SPECIFICATION SHEET
1. Antenna Control Unit (ACU) and Power Drive Unit (PDU)
1.1 ACU/PDU
· Antenna Control Unit (ACU)(Qty 2), Rack Mountable with Color LCD Touch Screen Display.
· Extensive Mode Capability Including, Monopulse, Inclined Orbit Tracking (Optrack), Steptrack, Program track, Intelsat, Table Track, NORAD, Star Track, Acquisition and Scan Modes, Position Designate, AZ/EL X/ Y and Geo Modes.
· ACU-PDU Ethernet Interface
· Variable Speed Brushless DC Power Drive Unit (PDU)
· Single Door, Indoor Cabinet
· Time Synchronization, NTP, IRIG-B
· Portable Maintenance Unit (PMU) with Display, and J-Box
· Manual Control Unit (MCU) with cable
· Tracking Receiver, S-Band Input (2.0-2.8 GHz)
· X/Y Position Encoders, 25 bit resolution, 10 arc-sec accuracy, with couplings
· Servo System Cabling and Connectors for up to 60 ft Antenna with up to 100’ PDU/ACU Separation.
· Documentation – One operations and maintenance manual, one e-copy
1.2 Monopulse Tracking System
The contractor shall:
a) Provide and install a Monopulse RF Plate with Digital Phase Shifter and Integral S-Band BDC (2.0-2.8 GHz)
1.3 Installation, Testing and System Checkout
The contractor shall:
1. The contractor shall ship, install, test, and test ACU, PDU, and auto track system to ensure proper antenna control operations, pointing angles, and auto track functionality. ACU installation will include programming current antenna limits and pointing table into the ACU.
1. Acceptance and Testing: Contractor shall conduct a thorough acceptance test of the newly installed ACU, PDU, and monopulse auto track system. The test shall, at a minimum: verify the ACU can accept program track data, verify the antenna is properly pointing, and verify that the monopulse auto track system is automatically tracking proper targets. Contractor shall deliver an acceptance test report 10 working days after the completion of the testing. The acceptance test report shall be delivered electronically to the government in a MS Word file format.
1.4 Training
The contractor shall:
a) Provide one day of classroom training on the ACU, PDU, and monopulse auto track system. Provide all training materials. Training materials will be delivered in hard copy and MS Word electronic copy. Classroom training shall be provided to three NAVSOC personnel.
b) Provide one day of hands on ACU, PDU, and monopulse auto track system operations and maintenance training. Hands on training shall be provided to three NAVSOC personnel.
1.5 Warranty
Commercial Warranty
Price to included removal and installation of ACU, PDU, and auto tracking system. Government will provide a man lift and will dispose of replaced equipment.
Government hours of operation are Monday-Friday 0800-1700 hours.