0715-09_-_Barge_Testing_-_SOW_Rev_1_-_Copy_For_RFQ.docx
DOCX document 19 KB Posted
- Attached to
- BARGE TESTING Federal contract opportunity
- Solicitation number
- N0017819QP073
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| http://everyspec.com/MIL-SPECS/MIL-SPECS-MIL-DTL/MIL-DTL-901E_55988/ | — | |
| 0715-09_-_Barge_Testing_-_CDRL_A002_-_TEST_PLAN.doc | DOC document | |
| N0017819QP073_SF18.pdf | ||
| 0715-09_-_Barge_Testing_-_CDRL_A001_-_TECHNICAL_REPORT_-_STUDY-SERVICES.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BARGE TESTING
STATEMENT OF WORK (SOW)
1.0 BACKGROUND
The Naval Surface Warfare Center, Dahlgren Division (NSWCDD) requires barge testing for multiple test assets to meet Grade A shock.
| 2.0 | APPLICABLE DOCUMENTS |
| 2.1 | MIL-DTL-901E; Shock Tests, H.I. (High-Impact) Shipboard Machinery, Equipment, and Systems, Requirements for. 20 June 2017 |
| 3.0 | REQUIREMENTS |
| 3.1 | The Contractor shall conduct a heavyweight shock test in accordance with MIL-DTL-901E for the Government Furnished Materials (GFM) listed in section 6.0 of this SOW at one deck frequency (CDRL A001, A002). The contractor shall meet the following additional requirements under this SOW: |
| 3.1.1 | Draft formal procedure and design package for the subject testing (CDRL A002). |
| 3.1.2 | Offload and install equipment onto the test fixture and prepare for testing. |
| 3.1.3 | Provide all power to units under test. |
| 3.1.4 | Provide no less than nine (9) channels for instrumentation on costumer equipment. |
| 3.1.5 | Provide instrumentation to monitor test inputs to the units under test. |
| 3.1.6 | Remove and repackage units under test after testing is complete. |
| 3.1.7 | Prepare and submit formal test report in accordance to the military standard (CDRL A001). |
| 3. | The contractor shall coordinate with the technical point of contact listed below to schedule the shipment of all Government Furnished Equipment/Materials (GFE/GFM) and work to be performed under this statement of work. It is anticipated that work shall begin not later than thirty (30) days after award of contract. |
| 4.0 | TRAVEL |
| 4.1 | No travel is anticipated in the performance of this contract. |
5.0 GOVERNMENT TECHNICAL POINT OF CONTACT (TPOC)
To be provided at time of award.
| 6.0 | GOVERNMENT FURNISHED EQUIPMENT/MATERIALS (GFE/GFM) |
| 6.1 | The Government will provide the following GFE/GFM: |
| 6.1.1 | Maintenance Interconnecting Cabinet (MIC), quantity 1 – Value $450,000 |
| Approximate Dimensions: 34.25” x 29.06” x 75.33” Approximate Weight: 1283 lbs | |
| 6.1.2 | Launcher Control Cabinet (LCC), quantity 1 - Value $350,000 |
| Approximate Dimensions: 24.6” x 29” x 75” Approximate Weight: 799 lbs | |
| 6.1.3 | Power Supply (PS) – quantity 1 – Value $250,000 |
| Approximate Dimensions: 25” x 24” x 37” Approximate Weight: 580 lbs | |
| 6.1.4 | Missile Control Panel - quantity 1 – Value $45,000 |
Approximate Dimensions: 12” X 18.5” X 8.25” Approximate Weight: 43 lbs
6.2 The Government will provide all test item equipment, interconnecting cables, operational and checkout hardware.
File details come from the government source that posted it.