Amendment 0002.pdf
PDF 767 KB Posted
- Attached to
- Temporary Structure - Naval Station Norfolk - Amendment 002 Federal contract opportunity
- Solicitation number
- N0016721R0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001 PPI Response.pdf | ||
| N00016721R0017 Amendment 0001.pdf | ||
| Attachment A - Pre Proposal Inquiries.xlsx | XLSX spreadsheet | |
| Attachment B - Safety Data Sheet.docx | DOCX document | |
| Attachment C - Price Proposal Form.xlsx | XLSX spreadsheet | |
| N0016721R0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1300945961
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to respond to PPIs. Please see continuation page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Nov-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0016721R0017
X 9B. DATED (SEE ITEM 11)
21-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Nov-2021
CODE
NAVAL SURFACE WARFARE CENTER CARDEROCK
CRYSTAL Y. CHATMON
757-600-2939 CRYSTAL.CHATMON@NAVY.MIL
904 CORPORATE LANE
CHESAPEAKE VA 23320
N00167 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0016721R0017
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
PPI RESPONSES
RFP Questions - Sustainment, Restoration and Repair (SRM) Services GOVERNMENT RESPONSE # Doc Sec /
Page Question
1 Are Performance and Payment Bonds required
Please see Amendment 0001
2 C Please clarify Solicitation Sections C.
and D. Are hard copy proposals required as identified at D., or are email copies as identified at C.
acceptable?
Section C. Email is acceptable.
3 Please clarify the date the structure is to be turned over to the Government for use? PWS Section 1.0 eludes to 1 November 2021 and 3.5 States 1 December 2021.
Please see Amendment 0001
4 3.12 PWS paragraph 3.12 identifies a windload capability requirement of 90 mph. Are project specific Engineer certified and stamped drawings required?
Engineer certified and stamped drawings are NOT required. Intent of the windload requirement was to amplify that the structure will be installed in an exposed location in a coastal environment, and tie-downs/restraining mechanisms are necessary
(End of Summary of Changes)
File details come from the government source that posted it. Updated .