ASSET VISIBILITY (CAV) REPORTING

F07 – WSSTERMFZ216 - NAVSUP WEAPON SYSTEM SUPPORT (NAVSUP WSS) INVENTORY TRANSACTION

REPORTING (F.O.B. ORIGIN)

SECTION G - CONTRACT ADMINISTRATION

G01 - CONTRACT ADMINISTRATION

G02 - DFARS 252.232-7006 - WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H01 - WSSTERMHZ02 - QUALITY ASSURANCE REPRESENTATIVE (QAR)

H02 - WSSTERMHZ10 - CONTRACT SECURITY CLASSIFICATION SPECIFICATION

N00383-19-R-9504 4

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES

I01 - FAR 52.252-2 - CONTRACT CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I02 - WARRANTY FOR OVERHAUL AND REPAIR

I03 – DFARS 252.204-7012 – SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING

(OCT 2016)

I04 - FAR 52.217-9 – OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

I05 - DFARS 252.208-7000 - INTENT TO FURNISH PRECIOUS METALS AS GOVERNMENT-FURNISHED MATERIAL (DEC 1991) (applicable >SAT, unless the contracting officer knows that the items being acquired do not require precious metals)

I06 - FAR 52.219-3 – NOTICE OF HUBZONE SET-ASIDE OR SOLE SOURCE AWARD (NOV 2011)

I07 – FAR 52.219-9 - SMALL BUSINESS SUBCONTRACTING PLAN (CD 2016-O0009)(AUG 2016) I08 - DFARS 252.219-7003 - SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS)-BASIC (MAR 2016) I09 - DFARS 252.219-7004 - SMALL BUSINESS SUBCONTRACTING PLAN (TEST PROGRAM) (OCT 2014)

I10 - FAR 52.222-35 - EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)

I11 - FAR 52.222-36 – EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

I12 - DFARS 252.222-7006 - RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS (DEC 2010) I13 - FAR 52.223-9 - ESTIMATE PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGNATED ITEMS

(MAY 2008)

I14 - FAR 52.223-11 - OZONE-DEPLETING SUBSTANCES (JUN 2016)

I15 - DFARS 252.225-7027 - RESTRICTION ON CONTINGENT FEES FOR FOREIGN MILITARY SALES (FMS) (APR 2003) I16 - DPAP 252.225-7994 - ADDITIONAL ACCESS TO CONTRACTOR AND SUBCONTRACTOR RECORDS IN THE UNITED

STATES CENTRAL COMMAND THEATER OF OPERATIONS (CD 2015-O0013)(MAR 2015)

I17 - DFARS 252.232-7004 - DOD PROGRESS PAYMENT RATES (OCT 2014)

I18 - DFARS 252.244-7000 - SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013)

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J - ATTACHMENTS

A – ITEMS TO BE REPAIRED AND/OR MODIFIED

B – PACKAGING INSTRUCTIONS *(Philadelphia buyer only)*

C – PRICING SHEETS

D – DD FORM 1423 CONTRACT DATA REQUIREMENTS LIST (CDRL), AS APPLICABLE

E – SECURITY REQUIREMENTS – (DD254), AS APPLICABLE

F – GOVERNMENT FURNISHED PROPERTY/SPECIAL TOOLING/SPECIAL TEST EQUIPMENT, AS APPLICABLE

G – REPAIR MANUALS AND FACILITIES

H – GOVERNMENT FURNISHED MATERIAL, AS APPLICABLE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS

K01 - FAR 52.252-2 - CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

K02 - FAR 52.204-8 - ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2017)

K03 - FAR 52.204-20 - PREDECESSOR OF OFFEROR (JUL 2016)

K04 - FAR 52.207-4 - ECONOMIC PURCHASE QUANTITY - SUPPLIES (AUG 1987)

K05 - FAR 52.209-7 - INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013)

K06 – FAR 52.209-11 - REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A

FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

K07 - FAR 52.230-1 - COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (OCT 2015) K08 - FAR 52.230-7 - PROPOSAL DISCLOSURE--COST ACCOUNTING PRACTICE CHANGES (APR 2005) K09 - DFARS 252.204-7007 - ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2015) K10 - DFARS 252.204-7008 - COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION CONTROLS

(OCT 2016)

K11 - DFARS 252.215-7009 - PROPOSAL ADEQUACY CHECKLIST (JAN 2014)

K12 - DFARS 252.217-7026 - IDENTIFICATION OF SOURCES OF SUPPLY (NOV 1995)

K13 - DFARS 252.223-7001 - HAZARD WARNING LABELS (DEC 1991)

K14 - DFARS 252.225-7000 - BUY AMERICAN—BALANCE OF PAYMENTS PROGRAM CERTIFICATE—BASIC (NOV 2014) K15 - DFARS 252. 225-7010 - COMMERCIAL DERIVATIVE MILITARY ARTICLE-SPECIALTY METALS COMPLIANCE

CERTIFICATE (JUL 2009)

K16 - DFARS 252.225-7020 - TRADE AGREEMENTS CERTIFICATE—BASIC (NOV 2014)

N00383-19-R-9504 5 K17 - DFARS 252.225-7035 - BUY AMERICAN—FREE TRADE AGREEMENTS—BALANCE OF PAYMENTS PROGRAM

CERTIFICATE—BASIC (NOV 2014)

K18 - DFARS 252.247-7022 - REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (AUG 1992)

K19 - WSSTERMKZ01 - PRICING INFORMATION

K20 – DPAP 252.209-7994 - REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELIQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW-FISCAL YEAR 2014 APPROPRIATIONS (CD 2014-

O0004)(OCT 2013)

K21 – DPAP 252.209-7993 - REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID DELIQUENT TAX LIABILITY OR A FELONY CONVICTION UNDER ANY FEDERAL LAW-FISCAL YEAR 2014 APPROPRIATIONS (CD 2014-

O0009)(FEB 2014)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

L01 - FAR 52.252-2 - CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

L02 - CERTIFICATE OF CURRENT COST OR PRICING DATA

L03 – FAR 52.203-2 - CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985)

L04 - FAR 52.211-14 - NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND

ENERGY PROGRAM USE (APR 2008)

L05 - FAR 52.215-20 - REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED

COST OR PRICING DATA (OCT 2010)

L06- FAR 52.216-1 - TYPE OF CONTRACT (APR 1984) (applicable to Solicitations >SAT) L07 - FAR 52.233-2 - SERVICE OF PROTEST (SEP 2006) (applicable to Solicitations >SAT)

L08 – SUPTXT243-9400(1-92) - AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER

L09 – SUPTXT245-9409(1-92) - FACILITIES

L10 - WSSTERMLZ05 - REVIEW OF AGENCY PROTESTS

L11 - WSSTERMLZ06 - CONSIGNMENT INSTRUCTIONS

SECTION M - EVALUATION FACTORS FOR AWARD

M01 - FAR 52.247-47 - EVALUATION -- F. O. B. ORIGIN (JUN 2003)

M02 - WSSTERMMZ01 - EVALUATION CRITERIA AND BASIS FOR AWARD – SINGLE AWARD

M03 - WSSTERMMZ03 - EVALUATION FACTORS FOR AWARD - REPAIR

The text of all FAR, DFARS, and NMCARS provisions and clauses may be accessed electronically at the following links:

FAR, DFARS and NMCARS at the Hill AFB website --http://farsite.hill.af.mil/VFFARa.htm

FAR only at the GSA website (click on “Regulations: FAR”) --http://www.acquisition.gov/far/index.html

DFARS and NMCARS only at the DPAP website --https://acquisition.navy.mil/rda/home/policy_and_guidance

NAVSUP and NAVSUP WSS specific Text and Statement of Work Language will be contained in the body of the contract.

http://farsite.hill.af.mil/VFFARa.htm http://www.acquisition.gov/far/index.html https://acquisition.navy.mil/rda/home/policy_and_guidance

N00383-19-R-9504 6

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A01 - TYPE OF CONTRACT – REQUIREMENTS CONTRACT

This solicitation will ultimately result in award of a two (2) year REQUIREMENTS contract. For information explaining how this type of contract works, see the following pages.

Prices will be for Repair/Modification of the items specified on Attachment A hereto, for a period of two (2) years from the date of award. The quantities shown are the Government's best estimates and are neither minimum nor maximum quantities. All orders placed for repair during this time period shall be issued as priced orders. Therefore, offerors should insert firm-fixed prices for each year included in the Base and Option Periods.

All parts necessary to effect repairs shall be furnished by the contractor and shall be considered to have been included in the price of repairs.

A02 - FAR 52.216-21 - REQUIREMENTS (OCT 1995)

(a) This is a Requirements contract for the supplies and services specified and effective for the period stated in the schedule. The quantities of supplies or services specified in the schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government's requirements do not result in orders in the quantities cited in the schedule, that fact shall not constitute the basis for an equitable price adjustment.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering Clause. Subject to any limitations in the Delivery Order Limitations Clause or elsewhere in this contract, the Contractor shall furnish to the Government all supplies or services specified in the schedule and called for by the Ordering Clause. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(c) Except as this contract otherwise provides, the Government shall order from the Contractor all the supplies or services specified in the schedule that are required to be purchased by the Government activity or activities as specified in the schedule.

(d) The Government is not required to purchase from the Contractor requirements in excess of any limit on total orders under this contract.

(e) If the Government urgently requires delivery of any quantity of an item before the earliest date that delivery may be specified under this contract, and if the Contractor will not accept an order providing for the accelerated delivery, the Government may acquire the urgently required goods or services from another source.

(f) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and the Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period.

A03 - DFARS 252.216-7006 - ORDERING (MAY 2011)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract schedule. Such orders may be issued from _____________________ through _________________________ [insert dates].

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c)

(1) If issued electronically, the order is considered “issued” when a copy has been posted to the Electronic Document Access system, and notice has been sent to the contractor.

(2) If mailed or transmitted by facsimile, a delivery order or task order is considered "issued" when the Government deposits the order in the mail or transmits by facsimile. Mailing includes transmittal by U.S. mail or private delivery services.

(3) Orders may be issued orally only if authorized in the schedule.

A04 - FAR 52.216-19 - ORDER LIMITATIONS (OCT 1995)

(a) Minimum Order: When the Government requires supplies or services covered by this contract in an amount that is less than any minimum item quantity specified in Attachment “A,” the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum Order: The contractor is not obligated to honor: (See Attachment “A” for quantities.)

N00383-19-R-9504 7

(1) Any order for a single item in excess of the maximum quantity for the item.

(2) Any order for a combination of items in excess of the maximum for the order items.

(3) A series of orders from the same ordering office with 30 days that together call for quantities exceeding the limitation in subparagraphs (1) and (2) above.

(c) If this is a Requirements Contract (i.e., includes FAR 52.216-21 Requirements), the Government is not required to order a part of any one requirement from the contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order(s) is returned to the ordering office with 15 days after issuance, with the written notice stating the contractor’s intent not to ship the item(s) called for and the reason(s). Upon receiving this notice, the Government may acquire the supplies or services from another source.

A05 - FAR 52.216-19 - ORDER LIMITATIONS (OCT 1995)

(a) Minimum Order: When the Government requires supplies or services covered by this contract in an amount that is less than any minimum item quantity specified in Attachment “A,” the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum Order: The contractor is not obligated to honor: (See Attachment “A” for quantities.)

(1) Any order for a single item in excess of the maximum quantity for the item.

(2) Any order for a combination of items in excess of the maximum for the order items.

(3) A series of orders from the same ordering office with 30 days that together call for quantities exceeding the limitation in subparagraphs (1) and (2) above.

(c) If this is a Requirements Contract (i.e., includes FAR 52.216-21 Requirements), the Government is not required to order a part of any one requirement from the contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order(s) is returned to the ordering office with 15 days after issuance, with the written notice stating the contractor’s intent not to ship the item(s) called for and the reason(s). Upon receiving this notice, the Government may acquire the supplies or services from another source.

SECTION B - SUPPLIES/SERVICES AND PRICES

B01 - SERVICES, MATERIALS, AND PARTS TO BE FURNISHED

(a) The Government may order, in the manner provided elsewhere herein, the following types of effort:

(1) Repair and/or Modification: The contractor shall furnish effort including labor, material, and facilities as may be required to repair and/or modify the ordered quantities of spare repairable assemblies in the H-1 System. The spare repairable assemblies to be repaired and/or modified under this agreement are set forth by manufacturer's part number in Attachment "A" and constitute “Government Property” as defined in FAR clause 52.245-1 “Government Property” or 52.245-1 Alternate I, as applicable. Repair and/or modification of spare repairable assemblies will be accomplished in accordance with the Statement of Work (Section C03).

(2) CAVS Reporting: The Contractor shall furnish effort including labor, materials, and facilities as may be required to accumulate, format, and transmit the transactions specified in Section C02.

B02 - PLACING AND PROCESSING ORDERS

(a) Ordering Period: The Government may during the period commencing on the date of execution of this contract and ending four

(4) years from the date thereof, place orders for articles to be serviced hereunder. Twenty-four (24) months after date of contract, the PCO shall determine whether or not the contract is to be extended for an additional Twelve (12) month option period;

execution of the option shall be accomplished via SF-30 Contract Modification (and shall only be granted unilaterally by the PCO). Should the Option be exercised, the PCO shall determine at the end of the First 12-Month Option Period, whether or not the contract is to be extended for the Second 12-Month Option Period. Should the Second 12-Month Option Period be exercised, the PCO shall determine at the end of the Second 12-Month Option Period, whether or not the contract is to be extended for the Third 12-Month Option Period. Each order placed shall be issued and processed in the manner hereafter provided.

(b) Authorized Ordering Activity

(1) The Procuring Contracting Officer (PCO) shall place orders under this agreement in the manner provided elsewhere herein;

(2) The Administrative Contracting Officer (ACO) may place orders under this agreement in the manner provided elsewhere herein.

N00383-19-R-9504 8

(c) Form and Content of Orders: Orders issued under this Contract shall be prepared on DD Form 1155; however, if exigency so demands, order may be issued via electronic transmission (e.g. FAX) and will be confirmed by DD Form 1155 as soon as practicable thereafter, and will bear the notation "CONFIRMING ORDER.” In addition, each DD Form 1155 order shall include the following:

(1) The order number, date, and appropriate reference to this contract;

(2) Citation of the negotiation authority pursuant to which the order is negotiated;

(3) Description of services to be performed and identification of specific articles to be Serviced including part number and stock number, serial number if available, and quantities thereof;

(4) Where appropriate, special instructions regarding shipping, place of inspection and delivery, and DoD priority designation;

(5) Applicable appropriation and accounting data and special invoicing instructions, if applicable;

(6) Applicable DO Rating certified under DMS Regulation No. 1.

(d) Obligations of Contractor

(1) The contractor shall, except as specified in paragraph (2) below, immediately proceed with the servicing of the articles covered by the order.

(2) Where the contractor is not authorized to proceed, the contractor shall so advise the PCO (by FAX, if available) within five

(5) working days after receipt of the order. The contractor shall await instruction from the PCO regarding orders described in (ii), (iii) above. Such instructions shall be issued within five (5) working days, or such additional period as the PCO may require after being advised by the contractor of the circumstances preventing the start of performance. With respect to (i) above, the contractor shall advise the PCO of the specific representation or certification that cannot be made as to an order and reason(s) therefore. In regard to (iv) above, the contractor shall notify the PCO and the cognizant ACO and shall stop work until given further instructions or disposition of the item by NAVSUP WSS.

(3) The contractor shall establish and maintain:

(i) A summary of all costs incurred applicable to all orders placed pursuant to the terms of this contract.

(ii) The summary records required in (i) above shall be furnished to the Contracting Officer upon request.

Note to Contractor:

Sixty (60) days after induction of the last unit received against delivery orders issued hereunder, Contractor shall notify the ACO (with a copy to the PCO) of the actual quantities inducted for repair.

Note to ACO:

Within thirty (30) days of ACO’s receipt of contractor’s notice of last induction, unless otherwise specified by NAVSUP WSS, ACO shall modify the delivery order, to reduce all excess quantities and funds.

B03 – DFARS 252.217-7028 – OVER AND ABOVE WORK (DEC 1991)

(a) Definitions. As used in this clause—

(1) “Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts that is—

(i) Within the general scope of the contract;

(ii) Not covered by the line item(s) for the basic work under the contract; and

(iii) Necessary in order to satisfactorily complete the contract.

(2) “Work request” means a document prepared by the Contractor which describes over and above work being proposed.

(b) The Contractor and Administrative Contracting Officer shall mutually agree to procedures for Government administration and Contractor performance of over and above work requests. If the parties cannot agree upon the procedures, the Administrative Contracting Officer has the unilateral right to direct the over and above work procedures to be followed. These procedures shall, as a minimum, cover—

(1) The format, content, and submission of work requests by the Contractor. Work requests shall contain data on the type of discrepancy disclosed, the specific location of the discrepancy, and the estimated labor hours and material required to correct the discrepancy. Data shall be sufficient to satisfy contract requirements and obtain the authorization of the Contracting Officer to perform the proposed work;

(2) Government review, verification, and authorization of the work; and

(3) Proposal pricing, submission, negotiation, and definitization.

(c) Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the Government a work request in accordance with the agreed-to procedures.

(d) The Government shall—

(1) Promptly review the work request;

(2) Verify that the proposed work is required and not covered under the basic contract line item(s);

(3) Verify that the proposed corrective action is appropriate; and

(4) Authorize over and above work as necessary.

N00383-19-R-9504 9

(e) The Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work.

(f) Failure to agree on the price of over and above work shall be a dispute within the meaning of the Disputes clause of this contract.

B04 - WSSTERMBZ01 - ***IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION REPORTING*** Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Additional information regarding reporting via Commercial Asset Visibility (CAV) is available at https://www.navsup.navy.mil/public/navsup/wss/pi_cd/.

Questions can be addressed to NAVSUPWSSCAVSOW@navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to NAVSUPWSSM.CAVSOW@navy.mil for NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104). (06-16) https://www.navsup.navy.mil/public/navsup/wss/pi_cd/

N00383-19-R-9504 10

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C01 - INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED

(a) Articles to be repaired and/or modified under this agreement, as shown on Attachment "A", will be shipped at the Government's expense to the plant of the contractor at:

ARKWIN INDUSTRIES, INC (98391)

686 Main Street Westbury, NY 11590-5093

The contractor shall receive for each shipment a list (referencing this agreement number) of the articles included in the shipment.

(b) Upon receipt of such articles, the contractor shall:

(1) If the ACO issues the orders, then, promptly notify the ACO of the receipt of the articles;

(2) Verify that the articles received corresponds with the list of the articles furnished for such shipment;

(3) Inspect such articles to assure that they are candidates for servicing under this agreement;

(4) Segregate those which were improperly sent to the contractor and request disposition instructions therefore from the NAVSUP Weapon Systems Support PCO;

(5) Provide adequate storage for articles to be repaired pending issuance of an order by the ACO or PCO hereunder;

(6) Not proceed with the repair of any articles set forth in Attachment "A" (i.e., inducting any units into "M" condition) until funding authorization is received from the ACO or PCO. Retain such units in "F" condition until funding authorization/disposition instructions are received from the Government (ACO or PCO).

(7) Advise the Government (ACO and PCO) if any portion of the required repair is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship, or otherwise not in conformance with the requirements of the contract under which such articles were originally furnished; and

(8) Further advise the Government (ACO or PCO) of the results of the foregoing preliminary inspection, together with a list of the articles and quantities required to be repaired.

C02 - SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK (SOW)(AUG 2006)

1.0 SCOPE

1.1. General. The items to be furnished hereunder shall be repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this Contract. Government Furnished Property (GFP), including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the Contractor unless expressly provided for on Attachment F. This limitation regarding the furnishing of GFP applies notwithstanding any reference to the contrary in any drawing, manual, or specification for the Contract items.

1.2. Repair Requirements. The Contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the items (see Attachment A for a list of these items) to a Ready For Issue (RFI) condition.

RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The Contractor shall identify on Attachment G the governing repair manual(s)/documents for each item covered by this Contract. On the same attachment, the Contractor must identify the facility for each item where repair, including final test and inspection, is completed.

1.2.1. Changes to repair manuals/documents and changes to drawings or specifications for the manufacture of parts utilized in these repairs require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Contract. In addition, as provided for in Section 2.3, requests for changes to a repair source or repair facility shall be submitted in writing to the PCO and must be approved prior to making any such change.

1.2.2. Any repairs performed using unapproved changes to manuals, drawings, specifications, or unapproved changes to a repair source or facility are not permitted and any such changes are done entirely at the Contractor’s own risk.

1.2.3. The Contractor is not entitled to any equitable adjustment to the price or Contract terms based on the Government’s disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

1.3. Beyond Physical Repair (BPR)

1.3.1. Scope. An item is BPR when the item is not capable of being repaired in accordance with the Statement of Work due to the extent of physical damage.

1.3.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BPR. All such determinations, including the basis for the determination and the DCMA written concurrence shall be provided by the Contractor to the PCO, with a copy to the Inventory Manager (IM). After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions. If provided disposition instructions, the contractor shall submit a proposal for BER pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the

N00383-19-R-9504 11 Contractor’s approved Government property disposal procedures.

1.4. Beyond Economical Repair (BER)

1.4.1. Scope. An item is BER if the cost of the repair exceeds 75% of the replacement price identified on Attachment A. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this Contract.

1.4.2. Procedures. Items determined BER will be separately priced if the repair is authorized by the PCO. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the Contractor to the PCO, with a copy to the IM. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions or contractual authority for repair of the item. The Contractor is not authorized to proceed with the repair until notification is received from the PCO. If provided disposition instructions, the contractor shall submit a proposal for BER pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.

1.4.3. The following additional procedures may apply, if authorized, for the replacement of a BER SRA (Shop Repairable Assembly) within a WRA (Weapons Repairable Assembly) when the SRA has not been separately inducted. The Contractor may request authorization to:

Ship in place an accepted item from an existing spares or repair Contract, if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with Section III.I.2.a of the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. The Contractor must provide written notification of any item shipped in place or MILSTRIPed to the PCO and an equitable adjustment may be required. If authorization to ship in place or MILSTRIP is not provided, the Contractor shall contact the PCO for further instructions.

1.5. Missing on Induction (MOI).

1.5.1. Scope. A WRA is subject to this MOI provision if the item received by the Contractor for repair is missing one or more SRAs and the SRA is not a separately inducted item. Contractor replacement of MOI SRAs is not included in the contract price. Items received by the Contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the Contractor under this Contract.

1.5.2. Procedures. The Contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The Contractor shall provide written notice of all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the IM with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The Contractor shall not proceed with repair of WRAs with MOI SRAs until instructions on how to proceed are provided to the Contractor.

1.5.3. The following additional procedures may apply, if authorized, for the replacement of a MOI SRA within a WRA. The Contractor may request authorization to:

Ship in place an accepted item from an existing spares or repair BOA, if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with Section III.I.2.b of the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. If either of these options is not authorized, the Contractor shall contact the PCO for further instructions.

1.6. Swapping SRAs

1.6.1. Scope. On rare occasions the Contractor may request authority to replace a failed but repairable SRA (within an inducted WRA) that is not BPR, BER or MOI.

1.6.2. Procedures. The Contractor may request authorization to replace the failed SRA unit from the Contractor’s production line, by MILSTRIP for an RFI item from Government stock, or with another repairable WRA, i.e. cannibalization.

Permission from the PCO must be obtained and an equitable adjustment may be required. Authorization to ship in place from the Contractor’s production line or MILSTRIP must be appropriately documented in accordance with Section III.I.2.c of the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK.

Although permission from the PCO is required if the SRA is obtained from another repairable WRA (cannibalized), that transaction does not have to be input into CAV.

1.7. Over and Above Repair (OAR).

N00383-19-R-9504 12

1.7.1. Scope. An item sent to the Contractor shall be considered to require Over and Above Repair (OAR) effort if the repair required is highly unusual, not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item.

Therefore, repair of OAR items may be subject to equitable adjustment.

1.7.2. Procedures. To the maximum extent possible, OAR shall be identified by the Contractor as part of the price proposal. If this is an undefinitized contract action, the Contractor shall identify OAR with the submission of the proposed ceiling price.

1.7.3. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the Contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions or contractual authority for repair of the item. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.

2.0 PARTS AND MATERIAL

2.1. The Contractor is responsible for supplying all parts and material necessary to perform the required repairs under this

Contract unless parts or material are specifically identified on Attachment H as Government Furnished Material (GFM). All parts and material used in performance of this Contract shall be in accordance with the latest approved revision of applicable drawings and specifications. The Contractor shall ensure it has access for the duration of this Contract to updated drawings and specifications for parts and material required for repairs performed under this Contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Contract.

2.2. All parts and material shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization of piece parts must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific additional approval by the PCO. Cannibalization or swapping, including any actions authorized under paragraphs 1.4, 1.5 and 1.6, shall not render an item BER or BPR.

2.3. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval. However, a Contractor who has been delegated authority by the Naval Air Systems Command in writing to approve a change in manufacturing source or a manufacturing facility may implement such a change after notifying the PCO.

2.3.1. Where there has been a change to a manufacturing source, the Contractor shall complete all qualification testing that was required when that item or component was originally qualified. Any changes in such testing shall be submitted to the Contracting Officer for Government review and approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the Contractor’s own risk. The Contractor is not authorized to deliver any items until such testing (including revised testing as properly approved) has been completed and the delivered items are repaired/manufactured in accordance with the qualification requirements package.

2.3.2. The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government’s disapproval of a requested change to the drawings, specifications or manufacturing source or facility.

2.4. Purchased Material Control and Parts Control. The Contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and material purchased are in compliance with the requirements of this Contract.

2.5. Receiving Inspection of Purchased Parts and Material. Purchased parts and material shall be inspected by the Contractor upon receipt at the Contractor’s facility to assure conformance with all requirements of the applicable drawings and specifications.

Alternatively, the Contractor shall submit, prior to contract award, evidence for Government review and approval of a purchased parts and material system which provides for adequate inspection to assure parts and material conform with all requirements of the applicable drawings and specifications.

2.5.1. Evidence of such inspections shall be maintained by the Contractor or Subcontractor for Government review at least twelve (12) months following the conclusion of the contract. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and processes with appropriate pass/fail criteria, such as certifications, and actual dimensional readings.

3.0 INSPECTION PROVISIONS

3.1. Government inspection shall be in accordance with FAR 52.246-2, Inspection of Supplies - Fixed-Price referenced in Section E, at source by DCMA unless otherwise specified in the Contract or as authorized by the Administrative Contracting Officer (ACO) or PCO. Acceptance testing shall be conducted under the surveillance of the DCMA QAR. These tests shall include all tests necessary to assure that the items repaired conform to the performance required to provide Ready For-Issue

N00383-19-R-9504 13 material. The DCMA retains the authority to require the Contractor to conduct or reconduct any tests deemed necessary to ensure compliance with the manuals, drawings and specifications applicable to this Contract.

C03 - WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK (SOW)

The CAV Statement of Work (SOW) is located at:

https://www.navsup.navy.mil/public/navsup/wss/pi_cd/.

C04 – SUPTXT204-9400(1-17) - CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED

HEALTH INFORMATION (APR 2017)

Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08-006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD-12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.

APPLICABILITY

This clause applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DoN or DoD computer/network/system to perform certain unclassified sensitive duties. This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.

Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.

ACCESS TO FEDERAL FACILITIES

Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command’s Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.

ACCESS TO DOD IT SYSTEMS

In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT-II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager.

Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation , which is a higher level investigation than the National Agency Check with Law and Credit (NACLC)/T3/T3R described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g. system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.

Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR- N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor.”

The SAAR-N shall be forwarded to the Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.

When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

https://www.navsup.navy.mil/public/navsup/wss/pi_cd/

N00383-19-R-9504 14

INTERIM ACCESS

The Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.