1.02_Pacific_Blitz_19_SOW_REV2.pdf
PDF 98 KB Posted
- Attached to
- RC000619RC001SD Potable Water Services
- Solicitation number
- N0024419Q0113
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
IN SUPPORT OF ACB-1 PACIFIC BLITZ 2019
POTABLE WATER SERVICES
1. GENERAL: This is a non-personnel services contract for ACB-1. The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, other items and non-personal services necessary to provide services for ACB-1 as defined in this Statement of Work (SOW) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.
1.2. Background: Potable Water services are necessary for ACB-1 to operate Field Galley, Laundry, and Showers in support of the Tent Camp build for PACIFIC BLITZ 2019. For safe preparation of food and sanitation ACB-1 needs to Potable Water delivered to a field environment in support of necessary camp functions.
1.3. Objectives: Successfully provide items as descripted for the timeline prescribed in this SOW.
2. SCOPE OF WORK:
2.1. General Scope: The Contractor shall furnish all the necessary management, materials, equipment, and transportation necessary to provide the Potable Water services required, in accordance with this SOW. The water will be used for Food Service, Drinking water, Showers, Laundry and Shave tent services.
2.2. Specific Tasks: The Contractor shall provide a Potable Water tank truck with driver and pumping capability from the water tank and not by utilization of a generator. Delivery of 36,000 gallons of water daily will be required.
In addition, the truck will need hose with sufficient length to reach and interface with twelve 3000 gal gravity fed onion bladders at several different locations. The bladders will not be moved to a central location for filling.
Bladders can be filled either direct from hose to bladder or utilizing a 2” quick disconnect Camlock fittings in connection from the bladder. Timely delivery is required to make sure that there is no outage of camp functions.
Source of water will be provided by ACB-1 and certified potable by Naval Medical Personnel.
2.2.1. Basic Services. The Contractor shall provide services in accordance with this SOW. The Contractor must provide detailed contact information to the unit so they can be reached whenever they are needed, to include; name, cell phone number, land line number, email, and any other pertinent contact information. Scheduling for delivery will be completed on an as needed basis (minimum twice daily delivery). This service will be dedicated to the U.S Government (ACB-1).
2.2.2. Services provided will meet at a minimum the requirements listed below:
CLIN: #0001 (ACB-1)
Pump capable truck and Driver/Operator Water Hose – 100-200 feet
2.3. Place of Performance: AFA 15 near the Las Pulgas Gate Camp Pendleton Oceanside, CA 92058
2.4. Period of Performance: The period of performance is from 17 March 2019 through 10 April 2019.
3. POINTS OF CONTACTS:
DEFINITIONS:
Potable Water: Safe Drinking Water
Bladder: 3000 gal onion bladder. Gravity fed through top opening
Water Buffalo: Navy Standard mobile water container
File details come from the government source that posted it.