N00178-13-R-4665_Statement_of_Work.docx
DOCX document 13 KB Posted
- Attached to
- Fire Control Equipment
- Solicitation number
- N0017813R4665
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Redacted_J A_13-R-4665.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Installation of Equipment and Operator Training
The contractor shall install the following equipment at the NSWCDD Potomac River Test Range:
Fall of Shot system consisting of five fall of shot (splash detection) mounts and one Fall of Shot central control unit.
Video tracker system consisting of two Imago XG video tracking stations.
The new equipment shall be integrated with existing, government owned Imago tracking stations and splash detection mounts. The contractor shall demonstrate operation and full performance of all systems after installation.
The contractor shall conduct an eight hour training session for up to ten NSWCDD personnel on the correct operation and maintenance of the systems.
File details come from the government source that posted it. Updated .