This document is a solicitation for facility renovations at a Naval Surface Warfare Center location. The solicitation requests quotes by October 15, 2019 to perform facility maintenance and upgrades within existing structures of Building 1490 located at 19008 Wayside Dr. in Dahlgren, VA. Work includes removing and replacing doors and frames, repairing walls and ceilings, installing new ceiling grid and tiles, replacing flooring, modifying electrical systems, and repainting. The solicitation is set aside for small businesses and award will be made using lowest price technically acceptable criteria to a firm registered in the System for Award Management. The document includes attachments providing property listings, wage determinations, and site visit requirements.

Amendment Solicitation

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Paragraph 3.3, 3.13, 3.14, 3.17, and 3.27 of the PWS w ere modified due to Questions received from Industry. Paragraph 3.33 - 3.36 w ere added to the PWS due to Questions received from Industry. The DBA Wage Determination has been updated to the current dated 8/30/2019. The questions and answ ers have been updated. The date has been extended to 10/21/2019 noon.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 11-Oct-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0017819R2318

X 9B. DATED (SEE ITEM 11)

11-Sep-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

11-Oct-2019

CODE

NSWCDD 3

JUAN G. MOJICA/0231 17632 DAHLGREN ROAD, STE

DAHLGREN VA 22448-5100

N00178 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0017819R2318

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Oct-2019 03:00 PM to 21-Oct-2019 12:00 PM.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

60 dys. ADC 1 NAVAL SURFACE WARFARE CENTER

DAVID JEND

6220 TISDALE ROAD BLDG 125 STE 159

DAHLGREN VA 22448-5114

540-653-1603 FOB: Destination

N00178

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

90 dys. ADC 1 NAVAL SURFACE WARFARE CENTER

DAVID JEND

6220 TISDALE ROAD BLDG 125 STE 159

DAHLGREN VA 22448-5114

540-653-1603 FOB: Destination

N00178

The following have been modified:

PERFORMANCE WORK STATEMENT

NSWCDD FACILITY UPGRADES

1.0 BACKGROUND

The Naval Surface Warfare Center, Dahlgren Division (NSWCDD) requires facility maintenance and upgrades to be performed within the existing structures of Building 1490, located at 19008 Wayside Dr., Dahlgren, VA. The renovation falls under the NAVFAC Capital Improvements Categories of Work Classification (CIBL) Category III guidelines. (Attachment 1).

2.0 APPLICABLE DOCUMENTS

2.1 Occupational Safety and Health Administration (OSHA) Regulations;

2.2 1490 RM2038_ (Attachment 2)

2.3 2vtl-2x2 (Attachment 3)

2.4 Ceiling tile (Attachment 4)

2.5 Grid (Attachment 5)

3.0 REQUIREMENTS

3.1 The Contractor shall be responsible for all labor and materials except for the Government Furnished Equipment (GFE) required to accomplish the work as indicated on the attached drawings and manufacturer’s product data. The Contractor’s work shall be performed at Naval Support Facility in Dahlgren, VA during normal working hours, Monday-Friday 0700-1600.

3.2 The Contractor’s work shall be completed in accordance with UFC 3-101-01 Architecture, with Change 3, and UFC 3-120-10 Interior Design, with Change 1, UFC 3-501-01 Electrical Engineering, UFC 3-520-01 Interior Electrical Systems, UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design, with Change 1 and IC Tech Spec – For ICD/ICS 705.

3.3 The Contractor’s work shall be done in accordance with the US Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1 dated November 2014 and all applicable building and life safety codes. The Contractor shall demolish and dispose of all materials identified in accordance with all applicable Local, State and Federal/Navy regulations. The Contractor shall provide supervision, safety, and quality control to ensure the project complies with building codes, safety codes, and inspection guidelines. The Government TPOC will inspect the work being performed throughout the project.

3.4 Building 1490 will remain occupied and fully operational throughout the duration of the project. The Contractor shall perform work in a manner to avoid disrupting daily operations in the building to the greatest extent possible.

3.5 Upon any changes to existing drawings, the Contractor shall provide new drawings to the Government for approval.

3.6 The Contractor personnel shall wear personal protective equipment in accordance with OSHA regulations throughout the project.

3.7 The Contractor shall be compliant with the OSHA standard for the Control of Hazardous Energy (Lockout/Tagout), Title 29 Code of Federal Regulations (CFR) Part 1910.147

3.8 The Contractor shall protect Government property from damage or disfigurement.

3.9 The Contractor shall keep all supplies, equipment, and tools out of traffic lanes or other areas where they might create a hazard.

3.10 At the end of each work period, the Contractor shall secure all supplies, equipment, and tools.

3.11 The Contractor shall coordinate all work with the Technical Points of Contact (TPOC) at G-242-H001.

3.12 The Contractor shall remove and dispose of four (4) double doors and six (6) single doors, for a total of ten

(10) doors to be removed, eleven (11) doors will be installed, per Attachment J.2.

3.13 The Contractor shall remove all wall boxes except for wall mounted power boxes and thermostats and remove old wiring, excluding the 3” conduit pipe above doors for network wiring. The Contractor shall remove and patch 48 Jack ports.

3.14 The Contractor shall replace the four (4) double doors and door jams with single 36” STC 50 door units. The Contractor shall replace the six (6) single doors and door jams with single 36” STC 50 door units. The Contractor shall install a single STC 50 door unit in the rear of Room 2039. All new door units and hardware (quantity 11) are

GFE.

3.15 The Contractor shall repair all walls as a result of door replacements. The Contractor shall install matching insulation in the walls prior to patching and finishing. The Contractor shall repair the walls with 5/8th gypsum wallboard. The Contractor shall tape and finish the walls a Level 4 finish. (1-blocking coat, 2 finish coats).

3.16 The Contractor shall repair ceiling as needed.

3.17 The Contractor shall remove and install new ceiling grid, hangers, and ceiling tiles in Rooms 2036 - 2043.

Ceiling grid, hangers, and acoustical tiles shall match as close as possible the existing adjacent ceiling system.

3.18 The Contractor shall repair all openings on walls with 5/8th gypsum wallboard and apply fire Safe non-shrink grout or acoustic sealant in all voids above and below the track and both sides of the partition.

3.19 The Contractor shall replace broken, damaged, or missing wall plates for electrical outlets as needed.

3.20 The Contractor shall remove all unused wire from the existing conduit.

3.21 The Contractor shall remove empty electrical outlets and patch with drywall.

3.22 The Contractor shall cap existing water and air lines so that they are not visible in the working area.

3.23 The Contractor shall replace the carpet tile in room 2043 with Peto II 26 EW24 "Manhattan Blue" 2’x2’ carpet tiles.

3.24 The Contractor shall apply paint coatings over new and existing gypsum wallboard surfaces in Rooms 2036 - 2043. The Contractor shall repair and finish sand all walls to include any existing holes filled with expanding foam.

The Contractor shall finish all walls above the drop ceiling and below the raised floor need to GA 214 Level 5.

3.25 The Contractor shall only use paint that is suitable in accordance with the Master Painter Institute (MPI) standards for the interior architectural surfaces being finished. All paint coats shall be from a single manufacture and shall be finished to GA 214 Level 5. The Government has selected Sherman-Williams SW6252 INTERIOR LATEX EGG SHELL finish and a SW6253 INTERIOR SEMIGLOSS. The Contractor shall provide interior flat intermediate and topcoats of a maximum of 50 g/L VOC and interior non-flat intermediate and topcoats of a maximum 150 g/L VOC.

3.26 The Contractor shall replace the raised floor tiles (CCN1000) to match the existing raised floor tiles in Rooms 2036-2042.

3.27 The contractor shall install a 18 inch wire mesh network cable tray able to support three inch conduit above ceiling grid per drawing (See attachment 2). The pathways are 3” PVC between 5 walls with the 18” cable tray.

3.28 The Contractor shall install a flashing Blue light in Room 2038 that is operated by a switch. The switch shall be located with existing light switches.

3.29 The Contractor shall obtain and install soundproofing material on all walls in Room 2043 from the computer floor to the drop ceiling. The square footage of the room is 505 sqft. Alphasorb barrier acoustic panels 1 1/8” thickness (or a similar sound soak material) shall cover from the drop ceiling to the raised floor which is approximately 10 feet tall. There is no acoustic rating requirement for this material; it is more for the aesthetic appearance. The Government has chosen Slate 2017.

3.30 The Contractor shall modify the wall mounted electrical outlets to allow for the new door openings between Rooms 2039 and 2040. The Contractor shall remove the feeds in its entirety from the door to the end of the run.

3.31 The Contractor shall remove the old vinyl wall base and replace it with new vinyl wall base. Vinyl wall base to be installed shall be 4 inches high and 1/8-inch thick and shall include inside and outside corners. The wall base shall confirm to ASTM F1861-98, Type TS. The Contractor shall provide the wall base in rolls and not 4 foot lengths. The Government has selected Gray 48 vinyl base color.

3.32 Process for the five (5) hallway facing doors.

3.32.1 The Contractor shall remove and install the hallway facing door. The Government will remove and reinstall XO dial lock and LENEL one at a time. If required, the Contractor shall install gypsum wallboard and insulation so that there are no openings into the hallway. The door must be fully functional with Security functionality before proceeding to the next door.

3.32.2 The Government will coordinate with the Locksmith and LENEL and the Contractors on each door.

3.32.3 The current plan is for the hallway doors to take five (5) days unless the Government can ensure the coordination of the Locksmith and Lenel will be able to perform more than one (1) door a day.

3.33 The Contractor shall implement a phased approach for completing the Rooms. Room 2037 shall be completed first. The computer will be stored in Room 2041 until Room 2037 is complete and then the computers will be moved into Room 2037 so that the other rooms can be completed.

3.34 The Contractor shall install 12 man bars per ICD 705 Tech Spes, Chapter 3.G. The 12 duct penetrations are 18” x 18”.

3.35 The Contractor shall encapsulate (400 sq ft) the beams with insulation and 5/8” drywall. The drywall shall be finished and painted per 3.25 above.

3.36 The Contractor shall install the following: Quantity 19: Recessed Ceiling Lights (2VTL 40L ADP EZ1 LP

840) 2'x4'; Quantity 7: 2VTL4 40L ADP EZ1 EL14L LP840 2x4 with emergency backup (old emergency lights to be removed); Quantity 5: 2VTL2 40L ADP EZ1 LP840 2x2 regular; and Quantity 1: 2VTL2 40L ADP EZ1 LP840.

In addition, the Government requires 12 of the Blue Warning Lights (LP1 Streamline 120VAC, Hertz 50/60Amps) to be switched “on” from in the room and switched “on” from in the hallway.

4.0 SECURITY

All work to be performed under this PWS is UNCLASSIFIED.

5.0 GOVERNMENT FURNISHED PROPERTY

The use of Government Furnished Property and service for other purposes is prohibited. The Contractor or the Contractor’s employees will not use Government Property in any manner for any personal advantage, business gain, or other personal endeavor. Government Furnished Property is referenced in Attachment J.6 Government Furnished Property.

QUESTION/ANSWER FROM INDUSTRY

Question #1: Due Date. On FBO is stated it is due at 10/15 at 3 and on the solicitation it states it is due 10/15/19 @ 12:00 p.m. Which is correct?

Answer #1: The due date is 10/15/2019 at 3PM.

Question #2: Delivery: How is the final proposal being submitted? Email, Hand Delivery, Commercial Carrier?

Answer #2: Email is the preferred method.

Question #3: What is the estimated price range for this project?

Answer #3: This is a commercial service contract and not a construction contract. Estimated price ranges are used in construction contracts and not commercial service contracts.

Question #4: If you already have access to the base, do you have to submit the site visit forms?

Answer #4: No.

Question 5: Please provide all available as-builts for the proposed work area for B1490. For bidding purposes and to clarify SOW, necessary as-builts (and their purpose) are as follows:

Structural - To show true floor to deck height throughout and to help identify areas where structural steel above walls will need to be built out to achieve STC 50.

Plumbing/Mechanical – To help quantify ductwork to receive man bars/to quantify the number of air/water lines being removed and identify their shut-off location

Electrical/Comm – To quantify the data ports/wire/electrical devices to be removed. Please mark these up to identify items requested to be removed.

Architectural – To identify areas where existing drywall/insulation are not up to STC 50 requirements/To possibly identify the maker of the existing raised floor system to avoid having to replace the support frame.

Answer 5: As-builts are not available.

Question 6: Please provide onsite supervision requirements for this project. Will dedicated SSHO/QC/Superintendent personnel be required to be onsite at all times and if so please quantify the number of individuals and minimum experience/training requirements?

Answer 6: No, the SSHO/QC/Superintendent personnel will not be required to be onsite at all times, but the Contractor shall provide supervision, safety, and quality control to ensure the project complies with building codes, safety codes, and inspection guidelines. The Government TPOC will inspect the work being performed throughout the project. This will be added to the PWS in the Solicitation amendment.

Question 7: Please confirm no hazardous materials have been identified nor should be accounted for as part of this proposal.

Answer 7: No hazardous materials have been identified, nor should be accounted for.

Question 8: The RFP states that the project will have a duration of 60 days. 60 days may be enough time for onsite construction (though it will still be tight) but will not be enough time to account for submittal period and long lead items such as the floor tile. 120 days is recommended. Please advise.

Answer 8: After calling industry, floor tile lead time is 6-8 weeks. The period of performance will be extended to 90 days. An amendment to the solicitation is forthcoming.

Question 9: Please confirm that the project must be phased so that all work within Rm 2037 is completed before beginning work in Rm 2043 in order to accommodate existing electrical equipment expected to be installed in Rm 2043.

Answer 9: Correct, complete room 2037 (computers will be stored in 2041 until 2037 is complete. Then the computers will be moved to the completed 2037 while the rest of the rooms are completed. An amendment to the solicitation is forthcoming.

Question 10: Will just the ceiling tile be replaced or should the grid be replaced as well?

Answer 10: Both ceiling and grid will be replaced. An amendment to the solicitation is forthcoming.

Question 11: Please provide specifications for man bars. In the past we have been required to install all-thread through the duct with exposed epoxy covered nuts on each. Is this acceptable?

Answer 11: The Contractor shall follow the ICD 705 Tech Specs. An amendment to the solicitation is forthcoming.

The specifications for the man bars are in Chapter 3.G and states the following:

7. Vents and Ducts

a) All vents and ducts shall be protected to meet the acoustic requirements of the SCIF. (See Figure 4, Typical Air (Z) Duct Penetration, for example.)

b) Walls surrounding duct penetrations shall be finished to eliminate any opening between the duct and the wall.

c) All vents or duct openings that penetrate the perimeter walls of a SCIF and exceed 96 square inches shall be protected with permanently affixed bars or grills.

(1) If one dimension of the penetration measures less than six inches, bars or grills are not required.

(2) When metal sound baffles or wave forms are permanently installed and set no farther apart than six inches in one dimension, then bars or grills are not required.

(3) If bars are used, they shall be a minimum of ½ inch diameter steel, welded vertically and horizontally six inches on center; a deviation of ½ inch in vertical and/or horizontal spacing is permissible.

(4) If grilles are used they shall be of:

(a) ¾ inch-mesh, #9 (10 gauge), case-hardened, expanded metal; or

(b) expanded metal diamond mesh, 1-1/2” #10 (1-3/8” by 3” openings, 0.093” thickness, with at least 80% open design) tamperproof; or

(c) welded wire fabric (WWF) 4x4 W2.9xW2.9 (6 gauge smooth steel wire welded vertically and horizontally four inches o.c.).

(5) If bars, grilles, or metal baffles/wave forms are required, an access port shall be installed inside the secure perimeter of the SCIF to allow visual inspection of the bars, grilles, or metal baffles/wave forms. If the area outside the SCIF is controlled (SECRET or equivalent proprietary space), the inspection port may be installed outside the perimeter of the SCIF and be secured with an AO-approved high-security lock. This shall be noted in the FFC.

Question 12: Please quantify the man bars required to be installed as part of this project including total number and sizes of all duct penetrations.

Answer 12: 12 duct penetrations, 18”x18”. An amendment to the solicitation is forthcoming.

Question 13: Please confirm that the existing raised floor tile will be replaced throughout all spaces except for Rm 2043 and that the floor support framing will remain to be reused with new tile.

Answer 13: Confirm, however if there is a problem with the existing framing while installing the new tile, the existing framing will need to be replaced or fixed.

Question 14: Please provide specifications/requirements for the new floor tiles (i.e. hollow/solid filled, quality/thickness of vinyl etc.)

Answer 14: Per the solicitation, PWS Section 3.26, the specifications for the floor tiles are CCN1000.

Question 15: Please confirm that the raised floor tile in Rm 2043 will remain and have new carpet tile replaced/re-installed over it. Please provide specs/requirements for thickness/quality level of new carpet tile.

Answer 15: Per the solicitation , PWS Section 3.23, “The Contractor shall replace the carpet tile in room 2043 with Peto II 26 EW24 "Manhattan Blue" 2’x2’ carpet tiles.”

Question 16: Please confirm that STC 50 (min.) pathways will be required at 6 locations where new cable trays start and stop on opposite sides of STC 50 walls and provide the total number/sizes of pathways at each location.

Answer16: Confirm. The pathways are 3” PVC between 5 walls with 18” cable tray. An amendment to the solicitation is forthcoming.

Question 17: During the site visit it was noticed that some of the existing walls butt to the bottoms of existing structural steel beams which do not have any insulation or other means of preventing sound transmission. It is assumed that these areas must be addressed in order to meet STC 50 requirements, please provide design requirements/details for how these areas should be addressed and quantify the number/lengths of walls this must be addressed on.

Answer 17: Encapsulate (400 sq ft beams with insulation and 5/8” drywall The drywall shall be finished and painted per the specifications in the PWS 3.25. An amendment to the solicitation is forthcoming.

Question 18: Please provide details and direction for the airlines to be removed (i.e. 1) Do the get removed back to source or just above ceiling with cap? 2) Are there valves above ceiling? 3)Where are they fed from?

Answer 18: Per the solicitation , PWS Section 3.22, “The Contractor shall cap existing water and air lines so that they are not visible in the working area.”

Question 19: Please confirm that the gov’t will furnish all new doors and hardware required for this project including mounting hardware and jamb insulation.

Answer 19: Per the solicitation, PWS Section 3.14, “All new door units and hardware (quantity 11) are GFE.”

Question 20: Please quantify the number of data jacks or other devices which will be removed and patched as part of this project.

Answer 20: 48 Jack ports will be removed and patched. An amendment to the solicitation is forthcoming.

Question 21: Please provide new lighting details including existing lighting layout, total quantity, quantity with emergency ballasts, new layout etc.

Answer 21: Quantity 19: Recessed Ceiling Lights (2VTL 40L ADP EZ1 LP 840) 2'x4'; Quantity 7: 2VTL4 40L ADP EZ1 EL14L LP840 2x4 with emergency backup (old emergency lights will be removed); Quantity 5: 2VTL2 40L ADP EZ1 LP840 2x2 regular; and Quantity 1: 2VTL2 40L ADP EZ1 LP840. In addition, the Government requires 12 of the Blue Warning Lights (LP1 Streamline 120VAC, Hertz 50/60Amps) to be switched “on” from in the room and switched “on” from in the hallway. An amendment to the solicitation is forthcoming to PWS Section 3.28.

Question 22: In the room where the new door will be installed and the electrical raceway must be modified… Will we be required to re-route the feeds in order to insure all receptacles on both sides of the door still work or should it be removed in its entirety from the door to the end of run?

Answer 22: It will be removed in its entirety from the door to the end of the run. An amendment to the solicitation is forthcoming.

Question 23: Will all door frames be replaced along with the doors or will some frames remain to be reused? If some will remain please quantify and specify locations.

Answer 23: All door frames will be replaced. An amendment to the solicitation is forthcoming.

Question 24: Please confirm that a minimum of 2 escorts will be provided by the gov’t for the duration of this project.

Answer 24: Yes, 2 escorts will be with you for the entire length of the project.

Question 25: The wage determination included with the RFP didn’t appear to pertain to this type of work. We believe the wage determination "General Decision Number: VA20190007 08/30/2019, Construction Type: Building is correct. Please confirm.

Answer 25: The Wage Determination will be updated with the current one dated 8/30/2019. An amendment to the solicitation is forthcoming.

Question 26: Is the Contractor required to move the sprinkler head as stated in PWS 3.17?

Answer 26: A modification to the solicitation is forthcoming removing the following sentence from the PWS 3.17, “The Contractor shall adjust the height of (1) sprinkler head to align with the height of the existing adjacent sprinkler heads in the acoustical ceiling in Rooms 2036 – 2043.

(End of Summary of Changes)