Attachment_J.2_-_B337_Demolition_Plan.pdf

PDF 177 KB Posted

Attached to
Facility Renovations & Maintenance Federal contract opportunity
Solicitation number
N0017820R2303
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This solicitation requests quotations for facility maintenance and upgrades at Building 1490 located at Naval Surface Warfare Center Dahlgren Division in Dahlgren, Virginia. The work includes renovations, maintenance, and repairs within existing structures. Quotes are due by December 10, 2019 at 12:00 PM EST and shall be firm-fixed price. Award will be made based on lowest price technically acceptable. Offerors must be registered in the System for Award Management to be eligible. The solicitation is issued as a request for quotation under simplified acquisition procedures for commercial items according to FAR Part 12. The Department of the Navy Naval Sea Systems Command is the contracting agency.

Demolition Plan

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0 10 20

FEET

57.88'

UP

RAMP

OFFICE

152.86 61010

STORAGE

100.95

OFFICE

187.05 61010

STORAGE

47.91

STORAGE

23.02

MCH

56.42

OFFICE

165.21 61010

OFFICE

176.81 61010

RESTROOM

29.67

RESTROOM

59.74

WORKSTATION

34.85 61010

WORKSTATION

61010

WORKSTATION

61010

This Floor Plan is for reference only.

Although every effort has been made to ensure the accuracy of information, errors and conditions originating from physical sources used to develop the database may be reflected on this floor plan. The USN & NAVFAC shall not be liable for any errors, omissions or damage that results from inappropriate use of this document.

This material is For Official Use Only.

Unauthorized reproduction, distribution, publication, or exhibition of this material is STRICTLY

PROHIBITED. Destroy as "For Official Use Only"FOR OFFICIAL USE ONLY

ACTION/REMARKS

SUBMISSIONS/REVISIONS

DATENO.

Identified With:

Each Space

Naval District Washington

Drawing Creation Date:

May 2009

NFA100000597357

EEO/EAP

Building 337 First Floor

Space Description

Category Code

Room Number

Net Sq Feet

Naval Support Activity South Potomac

Dahlgren michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Text Box

GENERAL DEMOLITION NOTES:

1.) Remove and dispose of all walls, doors/door hardware, and door frames indicated in RED.

2.) Contractor shall verify existing conditions prior to commencing with demolition work.

3.) Remove demolished materials, debris and rubbish from the site as soon as practical. Do not accumulate debris on the floor or at the site. All building components and finishes which are to remain in place shall be protected from damage.

4.) Patch and repair all existing conditions (floors, walls etc.) disturbed for new work and finish to match surrounding area.

5.) Clean and prepare existing gypsum board substrates to be primed and painted, typical of all walls in the building.

6.) Remove and salvage all existing wall mounted emergency lighting units. Reinstall emergency lighting units following installation of new wall partitions.

7.) See HVAC System Installation narrative for additional information.

michael.a.shively Callout Remove and dispose of all carpet, 2'x'4' ceiling tiles, ceiling grid/hangers throughout room.

michael.a.shively Line michael.a.shively Line michael.a.shively Callout Remove and dispose of all toilet fixtures (urinal, sink, floor-mounted toilet) and toilet room accessories (mirror, toilet paper dispenser, paper towel dispenser etc.). Remove and dispose of 2"x2" ceramic tile flooring, acoustical ceiling tiles, grid, hangers and florescent light fixtures.

michael.a.shively Line michael.a.shively Line michael.a.shively Callout Remove VCT flooring michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Callout Remove and dispose of all toilet fixtures (sink & floor mounted toilet) and toilet room accessories (mirror, toilet paper dispenser, toilet towel dispenser). Remove and dispose of VCT flooring, acoustical ceiling tile, grid, hangers and florescent light fixtures.

michael.a.shively Line michael.a.shively Callout Remove and dispose of VCT flooring, acoustical ceiling tile, grid, hangers and florescent light fixtures.

michael.a.shively Callout Remove and dispose of carpet flooring michael.a.shively Callout Remove and dispose of all carpet, 2'x4' ceiling tiles, ceiling grid/hangers throughout the room michael.a.shively Line michael.a.shively Callout Remove and dispose of painted radiator and associated piping. Paint is assumed to be lead. Accordingly, dispose of lead painted items in accordance with all applicable local/federal guidelines and requriements.

michael.a.shively Callout Remove and dispose of painted radiator and associated piping. Paint is assumed to be lead. Accordingly, dispose of lead painted items in accordance with all applicable local/federal guidelines and requirements.

michael.a.shively Callout Remove and dispose of painted radiator and associated piping. Paint is assumed to be lead. Accordingly, dispose of lead painted items in accordance with all applicable local/federal guidelines and requirements.

michael.a.shively Callout Remove and dispose of painted radiator and associated piping. Paint is assumed to be lead. Accordingly, dispose of lead painted items in accordance with all applicable local/federal guidelines and requirements.

michael.a.shively Callout Remove and dispose of painted radiator and associated piping. Paint is assumed to be lead. Accordingly, dispose of lead painted items in accordance with all applicable local/federal guidelines and requirements.

michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Line michael.a.shively Callout Remove and dispose of window AC unit. Infill remaining exterior opening with new exterior siding, sheathing insulation and drywall to match existing adjacent construction materials.

michael.a.shively Rectangle michael.a.shively Rectangle michael.a.shively Callout Remove and dispose of window AC unit. Infill remaining exterior opening with new exterior siding, sheathing, insulation and drywall to match existing adjacnet construction materials.

michael.a.shively Rectangle michael.a.shively Callout Remove and dispose of window AC unit. Infill remaining exterior opening with new exterior siding, sheathing, insulation and drywall to match existing adjacnet construction materials.

michael.a.shively Callout Remove and dispose of existing door and frame. Infill remaining opening with new framing and drywall to match existing adjacent construction materials.

michael.a.shively Rectangle michael.a.shively Callout Remove and dispose of window AC unit. Infill remaining opening with new exterior siding, sheathing, insulation and drywall to match existing adjacnet construction materials.

michael.a.shively Callout Remove and dispose of window AC unit.

michael.a.shively Rectangle michael.a.shively Typewritten Text

DEMOLITION PLAN

michael.a.shively Rectangle michael.a.shively Rectangle michael.a.shively Callout Remove and dispose of all wall shelving, brackets and supports in their entirety michael.a.shively Callout Remove and dispose of base cabinet, counter top, sink, faucet and associated plumbing in their entirety michael.a.shively Callout Existing fire extinguisher to remain

NFA100000597357_337_01_FP
Layout1

File details come from the government source that posted it. Updated .