N0018923R00300001.pdf
PDF 419 KB Posted
- Solicitation number
- N0018923R0030
About this file
This solicitation is for Expeditionary Equipment Readiness Support Services for the Maritime Expeditionary Security Force. The services required include organizational and intermediate level maintenance for civil engineering support equipment, boats, material handling equipment, and other support equipment. The contractor shall perform repairs, assessments, logistic support, and technical assistance. The period of performance is one base year with four one-year options. Pricing includes fixed estimated amounts for travel and materials by period. The location of performance is in Virginia Beach and San Diego. The incumbent is HII Fleet Support Group, LLC under Seaport-e contract N00178-11-D-6433. The Naval Supply Systems Command Fleet Logistics Center Norfolk intends to award this as a firm-fixed-price contract in accordance with FAR Part 12 and 15.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past Performance Information Form.pdf | ||
| N0018923R0030.pdf | ||
| Contract Discrepancy Report.pdf | ||
| DD_254 DRAFT.pdf | ||
| Past Performance Report Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4365A23RC001AD
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment 0001 is to respond to questions received and to update CLIN types, the PWS and 52.212-1 Addendum as a result of questions and responses.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 37
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0018923R0030
X 9B. DATED (SEE ITEM 11)
05-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Jun-2023
CODE
NAVSUP FLC NORFOLK CONTRACTING
NORFOLK OFFICE
ATTN: S. BROWN
1968 GILBERT STREET, SUITE 600
NORFOLK VA 23511-3392
N00189 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0018923R0030
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The contract type has changed from FFP to COST.
The pricing detail quantity 1.00 has been deleted.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Lot
MESF EERS TRAVEL
COST
Base Year Travel in accordance with the PWS. NTE $300,000 FOB: Destination
PSC CD: J020
ESTIMATED COST
CLIN 0003
0003 Lot
MESF EERS MATERIAL
COST
Base Year Material in accordance with the PWS. NTE $40,000
ESTIMATED COST
CLIN 1002
1002 Lot
OPTION MESF EERS TRAVEL
COST
Option Year 1 Travel in accordance with the PWS. NTE $300,000
NET AMT
CLIN 1003
1003 Lot
OPTION MESF EERS MATERIAL
COST
Option Year 1 Material in accordance with the PWS. NTE $40,000
CLIN 2002
2002 Lot
OPTION MESF EERS TRAVEL
COST
Option Year 2 Travel in accordance with the PWS. NTE $300,000
CLIN 2003
2003 Lot
OPTION MESF EERS MATERIAL
COST
Option Year 2 Material in accordance with the PWS. NTE $40,000
CLIN 3002
3002 Lot
OPTION MESF EERS TRAVEL
COST
Option Year 3 Travel in accordance with the PWS. NTE $300,000
CLIN 3003
3003 Lot
OPTION MESF EERS MATERIAL
COST
Option Year 3 Material in accordance with the PWS. NTE $40,000
CLIN 4002
4002 Lot
OPTION MESF EERS TRAVEL
COST
Option Year 4 Travel in accordance with the PWS. NTE $300,000
CLIN 4003
4003 Lot
OPTION MESF EERS MATERIAL
COST
Option Year 4 Material in accordance with the PWS. NTE $40,000
CLIN 5002
5002 Lot
OPTION MESF EERS TRAVEL
COST
FAR 52.217-8 Travel in accordance with the PWS. NTE $150,000
CLIN 5003
5003 Lot
OPTION MESF EERS MATERIAL
COST
FAR 52.217-8 Material in accordance with the PWS. NTE $20,000
The following have been added by full text:
QUESTIONS & RESPONSES
1. Question: I am looking to confirm if there is an incumbent, or if this is a new requirement? If there is an incumbent, can you please provide the contractor name and contract number?
Response: This is a follow-on requirement currently being satisfied under Firm Fixed Price Task Order N0018918F3028 under Seaport-e contract N00178-11-D-6433 awarded to HII Fleet Support Group, LLC.
2. Question: SOW Section 4.4 states: Travel expenses include airfare, per diem, rental car, local travel, and miscellaneous expenses as authorized by the JTR. Costs for transportation may be based upon mileage rates, actual costs incurred, or a combination thereof, provided the method used results in a reasonable charge. Further SOW Section 4.4.3 states: 3 Travel costs will be considered reasonable and allowable only to the extent that they do not exceed daily, the maximum per diem rates in effect at the time of the travel.
The Joint Travel Regulations (JTR), while not applicable to contractors shall provide the basis for the determination as to reasonable and allowable. The verbiage in these SOW sections as well as reporting requirements in SOW Section 7.17.2 would indicate that travel CLINS 0002, 1002, 2002, 3002 and 4002 would be cost reimbursable not FFP as the current CLINS are labeled. Can the Government confirm that CLINS 0002,1002,2002,3002 and 4002 are cost reimbursable?
Response: CLINS 0002,1002,2002,3002 and 4002 are cost reimbursable and will be labeled as such.
3. Question: SOW Section 7.17 states the contractor will deliver: “Reports shall be provided in Excel
Spreadsheet for maintenance history, Material purchased using ODC funds”. This indicates that CLINS 0003,1003,2003,3003 and 4003 would be cost reimbursable CLINS. Can the Government confirm that CLINS 0003,1003,2003,3003 and 4003 are cost reimbursable?
Response: CLINS 0003,1003,2003,3003 and 4003 are cost reimbursable and will be labeled as such.
4. Question: page 19, section 7.11.1 states “Overtime: Overtime may be required to perform tasks outlined within Paragraphs 4.0 through 4.5 of this PWS.” However, the estimated overtime requirements (OT hours) are not provided. Per the previous Solicitation N00189-18-R-3021 for the current contract, the estimated level of effort for regular and overtime hours were provided in the Pricing Spreadsheet (Attachment 4-Pricing Spreadsheet).
Will the Government please provide the estimated overtime hours required to support tasks outlined in this solicitation to allow for pricing consistency amongst all Offerors?
Response: It is estimated that every labor category will work 240 hours of overtime per coast per year except the logisticians. They are estimated at 0 hours.
5. Question: Paragraph 4.6 Quality Management (page 8), requires the contractor to provide documentation of its Quality Management System (QMS) (The contractor shall establish, document, implement, and maintain a fully functional Quality Management System in accordance with NAVSEA Standard Item 009- 04). RFP Section I. GENERAL (page 102), limits Factor III - Technical Approach to 30 pages.
Will the government accept QMS documentation as an appendix to Factor III so it doesn’t affect Technical Approach page count?
Response: The PWS (section 4.6) has been revised to require this documentation to be provided to the COR within ten (10) days after contract award.
6. Question: Background: “Non-Price” Proposal Volume I is referenced throughout the Evaluation Factors (pages 48-49) and again in Section I, (bottom of page 102). However, page 101 designates Volume I as “Technical Proposal.”
For compliance, should offeror use “Non-Price Proposal” or “Technical Proposal” as the title for Volume I?
Response: Volume I can be referred to as Non-Price Proposal. Verbiage revised to be consistent.
7. Question: In reference to Addendum 52.212-1, Instructions to Offerors – Commercial Items, I. General (2): Can the Government please clarify whether the cover page and table of contents are excluded from the overall page count?
Response: Additional instructions have been added to “Proposal Page Limitations” in the Addendum to 52.212-1.
8. Question: In reference to Addendum 52.212-1, Instructions to Offerors – Commercial Items, I. General
(4): Will the Government allow an acronym list? If so, respectfully request that it is excluded from the page count.
Response: Page counts have been increased across all factors.
9. Question: We noticed that the status on this opportunity in SAM was changed on Saturday, 17 Jun to “Presolicitation.” Please confirm that this solicitation is still actively seeking bidders with a due-date of 7 Jun. Thank you.
Response: 17 June is the Presolicitation’s Inactive date (15 days after response date). The Solicitation’s offers due date is still showing as, “Original Date Offers Due: Jul 07, 2023 10:00 am
EDT.”
The following have been modified:
ADDENDUM TO 52.212-1
ADDENDUM TO FAR PROVISION 52.212-1 ENTITLED “INSTRUCTIONS TO OFFERORS –
COMMERCIAL ITEMS”
The Government intends to award a Firm-Fixed-Price (FFP) contract as a result of this solicitation in accordance with FAR Part 15. Award will be made to that offeror whose proposal is most advantageous to the Government under the selection criteria set forth in this solicitation. The Government intends to evaluate proposals and award a contract based on initial proposals. Therefore, the offeror's initial proposal should contain the offeror's best terms from a non-price and price standpoint. However, the Government may contact any or all offerors with questions concerning their responses. The Government reserves the right to award a contract to other than the lowest priced offeror; award a contract without discussions; or award a contract after discussions, whichever is in the best interest of the Government.
Offerors are required to submit their proposals in three (3) separate volumes as follows:
Volume I: Non-Price Proposal Factor I – Facilities Clearance Factor II – Small Business Participation Plan Factor III – Technical Approach o Sub-factor I: Staffing Approach o Sub-factor II: Performance and Management Approach
Factor IV – Past Performance Volume II: Price Proposal
Factor V – Price Proposal Volume III: Small Business Subcontracting Plan (Not an Evaluation Factor)
IMPORTANT NOTES:
(1) Offerors shall respond to all requirements of the solicitation document. Offerors are cautioned not to alter the solicitation. Hand-carried proposals are not authorized and will not be accepted. Each page of each copy shall be affixed with the following legend:
Source Selection Information
See FAR 2.101 and 3.104
(2) In the event any person who is not a bona fide employee of the offeror participated in the creation, formulation, or writing of any portion of the proposal, a certificate to this effect shall be included in the proposal which shall be signed by an officer of the offeror. Such certificate shall identify the name of the person who is not a bona fide employee, that person’s employment capacity, the name of the person’s firm, the relationship of that firm to the offeror, and the portion of the proposal in which the person participated.
(3) In order to ensure that all questions submitted by potential offerors are answered prior to the solicitation closing date, all questions concerning the solicitation should be submitted via e-mail to Sherell Brown at sherell.g.brown.civ@us.navy.mil and Morgan Olszak at morgan.e.olszak.civ@us.navy.mil NO LATER THAN 10:00 AM, Eastern Daylight Time (EDT), on 21 June 2023. The Government reserves the right not to respond to any questions received concerning this solicitation after the questions receipt date above. Accordingly, offerors are encouraged to carefully review all solicitation requirements and submit questions to the Government early in the proposal timeframe.
(4) Proposals shall be submitted via email to Sherell Brown at sherell.g.brown.civ@us.navy.mil and Morgan Olszak at morgan.e.olszak.civ@us.navy.mil in the volumes and format as identified in this section; proposals that do not comply may be considered unacceptable and may render the proposal ineligible for award. Proposals are due no later than the closing date and time identified on the front page of the solicitation. Offerors should include the following information in the Subject Line of their electronic submission:
Proposal - N0018923R0030 – (Name of Offeror) – (“Prime” or “Sub”) – Email (#) of (#)]]
(5) Offerors are strongly encouraged to confirm their proposal was received PRIOR to the closing date and time. It is the responsibility of the offerors to ensure that the Contracting Office has received their entire proposal, with all attachments, PRIOR to the solicitation closing date and time. Only the documents received prior to the solicitation closing date and time will be evaluated.
I. GENERAL
REQUIREMENTS FOR PROPOSAL CONTENT:
(1) Introduction and Purpose: This section specifies the format that offerors shall use in this request for proposals
(RFP). The intent is not to restrict offerors in the manner in which they will perform the work, but rather to ensure a certain degree of uniformity in the format of the responses for evaluation purposes.
(2) Each volume should contain the following items in addition to the other information required by this solicitation:
The offer should contain the following items in addition to other information required by this solicitation: The cover page should indicate the following:
Title of the proposal Volume Number (I, II or III) Proposal Category (Factor/Sub-factor) Request for Proposal Number Name and Address of Offeror, CAGE Code, SAM Unique Entity ID, and applicable Tax I.D. Number
(TIN)
Point of Contact name, telephone number, and email address Proposal valid for 180 days after solicitation closing
Table of Contents: The table of contents should provide sufficient detail as to allow the important elements to be easily located.
(3) Requirements for Style: Each offeror shall submit a proposal that clearly and concisely describes and defines the contractor’s response to the requirements contained in the RFP. Unnecessary elaboration or other presentations beyond that sufficient to present a complete and effective proposal are not desired and may be construed as an indication of the offeror’s lack of understanding of cost consciousness. The proposal shall contain all the pertinent information in sufficient detail in the one area of the proposal where it contributes most critically to the discussion of the same information. When necessary, the offeror shall refer to the initial discussion and identify its location within the submitted proposal.
(4) Proposal Page Limitations: : Submissions are page limited to the maximum number of pages as defined below.
These page limitations are inclusive of the executive summary and any charts, diagrams, and/or other graphics.
Graphics (including tables) in the proposal may use an alternative font with 8 point size type or larger. Each “page” is defined as one sheet, 8 ½ “ x 11”, with at least one inch margins on all sides, using a font with a point size of 10 or greater (e.g., "Times New Roman" style with 10 point font). Lines shall, at a minimum, be single-spaced in Microsoft Word with Microsoft Word Normal character spacing. Pages shall be consecutively numbered. Multiple pages, double pages, two-sided pages, or foldouts will count as an equivalent number of 8 ½" x 11" pages. Offerors are permitted to submit no more than one page for each of the following, which will not be included in the page count: a cover sheet, list of tables, list of figures, tabs, and dividers. Tables of contents and any compliance matrices may exceed one page, which will not be included in the page count.
Title Page Limit* Factor I - Facilities Clearance No Limit Factor II – Small Business Participation Plan No Limit Factor III - Technical Approach 32 Pages Factor IV - Past Performance 14 Pages Factor V – Price No Limit Small Business Subcontracting Plan (Not an Evaluation Factor) No Limit
Pages submitted in excess of the page limitations described above will not be evaluated.
The Facilities Clearance is not page-limited; however, the Facilities Clearance is to be strictly limited to a copy of the verification.
* Page limits represent the maximum pages the Government will evaluate and are not construed as de facto standards for the amount of material expected in the proposal.
Volume I: Non-Price Proposal
Factor I – Facilities Clearance
The Offeror shall provide proof/verification that it possesses a current Secret Facility clearance at time of proposal submission. The proof/verification shall be in the form of Defense Counterintelligence and Security Agency (DCSA) verification certifying it possesses a current Secret Facility Clearance. The verification shall include the following: Cage Code, Facility Name, Physical Location, Facility Clearance (FCL) Status/Level, Status Date/Issue Date, Safeguarding Level, Authorized Access To, FCL Limitation, Facility Security Officer, Facility Security Officer Phone Number, DCSA Field Office, and DCSA Field Office Phone Number. The verification must be dated within 30 days of the closing of the solicitation.
***Include as an attachment to the solicitation. There is no page limitation.***
Factor II: Small Business Participation Plan
Offerors (large and small businesses) SHALL provide a Small Business Participation Plan. Small Business Participation Plans shall address the following:
Identification of small business concerns the prime intends to use in support of this effort;
The level of commitment the prime has to use small business concerns (for example, enforceable commitments will be weighted more heavily than non-enforceable ones);
A description of the complexity and variety of the work small firms are to perform;
Vendors past performance of the offerors in complying with requirements of the clauses at FAR 52.219-8, Utilization of Small Business Concerns, and 52.219-9, Small Business Subcontracting Plan; and The extent of participation of small business concerns in terms of the value of the total acquisition.
***The Small Business Participation Plan submission is not page limited.***
Factor III – Technical Approach:
Sub-Factor I – Staffing Approach
The offeror shall provide a staffing approach that demonstrates the offeror’s ability to provide the required support services and hire and retain the appropriate mix \ of personnel resources with the skill set levels necessary as identified in the PWS. Specifically, offerors shall address the following:
The offerors shall detail a proposed methodology for recruitment of personnel meeting the position-dependent experience, certifications, and qualifications delineated in Section 5.0 of the PWS;
an approach to ensure personnel qualifications remain current;
an approach to personnel performance monitoring, skill maintenance, and skill improvement; and a meaningful and proactive retention strategy. The offeror is encouraged to provide historical data to substantiate achievements in past recruiting efforts and sustained retention of employees/low employee turnover rates.
PWS Section 5.0 provides a Government estimated level of effort (LOE) for informational purposes only.
Offerors shall provide detailed information on the proposed LOE and/or labor mix to include at a minimum identification of labor categories, number of personnel per labor category, whether they will be on-site or off-site, and number of hours. Offerors shall also provide detailed information to support the proposed LOE/labor mix as a part of the staffing approach.
Sub-Factor II –Performance and Management Approach
The offeror shall demonstrate an understanding of, familiarity with, and ability to perform the specific technical requirements and tasks in PWS Section 4.0, to establish to the government that the offeror is capable of fully providing these services at the level of quality required. The offeror’s approach shall provide a plan that clearly describes the management controls, techniques, and procedures that will be used to ensure required work is performed in a timely, responsive, professional, and efficient manner and clearly detail how this effort will be managed within the offeror’s corporate organizational structure.
***The Technical submission is limited to 32 pages***
Factor IV – Past Performance
To demonstrate its past performance, the offeror shall identify up to three (3) of its most relevant contracts performed within five (5) years of the solicitation issuance date. Those contracts must also reflect one year of completed performance by the closing date of the solicitation. Offerors shall provide a detailed explanation demonstrating the relevance of the contracts to the requirements of the solicitation.
For purposes of this solicitation, a contract is defined as a single contract or a single task order placed under an ID/IQ contract, a Blanket Purchase Agreement (BPA), or a Federal Supply Schedule. Offerors shall not submit the IDIQ contract, FSS contract, or BPA itself as a reference. Offerors may submit a combination of no more than three (3) delivery orders (DOs), task orders (TOs), technical direction letters (TDLs), and/or technical area tasks (TATs) placed under an ID/IQ or BPA as one of the three examples of past performance. Such a combination must also meet the requirements stated above: each individual example in the combination must have been performed within five (5) years of the solicitation issuance date and demonstrate at least one (1) year of completed performance by the closing date of the solicitation. If a combination of DOs, TOs, TDLs and/or TATs are used as a past performance example, the offeror shall state the specific experience claimed, period of performance, and dollar value of each. A Past Performance example that does not provide the level of detail required may not be evaluated. No more than one combination of DOs, TOs, TDLs and or TATs is permitted in the past performance submittal.
If a proposed subcontractor’s past performance is provided as part of the three (3) of its most relevant contracts or efforts, the percentage and type of work to be done by the subcontractor on the solicitation requirement must be stated. The offeror’s submittal shall also detail clearly the aspects of the work in the solicitation that the subcontractor is proposed to perform. A Past Performance example which does not detail clearly the aspects of the work in the solicitation that the subcontractor is proposed to perform may not be evaluated.
If the prime offeror or intended subcontractor/partner submits a past performance example in which it served as a subcontractor, the prime/sub/partner shall detail clearly the work that it performed and the magnitude (dollar value) of that subcontracted work only. A Past Performance example that does not differentiate between the overall contract effort and the subcontractor effort may not be evaluated.
The past performance of subcontractors who will be performing major or critical aspects of the solicitation will be considered as highly as a prime contractor’s past performance.
Failure of offerors to provide the required information and level of specificity may result in the contract reference not being evaluated.
With respect to joint ventures, the procuring activity will consider work done individually by each member of the joint venture as well as any work done by the joint venture itself previously. Joint venture references must meet the temporal requirements described in ADDENDUM TO FAR PROVISION 52.212-1 (within five years and a year of completed performance). Additionally, if a joint venture member submits a past performance reference, the joint venture member shall detail clearly the work that it performed in that effort and the magnitude (dollar value) of that work. A reference that does not differentiate between the overall contract effort and the joint venture member’s effort for that reference may not be evaluated. The past performance of a joint venture member who will be performing major or critical aspects of the solicitation will be considered as highly as the joint venture’s past performance.
The references will be evaluated in the aggregate in order to allow offerors who may not have the entire scope and magnitude of the requirement under one (1) individual contract to still be evaluated for quality if past performance with the full scope and magnitude of the requirement can be demonstrated within the allotted number of references as described above.
The offeror shall complete a “Past Performance Information Form” for each reference submitted. The form is an attachment to the solicitation.
In addition to the information requested above, offerors shall contact their past performance references and request that each reference complete the Past Performance Report Form and e-mail the completed survey form directly to Sherell Brown at sherell.g.brown.civ@us.navy.mil and Morgan Olszak at morgan.e.olszak.civ@us.navy.mil by the DUE DATE OF THIS SOLICITATION. The Government reserves the right to consider past performance report forms received after the due date of the solicitation and to contact references for verification or additional information.
***The Past Performance submission is limited to 14 pages.***
Volume II – Factor V – Price:
In addition to the items required in the General Section above, Volume II shall include the following:
- Completed solicitation documents to include signed copies of all amendments, if applicable.
- Unless completed in SAM, “Representations, Certifications and Other Statements of Offerors” completed by the offeror.
- Complete and detailed price breakdown with all supporting documentation.
Offerors shall insert the Government estimated travel and material plug numbers provided in the chart below in their proposed price, in addition to any applicable General and Administrative (G&A) and/or Overhead (OH) rate in accordance with FAR Part 31 in their accounting system. Only G&A and/or OH indirect costs are allowable if an offeror’s accounting system automatically applies it, no profit or fee is allowed.
Period of Performance Travel Material Base Year $300,000.00 $40,000.00 Option 1 $300,000.00 $40,000.00 Option 2 $300,000.00 $40,000.00 Option 3 $300,000.00 $40,000.00 Option 4 $300,000.00 $40,000.00
FAR 52.217-8 $150,000.00 $20,000.00
NOTE: If no G&A and/or OH are proposed, it will be determined that the offeror does not intend to apply any applicable indirect cost to any travel required.
All price and price supporting information shall be contained in the price proposal. No price information shall be included in any other Volume including cover letters. The offeror is responsible for submitting sufficient information to enable the Government to fully evaluate its price proposal.
***The price submission is not page limited, but is strictly limited to price information.***
Volume III – Small Business Subcontracting Plan:
Small Business Subcontracting Plan (Other than Small Businesses ONLY; Not an Evaluation Factor)
Large business offerors SHALL also submit a Subcontracting Plan in accordance with FAR 19.704, Subcontracting Plan Requirements. Offerors are permitted to submit a master subcontracting plan so long as it is created in accordance with FAR 19.701 and FAR 19.704(b). Subcontracting Plans are not required from small business offerors.
It is the goal of this solicitation that prime contractors subcontract with small businesses to the maximum extent practicable. For other-than-small (large) prime contractors, the Small Business Subcontracting Plan goals shall be expressed in terms of whole dollars and percentages based on total planned subcontracting dollars. Of the total planned subcontracting dollars, the Small Business Subcontracting Plan shall include goals for Small Businesses, Small Disadvantaged Businesses, Woman-Owned Small Businesses, HubZone Small Businesses, Veteran Owned Small Businesses and Service-Disabled Veteran-Owned Small Business. The Government will consider prior achievement of small business subcontracting plan goals as well as the proposed dollar values and percentages related to this solicitation. Small businesses are not required to submit a subcontracting plan, but are required to submit a small business participation plan.
NOTE: The North American Industry Classification (NAICS) code applicable to the requirements contained within this solicitation is 811310. Therefore, companies proposing under this solicitation as a small business concern must have had an average annual receipt over their three (3) previous fiscal years that was less than $12,500,000.
The completion and submission of the above items will constitute an offer (proposal) and will indicate the offeror’s unconditional assent to the terms and conditions of this RFP and any attachments hereto. Alternate proposals are not authorized. Objections to any terms and conditions of the RFP will constitute a deficiency (see FAR 15.001), which may make the offer unacceptable. An offeror may correct a deficiency only through discussions (see FAR 15.306(d) and 15.307).
(End of FAR provision 52.212-1 Addendum)
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT
MARITIME EXPEDITIONARY SECURITY FORCE (MESF)
EXPEDITIONARY EQUIPMENT READINESS SUPPORT CONTRACT
1.0 Background
The Chief of Naval Operations established the Navy Expeditionary Combat Command (NECC) on 1 October 2005.
NECC formally stood up on 13 January 2006, as a Functional Commander for shore-based expeditionary type forces within the Navy. NECC serves as the single functional command for the Navy’s expeditionary forces and as central management for the readiness, resources, staffing, training and equipping of those forces. They consolidate, align and integrate diverse expeditionary practices, procedures, requirements and logistics in the battle space. As a command element and force provider for integrated maritime expeditionary missions, to include waterborne and shore anti-terrorism, force protection, theatre security cooperation and engagement and humanitarian assistance/disaster relief contingencies, upon request, NECC also supplements Coast Guard homeland security requirements while training and equipping forces to support mission requirements.
To accomplish this mission, NECC requires a dedicated and professional security force capable of meeting today’s requirements. It must be flexible enough to adapt to new missions in support of Major Combat Operations (MCO), Maritime Security Operations (MSO), and Maritime Homeland Security (MHS)/Maritime Homeland Defense
(MHD).
Maritime Expeditionary Security Force (MESF) which is comprised of two Group Commanders, MESG-ONE and MESG-TWO, is a major cornerstone of NECC’s efforts to field a force capable of executing all maritime security operations in the inland, coastal and near-shore environments.
MESG-1 is located in Imperial Beach, California. This is the headquarters for the unit and where some of the Expeditionary Equipment Readiness support is conducted.
MESG-2 is located on the Joint Expeditionary Base Little Creek (JEBLC) Virginia Beach, Virginia. This is the headquarters for the unit and where some of the Expeditionary Equipment Readiness support is conducted.
2.0 Acronyms
CAC Common Access Card CESE Civil Engineering Support Equipment COMNAVSEASYSCOM Commander, Naval Sea Systems Command CONUS Continental United States COR Contracting Officer Representative DEI Diesel Engine Inspector DOD Department of Defense DON Department of Navy FAR Federal Acquisition Regulations FRP Fleet Response Plan FRTP Fleet Response Training Plan GFF Government Furnished Facilities GFI Government Furnished Information GFR Government Furnished Resources GR/GPM Government Representative/Government Project Manager HMMWV High Mobility Multi-Purpose Wheeled Vehicle
ISO International Standards Organization KO Contracting Officer MESF Maritime Expeditionary Security Force MSC Maintenance Support Center MSR Monthly Status Report MTVR Medium Tactical Vehicle Replacement NAVICP Naval Inventory Control Point NECC Navy Expeditionary Combat Command NMCI Navy Marine Corps Intranet NTCSSII Navy Tactical Command Support System II OCONUS Outside Continental United States PCO Procuring Contracting Officer POP Period of Performance PWS Performance Work Statement QASP Quality Assurance Surveillance Plan SG Strike Group SME Subject Matter Expert TA Technical Assistant TEU Training and Evaluation Unit TPOC Technical Point of Contact USFF US Fleet Forces
3.0 Scope of Work
3.1 The scope of the Performance Work Statement (PWS) is to acquire Expeditionary Equipment Readiness support in the areas of but not limited to: Contractor Field Team Support, and Engineering, Technical, Repair, and Logistic support to forces afloat or deployed.
3.2 Tasks include Organizational level (O-level) and Intermediate level maintenance on specific MESG-1/2 equipment specifically called out in this PWS and the identification and correction of material condition discrepancies in Hull, Mechanical and Electrical (HM&E), and Electronic and Civil Engineering Support Equipment (CESE), Boats (Patrol Craft), Material Handling Equipment (MHE) and other support equipment; identify and correct systems material discrepancies; assist with equipment lay-up and start-up maintenance; update and maintain configuration and availability report database systems.
4.0 Specific Requirements
This program shall include the tasks for which the Contractor is directly responsible for providing, supporting and maintaining, with accuracy and timeliness, IAW the PWS and other tasks required by the client. The tasks contained in this PWS may contain sub-tasks.
4.1 Maintenance
4.1.1 Perform mechanical and electrical system Organizational and Intermediate level maintenance on MESG-1 and MESG-2 Headquarters assigned equipment only operated by the Group Staff e.g. vehicles, CESE, weapons trailers, boat and boat trailers. Perform mechanical and electrical system Organizational level maintenance on MESG-1 and MESG-2 equipment specifically, conduct lay-up / start-up and related maintenance checks on equipment, designated CESE, boats and trailers at the discretion of the COR/TPOC in support of the Group Staff.
4.1.2 Contractor personnel shall perform hull, mechanical and electrical system Intermediate level maintenance and emergent repairs onboard assigned/designated CESE and boats listed on the MESF Equipment List to determine project scope, repairs and necessary replacements, in accordance with screened 2-KILO work requests. Performance of scheduled preventive maintenance (Organizational level) shall be the responsibility of US Navy personnel.
Contractors are not to perform scheduled preventive maintenance with the exception of lay-up, start-up and related check maintenance as part of the Group’s ONE and TWO’s mid-level storage program, unless it is an integral part of the repairs identified in the OPNAV 4790-2K or designated in writing on a Maintenance Requirement Card (MRC).
4.2 Logistic Support
Provide logistical support to identify and procure parts for use by contractor personnel, material, specialized tools and equipment. Contractor’s Logistician will document GFR usage and maintain inventory of tools, pre-expended bins for consumable items such as nuts, bolts, washers, electrical wire, rags, filters, lubricants, belts, hoses, fuses and bulbs.
Knowledge of the Naval Tactical Command Support System (NTCSS) to submit jobs in the Organizational Maintenance Management System-Next Generation (OMMS-NG) is required.
4.3 Assessments and Technical Support
4.3.1 The contractor shall assess, evaluate document findings, provide recommendations, and conduct repairs required to restore equipment to operational status and other services including:
Support annual CESE and boat inspections Perform propulsion, electrical and engine grooms on CESE and patrol boats Support routine material assessment and testing of CESE and patrol boats Provide welding and ship fitting support services Support patrol boat open water operational test requirements Support CESE operational tests Conduct Compliance Program support on patrol craft having 500hp or larger diesel engines every 18-24 months as designated under NAVSEA Ser 05Z_124 14 Mar 22 DEI Waiver for 40PBs and 34PBs.
4.3.2 The contractor shall coordinate the planning, scheduling and prioritization of routine and emergent work and corrective maintenance tasks to include but not limited to:
CONUS CESE and boat Inspections and Repairs OCONUS CESE and boat Assessments and Repairs Lay-up and Related maintenance checks of CESE/boats in mid-level storage program Start-up and Related maintenance checks of CESE/boats in mid-level storage program Brake repair/replacement for boat trailers and CESE Bearing replacement for boat trailers Electrical repairs for CESE and boats (includes repair, upgrades and installation of new systems) Engine repair/replacement for boats and CESE Transmission repair/replacement for boats and CESE
A/C repair/recharging/replacement for boats and CESE
Power steering repairs/replacement for boats and CESE
Weld/ hull repairs for boats and CESE
Metal fabrication
Generator repairs (mechanical/electrical and computer diagnostics ONLY, no rewind)
Electronic Control Unit (ECU) repairs
Tire repair for CESE and boat trailers
Axle repairs
Sponson repairs (boats ONLY)
Outboard engine repairs/replacements
Waterjet repair/replacement
Perform propulsion system and engine grooms on patrol boats and CESE
4.3.3 The contractor shall provide additional technical support services as follows:
Provide MESF command forces distance support via government furnished telephone (land line) to provide technical assistance when needed.
Assist through distance or onsite support as necessary to MESF command forces with assessment, troubleshooting, and repair of Air Conditioning and Refrigeration Systems.
Assist through distance or onsite support as necessary to MESF command forces with assessment, troubleshooting and repair of gasoline engines, diesel engines, outboard engines, outdrives and waterjet propulsion systems as well as vehicle systems such as engines and transmissions.
Provide Quality Assurance (QA) and Non-Destructive Testing (NDT) qualified technicians to MESF command forces for testing, inspection and certification of minor and major structural repairs.
Provide written reports for all work accomplished and completed action documentation.
Identify and record material deficiencies.
4.3.4 The contractor shall provide the following in support of the operational testing of Civil Engineering Support Equipment (CESE) and movement of various CESE for maintenance purposes.
Contractor is authorized to operate government vehicles for the purpose of conducting operational tests of equipment after completion of in shop repairs.
Contractor is responsible for providing copies of all state issued licenses for personnel operating government vehicles. All contractors must comply with state and local licensing requirements.
MESF will not and is not authorized to license the contractor. The contractors valid state issued license will qualify them to operate trucks, vans, and equipment under 10,000 lbs. gross vehicle weight, e.g. High Mobility Multi-Purpose Wheeled Vehicle (HMMWV). To operate the MTVR and 15T Freightliner Stake truck, the Contractor is required to obtain a Commercial Driver's License (CDL) air brake certification.
4.4 Travel
4.4.1 Travel IS AUTHORIZED to accomplish this task. The contractor will be expected to travel to various Maritime Expeditionary Security Force locations to conduct assessments, repairs, inspections and troubleshooting of boats and CESE. Travel expenses include airfare, per diem, rental car, local travel and miscellaneous expenses as authorized by the JTR. Costs for transportation may be based upon mileage rates, actual costs incurred, or a combination thereof, provided the method used results in a reasonable charge. No mileage costs will be incurred when travel is within a 50-mile radius of the primary work location.
4.4.2 The Contractor may be required to travel to CONUS and OCONUS. Contractor travel shall be consistent with the amounts and limitations specified in the Joint Travel Regulations (JTR), as they are amended from time to time and the limitation of funds specified in this contract. If travel is required, it shall be pre-approved by the COR. Prior to the commencement of travel; the contractor will obtain written approval from the COR, or his/her representative, and provide substantiated documentation along with the monthly invoice. When available, MESF contracted employees shall utilize Navy lodging (Navy Gateway Inn & Suites, NGIS, or DoD-comparable lodging) on board Navy Installations. If NGIS/comparable lodging is not available, NEX Navy Lodge accommodations should be considered. Commercial lodging alternatives must be pre-approved by the COR/TPOC. Copies of all invoices and receipts for travel must accompany the invoice for which the charges are claimed.
Locations include, but are not limited to: Portsmouth, Virginia Beach, Williamsburg, Yorktown, Norfolk, VA.;
Jacksonville, Mayport and Port Canaveral, FL.; Newport, RI.; Groton, CT.; Charleston, SC.; Annapolis, Md.; Earle, NJ; San Diego and Alameda, CA; Bangor/Kitsap, WA; Bremerton, WA; Portland, OR; Alaska; Fujairah and Jebel Ali, United Arab Emirates; Kuwait Naval Base, Kuwait; Naval Support Activity, Bahrain; Republic of Panama;
Rota, Spain; Djibouti, Africa; Guam, and other OCONUS locations as designated.
The following not to exceed travel amounts will be included:
Period Travel Base Year $300,000.00
Option Year 1 $300,000.00
Option Year 2 $300,000.00 Option Year 3 $300,000.00 Option Year 4 $300,000.00
FAR 52.217-8 $150,000.00
4.4.3 Travel costs will be considered reasonable and allowable only to the extent that they do not exceed on a daily basis, the maximum per diem rates in effect at the time of the travel. The Joint Travel Regulations (JTR), while not applicable to contractors shall provide the basis for the determination as to reasonable and allowable. Maximum use is to be made of the lowest available customary standard coach or equivalent airfare accommodations available during normal business hours. All necessary travel meeting the above criteria shall be approved in advance by the COR/GTL.
Exceptions to these guidelines shall be approved in advance by the Contracting Officer or his Designee.
4.4.4 OCONUS travel will include four trips annually to Djibouti, Africa for 8-10 days in duration; four trips annually to Jebel Ali & Fujairah, UAE for 10 days in duration; four trips annually to Kuwait for 5 days in duration, four trips annually to Bahrain for 8 days in duration, four trips annually to Guam for 10 days in duration.
Travel will include (4) technicians on each trip working 8 hour days. Travel may sometimes be concurrent from location to location. Due to OPSEC specific travel dates cannot be provided until award of the contract.
4.4.5 Six (6) emergent trips will be authorized for trips to OCONUS sights for two technicians working 12 hour days for ten (10) days each to perform hull, mechanical or electrical repairs due to lack of local technical support provided to MESF units deployed overseas.
4.4.6 Travel will include six (6) trips annually to CONUS locations listed in paragraph 7.18 for five days in duration for two technicians working 8 hour days to conduct troubleshooting and perform hull, mechanical, electrical or CESE repairs.
4.4.7 Travel will include eight (8) trips annually to CONUS locations listed in paragraph 7.18 for ten days in duration for five technicians working 8 hour days to conduct equipment assessments and to assist Reserve Squadrons, performing troubleshooting and hull, mechanical, electrical or CESE repairs.
4.4.8 The Contractor shall ensure all employees traveling OCONUS are submitted in the Aircraft and Personnel Automated Clearance System (APACS) at least 30 days prior to entering the country and ensuring all employees have the required travel documents i.e. Passport, and has completed the appropriate anti-terrorism/force protection, SERE training, ISOPREP and health screenings.
BASE PRIVILEGES - BAHRAIN AND CONTRACTOR LICENSING IAW BAHRAIN LAW:
Contractor shall be aware of the requirements for foreign companies wishing to do business in Bahrain must be registered and licensed carry out any commercial activity IAW with Bahrain Commercial Companies Law No. (21) of 2001. All contractor employees shall possess a valid working visa. The Government will not sponsor contractors. Working visas shall be the responsibility of the employee or sponsored by the Contractor.
Without additional expense to the Government, the contractor shall be responsible for obtaining any necessary insurance, licenses, and permits and for complying with any applicable laws, codes, and regulations required by the host-nation in connection with the performance of the work set forth in this contract. The Government will not be responsible for activities of the contractor or contractor employees outside the scope of this contract. The Government has no obligation to support the dependents of contractor employees, including, but not limited to, providing command sponsorship within the host-nation.
DOD CONTRACTOR Insurance (Bahrain)
No mandatory requirements for insurance exist
DOD CONTRACTOR SOFA Status (Spain)
The 1989 Agreement on Defense Cooperation (ADC), and local laws, supplement the NATO SOFA.
Under Annex 6, Article 1.1 of the ADC, contractors are authorized to work in Spain with prior approval from the Permanent Committee. Military authorities of the United States may propose to the Permanent Committee the designation of persons who are nationals of or ordinarily resident in the United States, whose presence in Spain is considered necessary solely for the purpose of executing a contract with the United States for the benefit of the U.S.
forces or U.S. and Spanish armed forces in the exercise of the functions authorized. Persons designated by the Permanent Committee shall be accorded during their temporary stay in Spain the same treatment as members of the civilian component.
DOD CONTRACTOR Insurance (Spain)
All contractor companies are required to have insurance under Annex 6 of the ADC. The requirement mandates a level of coverage between 6,000 and 900,000 Euros, depending on specific circumstances. This is required before the contracting company can obtain country clearance(s) for their employees, regardless of whether their employees will be designated contractor employees, “tech reps”, or employees of non-Spanish and non-commercial organizations. Therefore, insurance under Annex 6 will be required for a contractor to enter Spain.
The Government of the United States shall require that insurance contracts be affected to cover civil liabilities that may be incurred in Spanish territory. These civil liabilities include acts or omissions done in the performance of duty by employees of contractors and subcontractors of the U.S. forces.
Before the start of work by the contractor or subcontractor, the military authorities of the United States shall transmit to the Permanent Committee a document issued by the insurance company. This document must certify insurance coverage of the civil liabilities, in an amount considered sufficient by the Permanent Committee for this class of contract.
4.5 Response Time
The Contractor shall immediately commence travel arrangements to respond to emergent repairs (immediate repair required to bring a piece of equipment to Full Mission Capable status) to any OCONUS/CONUS location in paragraph 7.16. Response time required for units located within the Hampton Roads and San Diego area (50-mile radius from JEBLC, VA/Imperial Beach, CA) is within four hours. Response time to units outside 50-mile radius is within twenty-four hours of reported requirement. The Contractor shall have technicians on sight to any OCONUS location in paragraph 7.16 within seven days of reported requirement. This shall be imperative in meeting short-notice deployment dates of MESF forces and adaptive force packages.
4.6 Quality Management
The contractor shall establish, document, implement, and maintain a fully functional Quality Management System in accordance with NAVSEA Standard Item 009-04. The contractor must, at a minimum comply with the requirements in ISO 9001:2015 and provide documentation of Certification to the COR within ten (10) days after contract award.
The contractor's process and procedures must be consistent and results documented. The contractor is expected to be proactive and take corrective action as necessary to ensure the highest level of performance by contracted team personnel.
5.0 Personnel and Qualifications
The Contractor is responsible for providing personnel with proper education, experience and qualifications to perform the tasks assigned under this contract to cover…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .