About this file
This document includes a solicitation for facility renovations and maintenance services. The Naval Surface Warfare Center, Dahlgren Division requires maintenance and upgrades to existing structures within Building 1490 located at 19008 Wayside Dr., Dahlgren, VA. Services will be acquired using simplified acquisition procedures for commercial items with a firm-fixed price order. Responses are due no later than December 10, 2019 at 12:00 PM EST and shall include any relevant historical data and published pricing. The award will be made to the lowest priced technically acceptable offeror. Offerors must be registered in the System for Award Management to be eligible for award.
1st floor Demolition Plan
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
michael.a.shively Line michael.a.shively Callout michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Polygon michael.a.shively Callout
AREA OF WORK
michael.a.shively Text Box DEMOLITION NOTES (notes apply only to the Demolition Plan):
1.) Remove and dispose of all full height & partial height walls, doors, door frames, counter-tops, base cabinets etc. noted in RED. Where walls are removed, include removal of all associated power/data outlets, light switches etc. and associated wiring.
2.) Remove and dispose of all acoustical ceiling tile/grid/hangers and light fixtures in the spaces indicated.
3.) Remove and dispose of all window curtains and blinds.
4.) Remove and dispose of a portion of existing stairs to accommodate new work.
5.) Remove and dispose of all porcelain floor tile and wall base.
6.) Remove and dispose of wall covering on all walls and bulkheads.
7.) Remove and dispose of all carpet and vinyl wall base.
8.) Remove and dispose of base/wall cabinets, sink, faucet and associated plumbing.
9.) Remove and dispose of base/wall cabinets and counter top.
10.) Remove, salvage and reinstall wall mounted flat screens. Confirm location with the customer prior to re-installation.
11.) Remove, salvage and turn over to the government wall mounted cell phone lockers.
12.) Remove, salvage and reinstall ceiling mounted projection screen. Confirm location with the customer prior to re-installation.
13.) Remove and dispose of stair handrail.
14.) Remove drywall furring around existing structural column (existing structural column to remain).
15.) Salvage existing door and door hardware for re-installation at Lobby (see New Work Plan for more information).
16.) Salvage existing door and door hardware for re-installation at Receptionist (see New Work Plan for more information).
17.) Existing porcelain floor tile and acoustical ceiling tile to remain in portion of stairwell corridor.
michael.a.shively Callout Remove/salvage water coolers for re-installation. See New Work Plan for location. Re-route associated plumbing to new water cooler location.
michael.a.shively Text Box
DEMOLITION PLAN
michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Callout michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Line michael.a.shively Line michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Callout michael.a.shively Line michael.a.shively Line michael.a.shively Callout michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Callout michael.a.shively Line michael.a.shively Line michael.a.shively Callout michael.a.shively Callout michael.a.shively Text Box michael.a.shively Callout michael.a.shively Text Box michael.a.shively Line michael.a.shively Text Box michael.a.shively Text Box
DEMOLITION GENERAL NOTES:
1.) All building components and finishes which are to remain in place shall be protected from damage.
2.) Where existing drywall surfaces are to remain, clean and prepare gypsum wallboard substrates to be primed and painted.
3.) For walls that are to be demolished, salvage and reinstall light switches, thermostats etc. in new spaces.
michael.a.shively Line michael.a.shively Callout michael.a.shively Line michael.a.shively Line michael.a.shively Callout michael.a.shively Callout michael.a.shively Line michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Text Box michael.a.shively Line