This award notice announces a competitive solicitation for M98 filter sets. The Naval Surface Warfare Center, Dahlgren Division intends to award multiple five-year contracts to qualified manufacturers for the M98 Gas-Particulate Filter Set, NSN 4240-01-369-6533. Technical specifications and quality assurance standards will be provided in the solicitation. Offerors must be properly registered in SAM and the Joint Certification Program to receive attachments. The Government does not consider these items to be commercial and will use formal source selection procedures from FAR Part 15. Previous contracts were awarded to HDT Expeditionary Systems and Design West Technology. The Government intends to make multiple awards considering both price and non-price factors. All responsible sources may submit proposals by the response date.
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N00178-18-R-5005-0004.pdf | ||
| N0017818R5005_Amendment_3.pdf | ||
| N00178-18-R-5005_Questions_and_Answers_dtd_26_July_18.pdf | ||
| N00178-18-R-5005-0002.pdf | ||
| N00178-18-R-5005_Amendment_0001.pdf | ||
| J.2_Recent_and_Relevant_Past_Performance_Narrative.docx | DOCX document | |
| Exhibit_B_-_DD_Form_1423s.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
X
A X B X C X D
EX
X
G F 37 - 48
49 - 59 X H 60 - 62 arlice.johnson@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
DO-A3 1 62
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00178 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
ARLICE JOHNSON 540-653-7039
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
1 - 2 3 - 4
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
5 - 11 12 - 15
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
16 - 21 22 - 23
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 24 - 27 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 28 - 29 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
30 - 35
PART II - CONTRACT CLAUSES
NSWCDD 6
ATTN: ARLICE. JOHNSON, 0251
ARLICE.JOHNSON@NAVY.MIL
176320 DAHLGREN ROAD STE 157
DAHLGREN VA 22448-5110
540-653-8391
540-653-6810FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
21 Jun 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0017818R5005
Section A - Solicitation/Contract Form
SUPPLEMENTAL INFORMATION
A.1 REQUIREMENTS
(a) NSWCDD is soliciting offers to supply the item listed below. The quantities listed below represent the total estimated requirement for the five-year life of the contract. Should the Government wish to order additional quantities above the guaranteed minimum quantity, the requirement will be split by way of competed delivery orders between the M98 Filter Program contract holder(s).
Guaranteed Minimum Quantity: 250 each Minimum Production Lot Quantity: 250 each Maximum Program Quantity: 24,147 between the M98 Filter Program contract holder(s)
NSN: 4240-01-369-6533
Part Number: MIL-PRF-51527D Amendment 1 current through RFV 415-D009 (03 April 2014), NOR 980-0213-002 (02 December 2013), NOR 980-0214-002 (09 December 2013), NOR 980-0215-002 (12 December 2013) Item Name: M98 Gas-Particulate Filter Set
A.2 UNIQUE ASPECTS OF THIS SOLICITATION
(a) Under this IDIQ contract agreement, NSWCDD guarantees to buy a minimum quantity of 250 each of the M98 Gas-Particulate Filter Set, NSN: 4240-01-369-6533, and may order additional quantities above the minimum, if required. As described in clause 52.216-19 “Order Limitations”, specified minimum and maximum quantities apply to any single delivery order that the Government may issue under this contract.
(b) Adherence to Military Specifications and Standards is mandatory for this procurement. See the Technical Data Package (TDP) and Special Packaging Instructions (SPI), for specific instructions.
(c) Contractor Lot and Serial numbers for each item shall be noted on the electronic DD250 in Wide Area Work Flow upon submission.
A.3 NOTICE REGARDING MARKINGS
(a) Please note that the requirements for bar-code and Military Shipping Labeling (MSL) apply to shipments made under the contract that will result from this solicitation. Please refer to the clause in Section D of this solicitation entitled, PACKAGING REQUIREMENTS, as well as the clause in Section I of this solicitation entitled, ITEM IDENTIFICATION AND VALUATION. You must consider the cost of such requirements when preparing your offer in response to this solicitation.
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 24,147 Each
FILTER SET, GAS PARTICULATE
FFP
DD 1423: Exhibit A
DESCRIPTION: FILTER SET, GAS PARTICULATE
FSCM: 81361
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
NSN: 4240-01-369-6533
MFR PART NR: MIL-PRF-51527D Amendment 1
PSC CD: 4240
MAX
NET AMT
See Exhibit A
PRICING TABLE
M98 Filter Set Pricing Matrix Quantity Year 1* Unit Year 2* Unit Year 3* Unit Year 4* Unit Year 5* Unit Year 6* Unit
250 – 300 300 – 400 400 – 500 500 and above
Year 1* Year 1 is defined as any order placed from the Date of Contract Award through 31 December 2019 Year 2* Year 2 is defined as any order placed from 1 January2020 through 31 December 2020 Year 3* Year 3 is defined as any order placed from 1 January2021 through 31 December 2021 Year 4* Year 4 is defined as any order placed from 1 January2022 through 31 December 2022 Year 5* Year 5 is defined as any order placed from 1 January2023 through 31 December 2023 Year 6* Year 6 is defined as an order on the last day of the ordering period and have it delivered in the future
+Note: The total price for CLIN 0001 shall be calculated as the highest unit price multiplied by the maximum quantity of 24,147.
++Note: Different prices area acceptable for each year. Alternate proposals are acceptable for different quantity breaks.
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0004 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (DEC 1995)
(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $500 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.
(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.
(End of Text)
HQ B-2-0009 NOTE (CDRL)
NOTE A - Offeror shall complete the "Price Group" and "Estimated Total Price" blocks of each data item on the Contract Data Requirements List(s), attached hereto.
CONTRACT SUMMARY FOR PAYMENT OFFICE
(FIXED PRICE) (FEB 1997)
This entire contract is fixed price.
Section C - Descriptions and Specifications
STATEMENT OF WORK
C.1 DRAWINGS/SPECIFICATIONS
(a) In addition to the drawing(s) and/or specifications listed below, other documents which are part of this procurement and which apply to Preservation/Packaging/Packing and Inspection and Acceptance are contained elsewhere.
(b) Drawings and Specifications in accordance with Technical Data Package/Technical Data Package Listing with revisions in effect as of the date below are applicable to this procurement:
CLIN TDPL Date 0001 MIL-PRF-51527D Amendment 1 01 November 2014 0001 RFV 415-D009 03 April 2014 0001 NOR 980-0213-002 02 December 2013 0001 NOR 980-0214-002 09 December 2013 0001 NOR980-0215-002 12 December 2103
C.2 MEETINGS/CONFERENCES
(a) Contract Status Review Meeting: As part of the overall contract management effort, the Contractor shall provide technical and managerial representative(s) to attend periodic meetings at a location to be determined to review contract status. A conference may be called by either the Government or the Contractor to clarify any questions in regard to the contract requirements. Topics to be discussed shall include contract status, testing, production, logistics, technical issues, and deliverables. The Contractor will coordinate an agenda with the Procuring Contracting Officer (PCO) no later than 5 days prior to the meeting.
C.3 CONTRACTOR FURNISHED ITEMS
When meetings are held at the Contractor's facility, the Contractor will make the following available for the Government's use:
(a) Production or other required versions of the M98 Gas Particulate Filter and M98 Gas Filter as needed for viewing.
(b) Required technical, logistics or other documentation (including drawings, computer data bases, publications, and other required data).
(c) Computer resources, as required.
C.4 DIGITAL DELIVERY OF DATA
(a) Delivery by the Contractor to the Government of certain technical data and other information is now frequently required to be made in digital form rather than in hardcopy form. The method of delivery of such data and/or other information (i.e., in electronic, digital, paper hardcopy, or other form) shall not be deemed to affect in any way either the identity of the information (i.e., as “technical data” or “computer software”) or the Government’s and the Contractor’s respective rights therein.
(b) Whenever technical data and/or computer software deliverables required by this contract are to be delivered in digital form, any authorized, required, or permitted markings relating to the Government’s rights in and to such technical data and/or computer software must also be digitally included as part of the deliverable and on or in the same medium used to deliver the technical data and/or software. Such markings must be clearly associated with the corresponding technical data and/or computer software to which the markings relate and must be included in such a way that the marking(s) appear in human-readable form when the technical data and/or software is accessed and/or used. Such markings must also be applied in conspicuous human- readable form on a visible portion of any physical medium used to effect delivery of the technical data and/or computer software. Nothing in this paragraph shall replace or relieve the Contractor’s obligations with respect to requirements for marking technical data and/or computer software that are imposed by other applicable clauses such as, where applicable and without limitation, DFARS 252.227-7013 and/or DFARS 252.227-7014.
(c) Digital delivery means (such as but not limited to Internet tools, websites, shared networks, and the like) sometimes require, as a condition for access to and/or use of the means, an agreement by a user to certain terms, agreements, or other restrictions such as but not limited to “Terms of Use,” licenses, or other restrictions intended to be applicable to the information being delivered via the digital delivery means. The Contractor expressly acknowledges that, with respect to deliverables made according to this contract, no such terms, agreements, or other restrictions shall be applicable to or enforceable with respect to such deliverables unless such terms, agreements, or other restrictions expressly have been accepted in writing by the Procuring Contracting Officer; otherwise, the Government’s rights in and to such deliverables shall be governed exclusively by the terms of this contract.
HQ C-1-0001 ITEM(S) 0001 - DATA REQUIREMENTS (NAVSEA) (SEP 1992)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A, attached hereto.
HQ C-2-0008 ASSIGNMENT AND USE OF NATIONAL STOCK NUMBERS (NAVSEA) (MAY 1993)
To the extent that National Stock Numbers (NSNs) or preliminary NSNs are assigned by the Government for the identification of parts, pieces, items, subassemblies or assemblies to be furnished under this contract, the Contractor shall use such NSNs or preliminary NSNs in the preparation of provisioning lists, package labels, packing lists, shipping containers and shipping documents as required by applicable specifications, standards or Data item Descriptions of the contract or as required by orders for spare and repair parts. The cognizant Government Contract Administration Office shall be responsible for providing the Contractor such NSNs or preliminary NSNs which may be assigned and which are not already in possession of the Contractor.
HQ C-2-0009 ASSIGNMENT OF SERIAL NUMBER(S) (NAVSEA) (SEP 1990)
The Contractor shall request serial number assignment, in writing, from the Cognizant Technical Program Office, with a copy to the cognizant Contract Administration Office. The request for serial number assignment shall contain the following minimum information:
(a) Contract number;
(b) Assigned line item number and description;
(c) Assigned type designation;
(d) Assigned model number;
(e) Top drawing number and ID (List of Drawings) number;
(f) Exact quantity for which serial numbers are being requested, including preproduction samples required by the contract; and
(g) National Stock Number
HQ C-2-0012 CONFIGURATION MANAGEMENT (NAVSEA) (APR 2015)
(a) Baseline Definition - For configuration control purposes, all contractual documentation in effect at the time of contract award shall constitute the Contract Baseline which shall be considered incorporated in the baseline documentation.
(b) General Requirement - (1) The Contractor shall maintain a Configuration Control Program to assure that all detail level work being performed under this contract is in compliance with appropriate baseline documentation.
The Contractor shall prepare a Configuration Management Plan in accordance with the requirements of the contract for approval by the Government.
(2) Whenever a situation arises wherein the Contractor cannot comply with a baseline document, or whenever intent of such documentation is significantly changed by detail level documentation, the Contractor shall submit change documents to modify baseline documents to resolve the conflict or to allow non-compliance. Whenever the cost of implementing a proposed change is less than the threshold requiring certified cost or pricing data, the Contractor shall provide documentation explaining the nature of related costs as shown on the change document. Whenever the contract cost changes by an amount greater than the threshold requiring certified cost or pricing data, the Contractor shall complete such cost and pricing data as the Contracting Officer shall require detailing all related costs, and attach it to the change document. Requirements for cost and pricing data shall be determined by the gross amount of the change unless otherwise directed by the contracting officer. Change documentation shall be submitted to the Contracting Officer in accordance with the Contract Data Requirements List (CDRL), and as described in paragraphs (c) through (f) below.
(c) Engineering Change Proposals (ECPs) - ECPs shall be prepared in accordance with the approved configuration management plan and the requirements of the contract. DI-SESS-80639D approved 7 April 2015 and MIL-HDBK- 61A of 7 Feb 2001 apply. An ECP should be submitted whenever the detail level physical configuration, material quality, operational or functional performance of equipment or installed systems will not be in compliance with baseline design-related documents (Specifications, Contract Drawings, etc.), and a change to the baseline document is considered an appropriate means of resolving a design-related issue. Documentation shall be developed in sufficient detail to enable Government review and evaluation of the merits of the proposed change, including cost and scheduling impact, ship class impact, and consequences if disapproved. All existing drawings and technical manuals impacted by the change shall be listed along with a brief narrative explanation of needed changes to incorporate the ECP if approved. Weight and moment data incidental to the change shall be provided. The Contractor shall also prepare applicable baseline document insert sheets, with specific word changes or proposed re-write, to facilitate baseline documentation changes.
(d) Non-Engineering Change Proposals (NECPs) – An NECP should be submitted whenever necessary to document administrative, procedural, scheduling, or documentation changes that do not directly impact the physical configuration of the equipment. The NECP shall explain the nature of the problem, identify the applicable baseline document (i.e., Contract Data Requirement List (CDRL), Contract Clause, etc.) and provide a detailed explanation justifying the proposed course of action desired to resolve the problem. Insert sheets for applicable documents shall also be attached to facilitate change action in the event the NECP is approved.
(e) Deviations and Waivers - In the event that a baseline design-related document requirement cannot be met, and a change to the baseline document is considered inappropriate, the Contractor shall submit a Request for Variance.
DI-SESS-80640D approved 7 April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. The explanation of "need for deviation" should provide detailed justification and consequences of approval, to include technical details explaining the degree of non-compliance or effect on ship equipment or system operation constraints. In a similar manner, a waiver shall document an "as built" configuration that departs from baseline documentation and should include any proposed corrections or modifications to better meet the intent of the baseline document.
(f) Equitable Adjustments for Change Documentation Preparations - For its effort expended in preparing ECPs, NECPs, Deviations and Waivers, the Contractor shall receive equitable adjustment under the following circumstances:
(1) In the event the Contractor, on its own initiative, and without written request from the Contracting Officer, develops a change document that is later disapproved by the Government, the Contractor shall bear the cost of this effort.
(2) To avoid such loss, and at its option, the Contractor may submit a "preliminary" document that outlines intent, but without detailed supporting documentation and request the Contracting Officer's approval for expenditure of effort to complete the detailed supporting documentation. In the event the Contracting Officer denies this request, the Contractor will bear the cost of development of the "preliminary" document, and shall make no further effort to complete detailed supporting documentation.
(3) In the event the Contracting Officer approves the Contractor's request to develop supporting documentation, the Contractor shall be equitably compensated for its effort for both the "preliminary" and "final" documentation, regardless of whether or not the change document is later approved.
(4) In the event the Contracting Officer requests in writing that the Contractor develop change documentation, the effort expended by the Contractor in developing such documentation shall be subject to equitable adjustment, regardless of whether or not the change document is later approved.
(5) In the event the Contractor, on its own initiative, and without written request from the Government, develops a change document that is later approved by the Contracting Officer, the cost of developing such documentation shall be incorporated in the contract modification that implements the change.
(6) Failure to agree to such equitable adjustment in contract price shall constitute a dispute, and shall be adjudicated in accordance with the requirements of the clause entitled "DISPUTES" (FAR 52.233-1).
(g) Any cost reduction proposal submitted pursuant to the clause entitled "VALUE ENGINEERING" (FAR 52.248-1) shall be submitted as a Code V Engineering Change Proposal (VECP). DI-SESS-80639D approved 7 April 2015 and MIL-HDBK-61A of 7 Feb 2001 apply. Information required by the "VALUE ENGINEERING" clause shall also be submitted as part of the change request.
HQ C-2-0032 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT - ALTERNATE II
(NAVSEA) (MAY 1993)
(a) NAVSEA Form 4340/2 or Schedule C, as applicable, Government Furnished Information, attached hereto, incorporates by listing or specific reference, all the data or information which the Government has provided or will provide to the Contractor except for -
(1) The specifications set forth in Section C, and
(2) Government specifications, including drawings and other Government technical documentation which are referenced directly or indirectly in the specifications set forth in Section C and which are applicable to this contract as specifications, and which are generally available and provided to Contractors or prospective Contractors upon proper request, such as Federal or Military Specifications, and Standard Drawings, etc.
(b) Except for the specifications referred to in subparagraphs (a)(1) and (2) above, the Government will not be obligated to provide to the Contractor any specification, drawing, technical documentation or other publication which is not listed or specifically referenced in NAVSEA Form 4340/2 or Schedule C, as applicable, notwithstanding anything to the contrary in the specifications, the publications listed or specifically referenced in NAVSEA Form 4340/2 or Schedule C, as applicable, the clause entitled "GOVERNMENT PROPERTY (FIXED-PRICE CONTRACTS)" (FAR 52.245-2), or
"GOVERNMENT PROPERTY (COST-REIMBURSEMENT, TIME-AND-MATERIAL, OR LABOR-HOUR
CONTRACTS)" (FAR 52.245-5), as applicable, or any other term or condition of this contract.
(c)(1) The Contracting Officer may at any time by written order:
(i) delete, supersede, or revise, in whole or in part, data listed or specifically referenced in NAVSEA Form 4340/2 or Schedule C, as applicable; or
(ii) add items of data or information to NAVSEA Form 4340/2 or Schedule C, as applicable; or
(iii) establish or revise due dates for items of data or information in NAVSEA Form 4340/2 or Schedule C, as applicable.
(2) If any action taken by the Contracting Officer pursuant to subparagraph (c)(1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, an equitable adjustment shall be made in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.
HQ C-2-0051 SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements.
All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only.
HQ C-2-0059 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (AUG 1994)
If, during the performance of this or any other contract, the contractor believes that any contract contains outdated or different versions of any specifications or standards, the contractor may request that all of its contracts be updated to include the current version of the applicable specification or standard. Updating shall not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
HQ C-2-0062 WAIVER OF FIRST ARTICLE REQUIREMENTS (NAVSEA) (SEP 1990)
If the First Article is waived by the Government, the Contractor shall deliver supplies that are identical or substantially identical to those previously accepted by the Government under the following contract(s):
HQ C-2-0063 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES
(NAVSEA) (APR 2004)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as “protected information”. File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors are free to enter into separate non-disclosure agreements with the file room contractor. (Please contact Director, E Business Division for contractor specifics.) However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
Section D - Packaging and Marking
CLAUSES INCORPORATED BY REFERENCE
252.223-7001 Hazard Warning Labels DEC 1991
D.1 PACKAGING REQUIREMENTS
(a) Military preservation, packing, and marking for the item identified above shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, Revision D, Date 15 Dec 99 including Notice 1, dated 10 May 02 and the Special Packaging Instruction (SPI) contained in the
TDP.
PRESERVATION: MILITARY
LEVEL OF PACKING: B
QUANTITY PER UNIT PACKAGE: 001
(b) Unitization
(i) Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers.
(ii) Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance.
(iii) The weight capacity of the pallet must be adequate for the load.
(iv) The pallet shall be a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.
(c) Marking:
(i) In addition to any special markings called out on the SPI;
(1) All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision P, Change Notice 4, dated 19 Sep 2007 including bar coding and a MSL label.
(2) The Contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.
(3) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see ://www.acq.osd.mil/log/rfid/index.htm for the current DoD Suppliers Passive RFID Information Guide and Supplier Implementation Plan. If the item has Unique Item Identifier (UII) markings then the concatenated UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the palletized unit load.
(d) Heat Treatment and Marking of Wood Packaging Materials:
(i) All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee.
(ii) The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure tractability to the original source of heat treatment. Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard.
(iii) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. The quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens; on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood products verified in accordance with their National Plant Protection Organizations compliance program. In addition, wood used as dunnage for blocking and bracing, to include ISO containers, shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
(e) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.
(f). Hazardous Materials (as applicable):
(i) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
(ii) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:
International Air Transport Association (IATA) Dangerous Goods Regulations International Maritime Dangerous Goods Code (IMDG) Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49 Joint Service Regulation AFJMAN24-204/TM38-250/NAVSUPPUB 505/MCO P4030.19/DLAM 4145.3 (for military air shipments).
(iii) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.
(iv) When applicable, a Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.
(g) Supplemental Instructions:
(i) Place a red “X” and the word “SHORT BOX” on the front of any box that has a short quantity, then place that box/boxes with the markings showing on ght top fromt of the pallet load.
HQ D-1-0001 PACKAGING OF DATA
Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.
All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.
Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), DOD 5220.22-M dated 28 February 2006 with Change 2 dated 18 May 2016.
HQ D-2-0005 IDENTIFICATION MARKING OF PARTS – ALTERNATE I (NAVSEA) (APR 2015)
(a) Identification marking of individual parts within the systems, equipments, assemblies, subassemblies, components, groups, sets or kits, and of spare and repair parts shall be done in accordance with applicable specifications and drawings.
To the extent identification marking of such parts is not specified in applicable specifications or drawings, such marking shall be accomplished in accordance with the following:
(1) Parts not manufactured to Government specifications shall be marked in accordance with generally accepted commercial practice.
(2) Parts manufactured to Government specifications shall be marked as follows:
(i) Electrical Parts - that is, all parts in electrical equipments and electrical parts when used in equipments which are not electrical in nature (e.g., electric controls and motors in a hydraulic system) - shall be identified and marked in accordance with MIL-STD-1285D(1) dated 10 November 2010, or, where MIL-STD-1285D(1) does not cover such a part, in accordance with MIL-STD-130N(1) dated 16 November 2012. Requirements of MIL-STD-1686C dated 25 October 1995 for Electrostatic Discharge Control shall be addressed.
(ii) Electronic Parts - that is, all parts in electronic equipments and electronic parts when used in equipments which are not electronic in nature (e.g., electronic fuel controls in some engines) - shall be identified and marked in accordance with Requirement 67 of MIL-HDBK-454B dated 15 April 2007. Requirements of MIL-STD-1686C for Electrostatic Discharge Control shall be addressed.
(iii) Parts other than electrical or electronic parts (as described above) shall be identified and marked in accordance with
MIL-STD-130N(1).
(b) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.
HQ D-2-0007 MARKING AND PACKING LIST(S) - ALTERNATE I (NAVSEA) (APR 2015)
(a) Marking. Shipments, shipping containers and palletized unit loads shall be marked in accordance with MIL-STD- 129R dated 18 February 2014.
(b) Packing List(s). A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, shipping container or palletized unit load shall be provided by the Contractor with each shipment in accordance with the above cited MIL-STD. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.
Where DD Form 1348-1 or DD Form 1348-1A is applicable and an assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) Master Packing List. In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one shipment, shipping container or palletized unit load comprise the contract line item being shipped.
The master packing list shall be attached to the number one container and so identified.
(d) Part Identification. All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit pack(s) or shipping container by part number and/or national stock number. Refer to the above cited MIL-STD for marking of assorted (related-unrelated) items.
HQ D-2-0008 MARKING OF REPORTS (NAVSEA) (SEP 1990)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) name and business address of the Contractor
(2) contract number
(3) contract dollar amount
(4) whether the contract was competitively or non-competitively awarded
(5) sponsor:
(Name of Individual Sponsor)
(Name of Requiring Activity)
(City and State)
Section E - Inspection and Acceptance
PRODUCTION LOT ACCEPTANCE
E.1 PRODUCTION LOT ACCEPTANCE TESTING (GOVERNMENT FACILITY)
(a) Each production lot of filters shall undergo conformance inspection in accordance with MIL-PRF-51527 Section 4.3. Conformance inspections for gas filter airflow resistance, gas filter leakage, particulate filter airflow resistance and particulate filter filtration efficiency shall be accomplished by the manufacturer before the filters are packaged.
(b) A production lot acceptance test sample is required to be submitted by the Contractor from each production lot tendered to the Government for acceptance.
(c) The production lot acceptance test sample for CLINs shall consist of the quantity required for CK gas life testing IAW Para 4.3 of MIL-PRF-51527.
(d) The production lot acceptance test sample units shall be randomly selected from the entire lot by, or in the presence of, the Government Quality Assurance Representative (QAR). Prior to selection of the production lot acceptance test sample units, the lot shall have been inspected to, and shall meet all requirements of, the contract.
Unless authorized by the Contracting Officer, a test sample shall not be submitted from a lot which is or has been rejected for nonconformance to the detailed requirements of the contract, the specification(s), and/or the drawing(s).
(e) The production lot acceptance test sample (including, if applicable, basic issue items and/or repair parts) shall be packaged and packed in accordance with contract; if packaging and packing requirements are not specified in the contract, the production lot acceptance test sample shall be packaged and packed in accordance with best commercial practices. The production lot acceptance test sample shall be appropriately marked, to include the drawing/part number, the contract number, the name of the Contractor, and FOR PRODUCTION LOT ACCEPTANCE TESTING. The production lot acceptance test sample shall be accompanied by a DD Form 1222, Request for and Results of Test, appropriately completed by the Government QAR.
(1) A copy of the results of the Contractor's examination and/or test shall be attached to the DD Form 1222. Simultaneous with shipment of the production lot acceptance test samples, a copy of the DD form 1222 (including attached documentation) shall be submitted to:
For chemical agent testing:
Chief, Protective Equipment Test Branch Edgewood Chemical Biological Center Email: APGR-ECBCProtectiveEquipmentTestBranch@conus.army.mil
(f) The production lot acceptance test sample shall be shipped Free on board (FOB) Destination to the location designated below unless transportation protective service and/or transportation security is required (by other provision of this contract); if transportation protective service and/or transportation security is required, the test sample shall be shipped FOB origin on a Government Bill of Lading (GBL).
For chemical agent testing:
Chief, Protective Equipment Test Branch
(g) The production lot acceptance test sample items shall be examined and tested by the Government for and/or in accordance with Para 4.3 of MIL-PRF-51527.
(h) The Contractor shall submit a report containing the results of lot acceptance tests to the Contracting Officer.
(i) Within 15 days after receipt of the production lot acceptance test report by the Contracting Officer, the Contracting Officer shall provide written notification to the Contractor as to the approval, disapproval, or conditional approval of the production lot acceptance test sample. Unless authorized by the Contracting Officer, the lot from which the production lot acceptance test sample is drawn shall not be shipped from the Contractor's facility, nor shall final acceptance of the lot be made, until such time as notification has been provided by the Contracting Officer that the production lot acceptance test samples have been approved/conditionally approved.
(j) If the Contracting Officer does not provide notification of the approval, conditional approval, or disapproval of the production lot acceptance test sample within the time specified above, the Contracting Officer shall equitably adjust the delivery/performance dates and/or the contract price (and any other contractual provision affected by such delay) in accordance with the procedures provided in the Changes clause of this contract.
(k) If the production lot acceptance test sample fails to meet any applicable contractual requirement, the lot from which the test sample was drawn shall be considered to be rejected. The Contractor shall take immediate corrective action, both to correct the deficiency/nonconformance (if applicable) and to prevent recurrence of such deficiency/nonconformance, and shall submit an additional production lot acceptance test sample (from the reworked lot or from a new lot as applicable). Such corrective action shall be taken by the Contractor at no increase in contract price and shall apply to all items (including, if applicable, basic items and/or repair parts) either in- process or final assembly which have been produced (or are in production) since the last successful production lot acceptance test. Any and all costs associated with testing the additional production lot acceptance test sample shall be borne by the Contractor. The Contracting Officer shall equitably adjust the contract price as applicable for the costs associated with additional testing resulting from failure of the production lot acceptance test sample to meet applicable contractual requirements.
(l) If the Contractor fails to deliver any production lot acceptance test sample for test within the time specified, or if the production lot acceptance test sample is disapproved and an acceptable replacement is not provided within the time specified, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(m) Unless otherwise specified, the production lot acceptance test sample shall be considered to be destructively tested, and is in addition to the units deliverable under the contract.
E.2 INSPECTION POINTS: ORIGIN
(a) The Government's inspection of the supplies offered under this contract/delivery order shall take place at
ORIGIN.
(b) The facility where supplies are to be furnished is below:
[To Be Completed by the Offeror]
E.3 INCLUSION OF TESTING COSTS
(a) All test costs associated with the performance of this contract shall be borne by the Contractor and shall be part of the overall unit cost of the item(s) to be delivered under this contract.
(b) These costs shall include, but are not limited to: (1) All pre-production material evaluations.
(2) All production lot acceptance inspection/test costs required to be performed or directed by government documents, contract clauses, drawing, specification or publications used to determine material compliance or suitability for use in this contract.
(3) All transportation and/or shipping costs, if applicable, associated with the performance of First Article tests and/or production lot testing/acceptance inspection.
(4) All inspections and tests performed by government or commercial test laboratories.
(c) Testing that cannot be performed by a commercial testing laboratory because it involves actual chemical agents or simulant, and/or unique equipment may be contracted with the Edgewood Chemical Biological Center (ECBC) Test Laboratories, Aberdeen Proving Grounds, MD. A test service agreement (TSA) will be established for this testing. It is the responsibility of the Contractor to contact the ECBC Testing Laboratories for a cost estimate of the testing, which will be included in the Contractor's proposed unit price.
(d) Points of contacts for obtaining cost estimates for agent or simulant and physical testing or chemical agent testing are as follows:
For agent or simulant and physical testing:
Chief Test, Reliability & Evaluation Branch
Email: APGR-ECBCTREB@conus.army.mil
And/or:
For chemical agent testing: Chief Protective Equipment Test Branch
(e) If it is determined that Edgewood Chemical Biological Center (ECBC) Test Laboratories, Aberdeen Proving Grounds (APG), MD, will be utilized for conducting any of the above testing, it is the successful Contractors responsibility to contact the following point of contact to establish a TSA for necessary ECBC testing support:
Email: svc.ecbc.techor.apgr@conus.army.mil Technical Industrial Liaison Officer Edgewood Chemical Biological Center 5183 Blackhawk Road Building E3330 Aberdeen Proving Ground, MD 21010-5424
(f) It is in the Contractors best interest to contact the Technical Industrial Liaison Officer as soon after contract award as possible to start the TSA process. Delay in contract performance due to failure to do so in a timely manner is not an excusable delay.
E.4 LAB PERFORMANCE CERTIFICATION REQUIREMENTS
(a) For contracts requiring Agent/Simulant testing, the Contractor is not to commence any testing until the Performance Certification requirements have been met. A Performance Certification shall be required for each national stock number (NSN) or non-NSN that requires Agent/Simulant testing on the contract. Performance Certification on the lab facility will be valid for up to 365 days from the date of approval. At the expiration of the Performance Certification, or if another NSN is awarded, a new Performance Certification is required.
(b)The Contractor is required to follow these steps to receive a Performance Certification:
(1) Complete/fill out Certification Testing Log Sheet. To obtain a copy of Certification Testing Log Sheet, please request a copy from: usarmy.RIA.ecbc.mbx.labcerts@mail.mil.
(2) Send completed Testing Log Sheet within 30 days of award of contract/delivery order/option/add-on to the contract, to:
Edgewood Chemical Biological Center-Rock Island, RDCB-DES-Q, ATTN: Qualification Procedure Team Lead; by FAX to 309-782-1919, or email to: usarmy.RIA.ecbc.mbx.labcerts@mail.mil.
(3) After receiving the completed Testing Log Sheet, a Quality Assurance Representative will schedule a visit to the testing facility within 15 calendar days of receipt of the documentation for the initial award of each NSN OR non- NSN that requires Agent/Simulant testing on the…
This is the start of the file's text. The full file is on GovTribe.