N0025319Q0259_YTT-11_ROH_Amendment_0002.pdf
PDF 227 KB Posted
- Attached to
- YTT-11 Regular Overhaul (ROH)
- Solicitation number
- N0025319Q0259
About this file
This solicitation is for a Regular Overhaul of the Yard Torpedo Test Craft 11. The Naval Undersea Warfare Center Division in Keyport, Washington is seeking a firm fixed price contract for ship repair services to be performed from May to August 2020 at the contractor's facility located within 864 nautical miles of Keyport. The solicitation includes thirty-two base requirements and twenty-six optional requirements. Interested vendors must request and review restricted technical drawings and data. Questions are due by December 18th and quotes are due by January 9th. Award will be made to the lowest priced technically acceptable offeror. The solicitation was posted to SAM.gov and any amendments will be posted there.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose for this amendment is to:
1. Answ er questions.
2. Extend the offer due date from 9 January 2020 at 12:00pm (PST) to 16 January 2020 at 12:00pm (PST).
3. Change CLIN 0038 to Optional.
4. Update CLINs 0052 and 0053.
5. Revise Statement of Work (SOW).
No additional questions w ill be entertained. Offerors must bid based upon available information.
All other specifications, requirements, and information identif ied in the RFQ remains the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Dec-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0025319Q0259
X 9B. DATED (SEE ITEM 11)
20-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Dec-2019
CODE
NAVAL UNDERSEA WARFARE CENTER
ATTN: PAUL BERGLUND
PAUL.B.BERGLUND@NAVY.MIL
610 DOWELL STREET, BLDG 206
KEYPORT WA 98345
N00253 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0025319Q0259
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
OFFEROR QUESTIONS AND ANSWERS
YTT-11 ROH Offeror Questions and Answers – N0025319Q0259 Question 1: Will the government be providing a Price Sheet or should the contractor provide their own?
Answer 1: No, offerors are to provide a price for each CLIN with exception to CLIN 0001 – CDRLs which is Not Separately Priced.
Question 2:
1)YTT-11 item 7.6.8, calls for 10 pieces of Galley/Mess equipment to be replaced.
7.6.8 Galley/Mess Upgrade REV 01
This SHIPALT replaces existing Galley and Mess Deck equipment, to reduce maintenance requirements and to update grease interceptor hood fire extinguishing system. Specific items to be replaced include the under counter refrigerator, coffee maker, ice/water dispenser, cold food counter, under counter icemaker, electric range/oven, grease interceptor hood, dishwasher, and food warming table. The existing trash compactor is to be removed and replaced with a storage cabinet having the same size.
2)Paragraphs 7.6.8.1.1 thru 7.6.8.1.1.4 says to replace only 4 items. Which is correct?
7.6.8.1 Accomplish the requirements of SHIPALT YTT/0039D REV 01 in accordance with 8565704, 8773992, 8773993, 8774003, 8774004, 8774005, and 8797585. Repair damage to preservation and decking systems in way of this work. All material shall be procured by the Contractor.
7.6.8.1.1 Replace ONLY the following new equipment:
7.6.8.1.1.1 Under counter refrigerator.
7.6.8.1.1.2 Ice/Water Dispenser
7.6.8.1.1.3 Electric Range/Oven
7.6.8.1.1.4 Grease Interceptor Hood
7.6.8.1.2 Accomplish removal of trash compactor and replace with cabinet per SHIPALT
YTT/0039D REV 01.
The drawing does not match the items called for to be replace in paragraph 7.6.8. (A) The cold food counter, Undercounter icemaker and the food warming table are not (hashed out) indicated to be removed on the drawing. (B) On the drawing the coffee maker is listed as to be retained for reuse. (C) The Freezer and refrigerator is listed on the drawing as being replace, but is not listed in paragraph 7.6.8. The specification says two different things in paragraphs 7.6.8 and
7.6.8.1.1 and the Galley Equipment upgrade drawing 8774004 sheet 2 “hashed marked equipment” for removal does not match the specification paragraph 7.6.8.
Answer 2: Replace only the following equipment:
1. Under counter refrigerator
2. Ice/Water Dispenser
3. Electric Range/Oven
4. Grease Interceptor Hood
5. Remove trash compactor and replace with cabinet per SHIPALT YTT/0039D REV01
Question 3: What type of hangers are required? Item 7.7.11 drawings state “adequality support for vibration and expansion”, the only information I can find is in the reference DWG 6500847, Item #1 is drawing 505-6348482 Piping Standard Detail, which was not provided.
Can you provide this drawing?
Answer 3: 6501097 STANDARD PIPING DETAILS and 860283 PIPE HANGERS will be provided via CD-ROM.
Question 4: Item 7.7.6 Bow Thruster Can you provide the following Manuals? They were not included in the CD.
7.7.6.2 Technical Manuals for reference:
HT600TD, Marine Maneuvering and Propulsion System Operation and Maintenance Manual GM2002E-3, Paramax 9000 Series Maintenance Manual
Answer 4: Both technical manuals will be provided via CD-ROM.
Question 5:
After reviewing the drawings associated with the solicitation SAR’s, we have discovered missing reference documents. Can you supply the missing reference documents on the list below?
SAR #
Supplied Drawing Missing References
SAR28 8773990 321-8629963 Elec Mods Steering Compt HVAC 512-6500955 HVAC Main DK 604-860091 Ladders, Vertical Assy & Dets (Steel) 501-6265454 Ventilation Instructions
SAR34 8629659 >
8629660 >
SAR40 8565694 NUWC-302001 A/C Chiller Pump FDN Mods 113-6828049 FDN for Relocated A/C SW Pump
8565695 >
8565696 320-8565580 Power System Interconnection Wiring Diagrams
320-8565581 Ships Power SYS One-Line Diagram 113-5293062 FDN-MISC ELEC Equip (Shock) 320-5302690 Cable Installation Requirements 101-5317400 STRL Penetrations in Surface Ships 113-5377425 MTG RQS SM EQ IN SHK CR Area 8565697 185-6501008 MISC FDNS Engine Room 8565698 545-1916591 Gage Board Standard Sizes 605-1874109 Label Plates Types
SAR44 8773994 >
SAR45 8565651 >
SAR47 8565648 >
SAR54 8565709 >
SAR58 8565710 >
8565711 >
SAR59 8565707 >
8565708 >
SAR63 8629867
8629868 437-6901181 TLI Circuit 17TK Mod Incd Grey Water Tank
801-8565566 Booklet of General Drawings 437-6500866 Tank Level Transmitter Piping
SAR66 8629847 >
8629877 > 8629878 >
8629879 >
SAR68 8629873 >
SAR70 8774000 >
8774001 >
SAR71 8774002 300-6500874 Cableway Arrangement Plans & Details
Answer 5: These drawings will be provided via CD-ROM.
Question 6:
Is the 100SF of New Steel supposed to be an OPTION Item? Or.
Priced into ITEM NO. 0006 SUPPLIES/SERVICES - SHIPALT TANK LEVEL INDICATORS
REPLACMNT
FFP - Paragraph 7.6.4 except sub-paragraphs marked as OPTIONAL. (No sub-paragraphs are marked as OPTIONAL)
Answer 6:
The 100 SF of new steel is a total amount. This paragraph is being made an optional item.
Question 7:
Section 7.6.3 AC Plant and Pump Replacement
SAR40 and drawing 8565694 both call for a new “53 Ton A/C Unit” giving part number 90YUNH9CSN4NK6F5U. The Carrier rep has indicated the provided part number is a 35 Ton A/C Unit, not a 53 Ton unit. Please advise if a 53 ton or a 35 ton unit is required?
Answer 7:
A 35 ton unit is required.
Question 8:
Paragraph 7.4.1 Underwater Hull does not mention preservation square footage.
Please provide the square footage of the underwater hull Keel to Six Inches Above Upper Boot Top Limit, including Port and Starboard Bow Thruster Pockets, Sea Chests, and Port and Starboard Torpedo Launchways and Voids
Answer 8:
Estimated to be 10,500 square feet.
Question 9:
Paragraph 7.4.3 Freeboard does not mention preservation square footage.
Please provide the square footage of the Freeboard Six Inches Above Upper Boot Top Limit to Upper Limit of Side Shell and Transom Plating.
Answer 9:
Estimated to be 5,000 square feet.
Question 10:
Contractor does not have adequate time to complete an accurate proposal by the current bid due date because of slow responses from Vendors and Subcontractors solicited for this proposal due to the upcoming holiday schedules. Additionally we are still missing drawings that have not been received and require time to perform the upcoming ship check, submit any new questions that arise from the ship check, allow the Government time to answer those questions and for us to incorporate into our proposal.
Contractor respectfully requests a bid extension from 09 Jan 2020 to 28 Jan 2020. Additionally, please extend due date for offers’ questions.
All of the above requested change is necessary to allow contractor time to review entire specification, references and drawings, submit requests to subcontractors, assemble and submit a proposal that will be clear, unambiguous and the best value to Government.
Answer 10:
The government will extend the offer period until 16 JAN 2020.
Question 11:
Section 7.6.9 Engineers Control Booth Door Replace The right hand side of the door, if viewing from the engineer room, presents significant problems for the removal and installation of a new door. The interior of the space houses the switch board. The switch board covers a portion of the door frame. During the ship check, the Chief Engineer advised that the switch board could not be removed. The exterior right hand side has a large automation electronics control cabinet that sits approximately 3” away from the door frame and the bulkhead. We were told this also could not be removed. Without suitable access to these areas, removal and reinstallation of the door frame will not be possible. Please advise how to achieve suitable access to this area?
Answer: 11:
No answer provided. Offerors must bid using available information.
Question 12:
7.4.6 Main and Knuckle Crane Preservation
Section 7.4.62 states “with the COR prior to start of preservation to designate all areas and markings to be painted and restored”. The Navy will need to advise what areas and markings are to be restored on these cranes at this time. Without knowing what the Navy wants painted, there is no way to provide an accurate price quote for this work.”
Answer 12:
For the main crane and the remotely operated vehicle crane, 100 sq feet on each crane are to be preserved, and on the knuckle crane a full preservation is called out. It is expected that a platform will be required to accomplish the work on any of the cranes. It is expected that some areas will need to be masked off on the knuckle crane. See PDF 191212-N-MV201-85 provided separately as an example of a label plate. This and other pictures show the amount of markings on each crane.
Question 13:
7.7.19 Procure New Propeller
Section 7.7.19.5 calls for the contractor to provide a “Qualified Inspector at the mfg facility as well as the installing activity to provide a signature that indicate a satisfactory inspection was completed.” Please advise what inspection criteria are required for the inspection?
Please advise what qualifications the inspector needs to have in order to sign off on this requirement?
Answer 13:
A cognizant material person is to conduct a visual inspection of the propeller to make sure that there are no defects at the time of inspection and compared to how it was received.
Question 14:
Section 7.7.19.5 requires a Propeller Certification form NAVSEA 9245/1 be completed. This form is required when a full NAVSEA level inspection is needed which utilizes cylindrical gages, edge gages, tip gages, fillet gages and involves preservation packaging. Please advise if the NAVSEA 9245/1 form and associated inspection is required for the purchase of this propeller?
Answer 14:
No, the 9245/1 form and inspection are not required for purchase.
Question 15:
Section 7.6.3 AC Plant Does the Navy have an existing plan for removing large equipment from the engine room?
Answer 15:
No. Removal of large equipment is at the direction of the bidder.
Question 16:
7.7.8 Port and STBD Traction Winches
Section 7.7.8.2 Asked the contractor to provide assistance of an on-site representative. Please provide a possible company name and contact that would support the required on-site representation.
Answer 16:
Eagles Hydraulics of Auburn, WA has support traction winch overhauls in the past. Fitz-Culver, the traction winch manufacturer may be able to direct the bidder to technical representatives in the area.
Question 17:
While on the ship check last week there was some confusion in regards to the actual scope for
CLIN 003-
ꞏ Please confirm that the expected work scope for CLIN 003 is only the difference in work scope between Rev 0 and Rev 1 of the SHIPALT specified
ꞏ Please confirm that YTT-11 has already had Rev 0 performed as stated in para 7.6.1
Answer 17:
YTT-11 has not had Rev 0 performed. REV 1 includes REV 0 work, but this SHIPALT has not been accomplished at all on the YTT-11, so the work is in its entirety. The work in REV 1 of the SHIPALT includes everything from REV 0 as well.
Question 18:
Please provide clarification in regards to the rating and part number of the A/C unit to be installed as part of the SHIPALT. There was a question during the ship check in regards to unit listed in the SHIPALT being a higher rated tonnage than the existing unit on the YTT-11 or the installed unit on the YTT-10 that has had the ALT completed.
Answer 18:
The rating of the A/C unit is 35 tons. The part number is 90YUNH9CSN4NK6F5U.
Question 19:
7.7.7.1 List of equipment overhaul work
In spec 7.7.7.1.2 there is mention of “Quantity (2 EA), Variable Frequency Drive, Cutler Hammer SPX400A1 Series”
What are the requirements for this work? We could not locate any information on these VFDs.
Can you provide?
Answer 19:
There is no planned work on the VFD.
Question 20:
7.7.7.2 Manuals used as reference for this overhaul
HRP Thruster Systems, HRP 3011 WM Instruction Manual, HRP Order 6641 – Not included in Attachment 4.
HRP Thruster Systems, HRP 3011 WM Operation Manual, HRP Order 6641 – Not included in Attachment 4.
Answer 20:
The correct HRP Thruster systems manual has been included in a CD-ROM mailed to all of the bidders.
Question 21:
7.6.5 Tank Level Indicators Replacement and Tank Preservation
7.6.4.3 Remove existing and install all new zinc anodes in accordance with drawing 6500840 and 6500841 for each tank.
These two DWGs do not provide anode information to accomplish the work in 7.6.4.3.
Please describe/provide Material List with type of anodes and locations for suitable pricing for this paragraph.
Answer 21:
The zincs are Commercial ZH-23 bolt on, total of 124 anodes as follows:
#1P=19 #1S=19 #2P=16 #2S=16 #3P=11 #3S=11 #4 TANK/Port=10 STBD=10 #5 TANK/Port=6 STBD=6
7.6.4.2.2.1.3 Accomplish a structural inspection of each tank for pitting, cracks, or unsatisfactory metal loss requiring repairs. Submit one legible copy, in hard copy or approved transferrable media, of a report listing results to the COR. (CDRL A007)
7.6.4.2.2.1.4 Crop out existing and replace with up to 100SF of new steel per the results of
7.6.4.2.2.1.1 and as directed by the COR for each tank.
Question 22:
Please clarify if the 100SF of steel is the total SF, or you require a price for 100SF for each of the 8 tanks.
Answer 22:
The total amount of steel plate to be replaced is 100SF split among the tanks.
Question 23:
7.6.8.1.1.4 Grease Interceptor Hood
YTT/0039D REV 01
HVAC (Reference (4)) is NAVSEA Dwg 512-8565478 “HVAC Mods Galley Upgrade” (This Dwg was not provided)
“Remove the existing grease interceptor hood (including temperature switch), disconnecting it from existing exhaust duct work. Install a new grease interceptor hood, including temperature switch, reconnecting to the exhaust duct work”.
Dwg 8774005 List of Material Remarks show Item No. 1 Grease Interceptor Hood Model NAB- 24 mentions REF 35 in “Remarks” and to see GEN NOTE No 22 & 23 (there is no note 23 or a REF 35 in this drawing) Answer 23:
On drawing 8774005 please add:
General Note 23 “Prior to Procurement of Item Number 1, After Removal of False Overhead and Bulkhead Confirm Location and Size of Duct Connection, Hood Wash Down Supply and Drain Piping to Existing Hood. For Procurement of New Hood Use Same Size and Location of Duct Connection, Hood Wash Down Supply and Drain Piping for New Hood.”
Answer continued:
Ref 35 is drawing 804-1749099, “Centrifugal Grease Interceptor and Associated Equipment for Commissary Equipment”. This drawing has been emailed to all bidders. Ref 35 is part of General Note 4
Question 24:
General Note 4 refers to REF 1on the DWG “501-6265454” (This Dwg was not provided). REFs 2-67 were to be provided in this DWG as well.
General Note 22 states Item Number 1 shall be similar or equal to Gaylord Industries. Hood shall be Model NAB-24 Length 36” with full end plate:34”. Before procurement of new hood see Note 23.
(There is no Note 23 in this DWG).
Answer 24:
See above answer.
Question 25:
General Note 19 states: The Part No. (P/N) in the List of Material shall be verified by the contractor prior to initiating procurement.
Inquiries to Gaylord find no information on Model NAB-24.
Answer 25:
The NAB hood is a standard Navy hood, you have to contract the Navy section at Gaylord, the POC is:
John Anderson National Account Coordinator Gaylord Industries Phone: 971‐223‐1238
Email: John.Anderson@GaylordVentilation.Com
Question 26:
Dwg 8774004 shows a Gaylord Hood Removal (Not in the List of Materials) SEE REF 4 (512-8774005) This DWG shows a Gaylord Hood for removal in REF 4 (512-8774005) Dwg 8774003 General Notes states: DISCONNECT EXISTING GRIDDLE HOOD Hot fresh water wash down piping for removal of hood and reconnect to new hood, SEE NOTE 23 on REF 4.
There is no NOTE 23 on REF 4 (512-8774005) Is the referenced Item 1 Grease Interceptor Hood Model NAB-24 actually a Gaylord Hood? Griddle Hood?
Answer 26:
It is a standard NAVY hood. Please see POC listed above.
Question 27:
Can you provide the DWGs mentioned above:
Dwg 512-8565478 Answer 27:
Dwg 512-8565478 is a YTT-10 drawing
Question 28:
Dwg 501-6265454 - REFs 2-67 were to be provided in this DWG Answer 28:
In the absence of references use best commercial practices per the SOW.
Question 29:
Can you assist in identifying Model NAB-24? Item 1 Grease Interceptor Hood, Gaylord Hood, Griddle Hood?
Answer 29:
See POC listed above.
Question 30:
Specification No: 7.4.6 Para. No:
Title: Main and Knuckle Crane Preservation Page No: 62 Estimator Submitting Question: JLS
Question: 1. Please provide clarification regarding the extent of surface preparation and application of coatings for each of the three (3) specified cranes (i.e.: 10% spot prep, 2 prime coats epoxy anti corrosive, one (1) full color coat).
2. Paragraph 7.4.6.3.2.1 directs the contractor to “protect only parts and components that are not to be prepped and painted”. Are we correct in understanding that the Navy does not want or require the shipyard to disassemble the cranes to accomplish specified coating repairs.
Answer 30:
1. Answer: Sow is specific to surface preparation and coating application to the 2 cranes called out.
2. Answer: From the SOW, “All areas such as hoses, valves, piston rods, glass, or other components not receiving paint shall be protected prior to accomplishing surface preparation/blasting and painting.” There are no SOW requirements to disassemble the crane.
Question 31:
Specification No: Solicitation N0025319Q0259, Para. No:
Title: Schedule of Prices Page No: Entire document Estimator Submitting Question: GHS
Question: The schedule of prices (price sheet) does not match the SOW for the project. To assure that bidder responses are based upon a common definition, could the Navy issue a revised price schedule that matches the items reflected in the SOW?
Answer 31:
The Government did not issue a price sheet. Contractor shall bid per the requirements set forth in the RFP by CLIN.
Question 32:
Specification No: 7.4.5 Para. No: 1 Title: Main and Forward Mast Preservation Page No: 20 Estimator Submitting Question: DG
Question: 1. Are we to assume that removal and reinstallation of a separate item (7.6.11
Navigational Lighting System) are not to be removed as part of item 7.4.5?
2. Could the Navy elaborate how they would like the contractor to address wire ways on the mast (remove and replace banding etc)?
Answer 32:
1. Answer: Means and method are for the contractor to decide.
2. Answer: Means and method are for the contractor to decide. If banding and clips are noted to need replaced at time of removal, contractor shall submit a conditions found report.
Question 33:
Specification No: 7.7.10 Para. No: 7.7.10.3 Title: Underwater Hull Inspection & Repairs Page No: 80 Estimator Submitting Question: AS/GHS
Question: Please define “100 SF of weld repair
1. Is this 100 SF of clad welding?
2. Is this repair of weld seams in a 100 SF zone?
3. Is this repair of 100 linear feet of weld seams?
4. Is this replacement of 100 SF of steel plate? If so, what thickness of hull plate?
5. Is this anticipated to all be in one location?
6. Is this anticipated to be in tanks?
Answer 33:
1-6: Answer: 100 SF of steel replacement. This would mean crop out steel, and weld replaced steel. Locations to be determined by results of UT requirements of SOW paragraph 7.7.10.2.
Question 34:
Section 7.6.2 Upgrade Fire Detection System
SAR034
Drawing 8629659A The cable listed in the List of Material (220’, Cable LSMCOS-7) is no longer on the QPL and unavailable. Can the Navy provide another suitable cable currently on the QPL to replace this material?
Answer 34:
Offerors must bid using available information Question 35:
Section 7.7.6 Bow Thruster Overhaul
7.7.6.4 Calls for the requirements of NAVSEA FY-19 CH3 Standard Item 009-17 for equipment listed in 7.7.6.1.1.
Our sub-contractors need more information about the motor to accurately quote the required work. Please provide more detail about the motor. A picture of the motor name plate or the same information of the name plate listed out.
Answer 35:
Offerors must bid using available information
Question 36:
(1) The following documents are referenced in the YTT-11 statement of work but were not provided in the government furnished CD. “Spec” refers to the paragraph in the SOW where the document is mentioned. Please provide missing documents.
Document ID Document Name CHG Spec
Document ID Document Name CHG Spec
9090-310D DTD Feb
Ship Alteration Accomplished by Alteration Teams
HRP Order 6641 HRP Thruster Systems, HRP 3011 WM Instruction Manual (manufacturer owns)
- 7.7.7.2.1
HT600TD Marine Maneuvering & Prop Sys Op & Main Manual 7.7.6.2.1
HRP Thruster System HRP 3011 WM Instruction Manual
7.7.7.2.1
HRP Thruster System HRP 3011 WM Operation Manual
7.7.7.2.2
NavSea 404645 Propulsion Shaft Seal Cooling ? 7.7.2.1.3.1
John Crane Type EJ Shaft Seal ? 7.7.2.1.3.5
085-5284790 Docking Drawing F provided;
Specification uses “E”
Answer 36:
HT600TD and HRP WM3011 were provided on CD previously and also via DoD Safe. 085-5284790E and 085- 5284790F only difference is the distribution statement. Keyport has not located a copy of John Crane Type EJ Shaft Seal Copy. The referenced files were sent to each bidder using DoD Safe.
Question 37:
BASE ITEMS appear to run from ITEM 0001 through ITEM 0030 and the OPTION ITEMS begin at 0031 through 0058.
ITEM NO 0038 in the SUPPLIES/SERVICES section of STANDARD FORM 1449 is listed in between the OPTION ITEMS. This appears to be a BASE ITEM
7.7.3 Propeller; Remove/Install New Propeller
Question:
Please confirm this is not an OPTION ITEM Answer 37:
This paragraph and associated CLIN are being changed to be an OPTION item.
Question 38:
Item 7.6.8 Galley/Mess Upgrade
SAR54
Drawing 856709a, List of Materials Item 1 Galley Hood states “See Gen Note No 22 & 23”.
General Note 22 states …”Before procurement of new hood see general note 23”. There is no note 23 on the drawing. Please advise what Note 23 states.
Answer 38:
General Note 23 “Prior to Procurement of Item Number 1, After Removal of False Overhead and Bulkhead Confirm Location and Size of Duct Connection, Hood Wash Down Supply and Drain Piping to Existing Hood. For Procurement of New Hood Use Same Size and Location of Duct Connection, Hood Wash Down Supply and Drain Piping for New Hood.”
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 09-Jan-2020 12:00 PM to 16-Jan-2020 12:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0038
The option status has changed from No Status to Option.
CLIN 0052
The CLIN description has changed from OPTIONAL Growth Work Labor (460 units) to OPTIONAL Growth Work Labor (600 units).
The CLIN extended description has changed from:
OFFEROR IS TO PRICE 1 UNIT OF 8 HOURS LABOR. (EXAMPLE: $XX DOLLARS/PER HOUR X 8
HOURS = 1 UNIT) MULTIPLY 1 UNIT X 460 UNITS TO CALCULATE NET AMT.
To:
OFFEROR IS TO PRICE 1 UNIT OF 8 HOURS LABOR. (EXAMPLE: $XX DOLLARS/PER HOUR X 8
HOURS = 1 UNIT) MULTIPLY 1 UNIT X 600 UNITS TO CALCULATE NET AMT.
CLIN 0053
The CLIN extended description has changed from:
Provide additional material as required by growth work. $100,000 SHALL BE ENTERED AS THE NET AMT.
THIS IS A NOT TO EXCEED AMOUNT.
To:
Provide additional material as required by growth work. $125,000 SHALL BE ENTERED AS THE NET AMT.
THIS IS A NOT TO EXCEED AMOUNT.
(End of Summary of Changes)