This document includes a solicitation and related attachments for facility renovations. The Naval Surface Warfare Center, Dahlgren Division requires maintenance and upgrades to an existing building located in Dahlgren, Virginia. Work includes removing and replacing doors and door jams, repairing and finishing walls, installing insulation and acoustic sealant, and completing a furniture layout. The solicitation was issued as a Request for Quotation using Simplified Acquisition Procedures. Quotes are due by October 15, 2019. Award will be made to the lowest priced technically acceptable offeror. Firms must be registered in the System for Award Management to be eligible for award. The opportunity is set aside for small businesses. Attachments provide additional specifications and documentation requirements for the site visit.
J.2 1490
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_J.8_-_DBA_Wage_Determinations_Rev.1.pdf | ||
| N0017819R23180002.pdf | ||
| N0017819R23180001.pdf | ||
| Attachment_J.3_-_2vtl-2x2.pdf | ||
| Attachment_J.1_-_NAVFAC_Capital_Improvements_Categories_of_Work_Classification.pdf | ||
| Attachment_J.6_Government_Furnished_Property.pdf | ||
| N0017819R2318.RFP.Final.pdf | ||
| Attachment_J.4_-_Ceiling_Tile.pdf | ||
| Attachment_J.8_-_DBA_Wage_Determinations.pdf | ||
| Attachment_J.7_-_SCA_Wage_Determinations.pdf | ||
| Attachment_J.9_-_Site_Visit_Documentation.pdf | ||
| Attachment_J.5_-_Grid.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Doors and door jams to be removed
Demolition
Install matching insulation material where needed in walls
No Locks
CDX‐10 Locks
New Door
Lenel for each door
‐ Double doors and door jams replaced with single 36” STC 50 doors X4 – Walls repaired with 5/8th sheetrock finished and painted
‐ All other existing doors and door jams replaced with rated STC 50 x6 ‐ Install new single 36” STC 50 door x 1 ‐ Blue walls patched and finished painted all holes on the existing True floor to True ceiling walls ‐ Purple wall needs to be true floor to true ceiling dry wall, all holes patched and finished painted ‐ Fire Safe non‐shrink grout or acoustic sealant in all voids above/below track both sides of partition ‐ Entire wall assembly shall be finished and painted from true floor to true ceiling ‐ Install matching insulation material where needed in walls ‐ **hardware needs to be compatible with existing key cores**
Construction
Cable tray install path
Guessing for room 2039 since the new door was not on the plans
Furniture Layout