continuation_sheet.docx
DOCX document 15 KB Posted
- Attached to
- Clean Room Enclosure
- Solicitation number
- N00173-15-Q-0323
About this file
Continuation Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P00002.pdf | ||
| P00001.pdf | ||
| Solicitation_Clauses_Mar_30_2015_update.doc | DOC document | |
| SF-18.pdf | ||
| RFQ_REPRESENTATIONS_-_Commercial_MAR_2015.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 36 JULY 1966
GENERAL SERVICES ADMINISTRATION
FED. PROC. REG. (41 CFR) 1-16.101
| CONTINUATION SHEET |
| REF. NO. OF DOC. BEING CONT’D |
N00173-15-Q-0323
PAGE OF
2 16
NAME OF OFFEROR CONTRACTOR
ALL QUOTERS
| ITEM NO. |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Part #CAP591-38604A-1 CLEAN ROOM - Rigid Wall; CAP591-14x27x8H; ISO Class 7, Class 10,000; -(10) Filter Units - CAP117-424 variable speed control; (7) lights-CAP1210-2x4; Upgrade to a prefab wire kit for the filter units and lights-PWK591-10F7L; (2) doors - 44Wx84H anodized aluminum frame transparent clear acrylic panel; Upgrade to (1) internal rigid wall gown room - 6x4; (2) Magnehelic pressure gages; Transparent clear acrylic wall panels on (2) 14ft sides and gown room walls; White painted aluminum wall panels with polypropylene core on (2) 27ft sides; Upgrade to full wall recirculation on (2) 27ft walls; Double wall construction on (2) sides for air return, outside walls seal to the floor on both sides, roof panels on top to create a plenum, perimeter doors have a door sweep, fixed bottom;
Quote should not include: Temperature/Humidity controls, flooring, sprinklers and installation.
Upgrade to an A/C System - 10 ton, cooling only; Rejects heat to the existing space; Existing space should be large relative to the clean room; frame and duct work to connect to the clean room;Unit sets on the existing floor 480 volt, 3 Phase.
Quote should not include condensate drain plumbed, wiring to building and permits
Items must be brand name or equal.
If available, please include a published price list or a cost breakdown and return the RFQ package to Kerry Callahan at the following email: kerry.callahan@nrl.navy.mil
Any questions concerning this Request for Quotation (RFQ) must be emailed to SolOnA@nrl.navy.mil at least five (5) days before the closing date shown in block 10 on page 1 of the RFQ.
EA
EA
File details come from the government source that posted it. Updated .