PERFORMANCE WORK STATEMENT
NAVAL CONSTRUCTION GROUP ONE, NAVAL AIR BASE CHINA LAKE
Cement Chipping from Ready-mix Concrete Trucks
1.0 Scope. This is a performance based service, completion type acquisition to provide services to remove hardened concrete located within rotating drums of two ready-mix concrete trucks.
1.1 Background. The Naval Construction Group located at Naval Air Weapons Station China Lake, California has a requirement to clean the inside of two ready-mix concrete trucks, which have hardened over time with a combined mass of an estimated 5 cubic yards of concrete.
2.0 Applicable. Contractor’s own confined space certification per OSHA and 29 CFR 1910.146.
3.0 Performance Requirements
3.1 Cement Chipping from Ready-mix Concrete Trucks: the following steps are projected to be required in order to return the ready-mix concrete truck’s drum into working order. The contractor is not permitted to perform repairs beyond removal of concrete.
3.1.1 Brief personnel on hazards in performance of work
3.1.2 Prepare work area for safety, which could include, but not limited to distribution of safety equipment to personnel, opening of lower access port for cement drum, drum ventilation, and connection of exhaust blower.
3.1.3 Set-up of tools required for cement chipping.
3.1.4 Commencement of cement chipping.
3.1.5 Contractor is responsible for cleaning their own equipment/ materials. The US Navy will provide disposal space for the chipped concrete within work area.
3.1.6 Test and inspection of completed work.
3.2 Acceptance Testing
3.2.1 Test Description. Visual inspection will be made by onsite equipment manager.
4.0 Travel. None.
5.0. Government Furnished Property. None
6.0 Security. The work to be performed is Unclassified.
7.0 Place of Performance
1 Admin Circle, Building 465 M.S. 1334, China Lake, CA 93555
9. 0 Inspection and Acceptance. Visual inspection will be made by onsite equipment manager.
10. Period of Performance: Award Date through 30 Days Thereafter.
11. Technical Point of Contacts and COR:
LS1 (AW) Gregory Lankford Supply Department: 760-428-4109