AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to extend the closing date of the solicitation from June 14, 2017 to June 30, 2017 and to update the specifications and 52.212-1 Addendum.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-17-R-JN43
X 9B. DATED (SEE ITEM 11)
26-Apr-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jun-2017
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
K. WAGONER (812-854-3990)
BLDG 3373
300 HIGHWAY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00164-17-R-JN43
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SECTION 4.0 - CLAUSES & OTHER FULL TEXT INFORMATION
SUMMARY OF CHANGES REV
SUMMARY OF CHANGES
The closing date of the solicitation has been extended from June 14, 2017 at 2:00 pm local time to June 30, 2017 at 2:00 pm local time.
The following changes are incorporated to Specification PS-JXNL-F17-0014:
Change Paragraph 3.4.2 k) FROM:
k) The trigger shall exhibit no functional degradation after a salt fog exposure of 4-days (T).
TO:
k) The trigger should exhibit no functional degradation after a salt fog exposure of 4-days (O).
Change Table I: Requirement Verification Cross Reference to remove Section 3 Requirement 3.7.10 Salt Fog
Change Paragraph 4.7.10 Salt Fog FROM:
a) Three triggers shall be Salt Fog conditioned in accordance with TOP-3-2-045A “Adverse Conditions, Salt Fog” and the associated references to MIL-STD-810 therein. The triggers shall be checked for corrosion after the exposure. The exposure shall be alternating 24-hour periods of salt fog exposure and drying conditions for a minimum of four 24-hour periods (two wet and two dry) in accordance with TOP-3-2-045A “Salt Fog”. At the completion of the 96 hours the triggers shall be installed into the weapon and fire 5 fully loaded magazines without a failure of any kind and there shall be no evidence of any corrosion that prevents functioning.
TO:
a) Three triggers will be Salt Fog conditioned in accordance with TOP-3-2-045A “Adverse Conditions, Salt Fog” and the associated references to MIL-STD-810 therein. The triggers will be checked for corrosion after the exposure. The exposure will be alternating 24-hour periods of salt fog exposure and drying conditions for a minimum of four 24-hour periods (two wet and two dry) in accordance with TOP-3-2-045A “Salt Fog”. At the completion of the 96 hours the triggers will be installed into the weapon and should fire 5 fully loaded magazines without a failure of any kind and there should be no evidence of any corrosion that prevents functioning.
The following changes are incorporated to Specification PS-JXNL-F17-0015:
Change Paragraph 3.4.2 k) FROM:
k) The trigger shall exhibit no functional degradation after a salt fog exposure of 4-days (T).
TO:
k) The trigger should exhibit no functional degradation after a salt fog exposure of 4-days (O).
Remove paragraph 3.7.10 Salt fog
Change Table I: Requirement Verification Cross Reference to remove Section 3 Requirement 3.7.10 Salt Fog
Change Paragraph 4.7.10 Salt Fog FROM:
a) Three triggers shall be Salt Fog conditioned in accordance with TOP-3-2-045A “Adverse Conditions, Salt Fog” and the associated references to MIL-STD-810 therein. The triggers shall be checked for corrosion after the exposure. The exposure shall be alternating 24-hour periods of salt fog exposure and drying conditions for a minimum of four 24-hour periods (two wet and two dry) in accordance with TOP-3-2-045A “Salt Fog”. After 96 hours the triggers shall be installed into weapons and fire 5 fully loaded magazines without a failure of any kind.
There shall be no evidence of any corrosion that prevents functioning.
TO:
a) Three triggers will be Salt Fog conditioned in accordance with TOP-3-2-045A “Adverse Conditions, Salt Fog” and the associated references to MIL-STD-810 therein. The triggers will be checked for corrosion after the exposure. The exposure will be alternating 24-hour periods of salt fog exposure and drying conditions for a minimum of four 24-hour periods (two wet and two dry) in accordance with TOP-3-2-045A “Salt Fog”. After 96 hours the triggers will be installed into weapons and should fire 5 fully loaded magazines without a failure of any kind. There should be no evidence of any corrosion that prevents functioning.
SECTION 5.0 - INSTRUCTIONS & PROVISIONS
The following have been modified:
52.212-1 ADDENDUM
PROPOSAL REQUIREMENTS
The contractor’s proposal shall include the following:
Document / Information Volume Number Technical Proposal Volume I
(30 page limit) Technical Product Sample N/A Delivery Schedule Narrative Volume II
(No page limit)
Past Performance Summaries (Min 3, Max 5 references) Volume III (15 page limit)
Completed Solicitation including cover letter, pricing, and signed amendments Volume IV
(No page limit)
NOTE: Multiple awards may be made from this requirement. Contractors may propose only right-hand MK 13 MOD 7 triggers (including Training and Engineering Services), only right-hand MK 15 MOD 1 Trigger Assemblies (including Training and Engineering Services), or both.
I. General Information:
a) For proposal purposes, the estimated date of contract award is 31 August 2017.
b) COVER LETTER: The proposal shall include a cover letter signed by an individual authorized to commit the company to the proposal. The cover letter shall be submitted with Volume I. The cover letter shall identify all enclosures being transmitted as part of the proposal. The letter shall reference the solicitation number and acknowledge that it transmits an offer in response to the solicitation. The cover letter required by this paragraph supersedes and replaces the “First Page” requirements referred to in FAR 52.215-1, Subsection (c)(2). It shall state
Solicitation Number (N00164-17-R-JN43) Commercial and Government Entity (CAGE) number, Duns Number, Taxpayer Identification Number (TIN), Name, address and telephone number of the cognizant DCMA Office (can be found at http://www.dcma.mil/ ) Proposal validity through 30 August 2017.
Names, telephone numbers and email addresses of persons authorized to conduct negotiations, as well as the names of the official authorized to bind the offeror’s organization shall be clearly identified, Any exceptions taken to any requirements of the solicitation, to include but not be limited to technical exceptions, clauses and or provisions. The cover letter shall indicate in which volume and on what page of the offeror’s proposal the exception is addressed.
A copy of the offerors SAM registration information from the SAM website.
c) Proposals shall not contain classified information.
d) Offerors may submit only one proposal as a prime contractor, but may be listed as a subcontractor in one or more competing proposals.
e) Solicitation information and amendments will be posted to the Federal Business Opportunities website at www.fbo.gov. Offerors may e-mail written questions requesting clarification of the RFP to the Government via the Contract Specialist, Kristina Wagoner, at: kristina.wagoner@navy.mil. The Government will answer questions received up to 14 days prior to the closing date of the RFP and will provide responses to interested parties via an amendment to the solicitation. Questions received after this date may not be answered.
f) Delivery& Submission Method
1) Mailed or Commercial Delivery of Proposals. Mailed or commercially delivered hard and soft copy proposals shall be sent to the address:
NAVAL SURFACE WARFARE CENTER CRANE DIV
K. WAGONER (812-854-3990)
BLDG 3373 ROOM 223 C110
300 HIGHWAY 361
CRANE IN 47522-5001
Proposals and product samples are due by the date and time in Block 9 on Page 1 of the solicitation.
Please notify the Contract Specialist at kristina.wagoner@navy.mil that a hard copy is being sent and provide a copy of the shipping label.
2) A soft copy of the proposal must also be provided on CD-ROMs/DVDs, read-only memory. Microsoft Office, word, presentation and spreadsheet products are preferred. Changes, as a result of negotiations, will be conformed on CD-ROMs/DVDs and have changed information clearly marked by a vertical line in the left margin.
3) NSWC Crane will NOT accept electronic submissions, all submissions must be mailed or commercially delivered.
4) Electronic files submitted with hard copy proposals shall be submitted on CD-ROMs formatted for Microsoft® Windows Office 2010™; text shall be prepared using Microsoft® Word ™ compatible applications; and spreadsheets, worksheets, or workbooks shall be prepared using Microsoft® Excel ™ compatible applications. The outside of the CD-ROM shall be clearly marked with the following:
Solicitation number Offeror’s name Contents of disk (Volume #).
All files shall conform to DOS™ naming conventions (e.g., no more than eight characters and a four character extensions); only the following extensions shall be used:
.docx for Microsoft® Word 2010™ files
.xlsx for Microsoft® Excel 2010™ files
.pdf for Adobe® Acrobat™ 6.0 files
.mpx for Microsoft® Project 2010™ files
Offeror shall not embed sound or video files into the electronic files. The disks shall be labeled to indicate the Offeror’s name, the solicitation number, date of submission, appropriate security classification markings, and associated volume number. Graphics, tables, photographs, and other data beyond the capability of Microsoft® Word ™, Microsoft® PowerPoint ™, Microsoft® Excel ™, or not in currently NMCI- supported applications may be submitted in Adobe Acrobat format. Electronic cost data must be submitted in Excel™ with formulas.
When submitting a proposal on electronic media, the offeror must ensure that the submission is readable, in the format specified in the solicitation, and has been verified as free of computer viruses.
Prior to any evaluation, the Government will check all files for viruses and ensure that all information is readable. In the event that any files are defective (unreadable), the Government may only evaluate the readable electronic files. Further, if defective (unreadable) media results in a significant deficiency in the offeror's proposal, the Government may consider the proposal incomplete and not consider such proposal for further evaluation.
The offeror must ensure that:
(i) The electronic and paper copies of its proposal submitted in response to the solicitation are identical;
(ii) It has verified that its electronic proposal is readable on the hardware and software operating system format specified below:
Windows 7 Enterprise
(iii) It has verified that the electronic proposals are free of computer viruses using standard commercial anti-virus software.
A proposal that fails to conform to the requirements above may be subject to interception or delay at Governmental electronic communications portals. This interception or delay may result in the proposal being lost, deleted, destroyed, or forwarded in such a manner that the proposal arrives at the target destination past the time and date of the deadline for submission established in the solicitation. In the event that a proposal is lost, deleted, or destroyed due to the offeror's failure to conform to the requirements above, such proposal will be considered to have never been delivered to the Government.
In the event that a proposal is delayed due to the offeror's failure to conform to the requirements above, the proposal will be treated as late in accordance with the provision of this solicitation entitled Late Submissions, Modifications, and Withdrawals of Proposals.
5) NSWC Crane will NOT accept facsimile proposals or proposals submitted via Navy Electronic Business Opportunities via Navy Electronic Commerce Online (NECO).
6) Hand delivered proposals will NOT be accepted. All offers must be mailed via USPS or by overnight courier. If using an overnight courier, it is the offeror’s responsibility to ensure that the courier service has access to NSWC Crane. Only approved couriers will be given access to the base to make delivery.
g) Restriction of Disclosure/Proprietary Information
1) If the offeror wishes to restrict the disclosure or use of its proposal, use the legend permitted by FAR
52.215-1(e). Individual subcontractor/vendor proprietary information may be submitted via separate binders/CDs. The information contained in these binders/CDs must be referenced (by binder title, page and section number as appropriate) within the main proposal where the information would have been included if it were not subcontractor/vendor proprietary. The information in these separate binders/CDs is subject to all other requirements of the RFP and must be well-marked to clearly indicate any special handling instructions.
h) Proposal Format
1) Format of the proposal volumes shall be as follows:
i. Text size shall be no smaller than what is equivalent to Microsoft Word, Times New Roman, 11 point, uncompressed font.
ii. Pages shall be single sided, one and one half spaced, with a minimum of one inch margins on all sides. Pages shall be dated and numbered sequentially by volume. A cover sheet should be bound in each book, clearly marked as to volume number, title, “original” or copy number, solicitation identification, and the offeror's name. The cover sheet will NOT be included in the page count for each volume.
iii. Each volume shall contain a glossary of all abbreviations and acronyms used with an explanation for each that will NOT be included in the page count for each volume.
iv. Elaborate format, color representations, and bindings are not desirable. Three-ring binders are preferred. The pages in the binders shall be easily removed and replaced to facilitate page changes.
Any pages that are changed (as the result of negotiations) should be of a different color (as specified by the Contracting Officer) and have changed information clearly marked by a vertical line in the right margin of the page and/or circling if changing data in a chart. The offeror shall indicate the new date on revised pages.
v. Legible tables, charts, graphs and figures shall be used when necessary to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 by 17 inches in size. Foldout pages shall fold entirely within the volume and count as one page. Foldout pages may only be used for large tables, charts, graphs, diagrams, and schematics; not for pages of text. For tables, charts, graphs, and figures, the text shall be no smaller than 8 point, Times New Roman. These items WILL be included in the page count for each volume.
i) Use of Navy Support Contractors
1) Government support contractors may assist the Source Selection Organization with administrative support only. The Source Selection Advisory Council (SSAC), the Source Selection Evaluation Board (SSEB) and the Cost/Price Analysis Team (CPAT) will be composed of Government employees.
The following firm(s) may provide administrative support to the source selection process, but will not evaluate proposals or have voting authority:
Design to Delivery/ The Mayvin Consulting Group / G5S / LLC, Logistics Support, Inc.
The Navy has both hardware and information exclusion clauses as well as proprietary data protection clauses in Navy contracts with the above listed firms. Offeror shall provide written notification to the PCO no later than ten (10) days after issuance of the RFP if Offeror does not consent to the use of any firm listed above in the proposal evaluation process. Otherwise, submission of a proposal will be considered consent to use of any firm listed above.
j) Proposal General Guidance
1) Offerors should assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the Offerors' proposals. However, the Government reserves the right to consider other information as part of the evaluation of the past performance factor. The Contractor should not presume that data previously submitted, or presumed to be known (e.g., data or services previously submitted or performed for the Government), will be considered as part of the evaluation if it is not submitted in the proposal. The Government does not assume the duty to search for data to cure problems it finds in proposals. Failure to conform to requirements of this solicitation may form the basis for rejection of the proposal.
General statements such as “the Offeror understands the method for performing the efforts (or any portion thereof) and can or will comply with the requirements of the solicitation” will not be considered sufficient. Generic statements such as "straight forward engineering techniques" and the "highest quality control procedures” will not be considered to be sufficient to demonstrate that the proposal meets the requirements of the solicitation.
The Offeror’s proposal must contain a precise description of all terms and conditions of the services and supplies offered and must address all topics described below. The information provided in the proposal shall appear in the same order as outlined herein.
In the event that any portion of the proposal is written by anyone who is not a bona fide employee of the firm submitting the proposal, a certificate to this effect shall be furnished which must be signed by an authorized official of the Offeror and shall indicate the person’s name, employment capacity, firm name, relationship of that firm to the Offeror, and which portion of the proposal was written by that person. This certificate requirement applies to both the prime and any subcontractors. The certification shall be provided in Volume I.
FACTOR I – TECHNICAL
A. Product Sample
Offerors shall provide 6 product sample(s) each, for the MK13 MOD7 and MK15 MOD 1 Sniper Rifle triggers that are being solicited. These product samples are right-hand only. No left-hand triggers will be required. Product samples will be evaluated by Naval Surface Warfare Center (NSWC) Crane personnel against the performance specifications identified in the solicitation and the Statement of Work (SOW). The Government may or may not choose to fully evaluate the product samples against all the requirements identified in the Performance Specifications. All product samples will be tested to the same specifications and SOW requirements. The Government requires the product samples to be representative of the production units.
Evaluation of the product sample(s) will consist of confirming that the product samples meet the following Go / No-Go criteria testing.
Go/ No-Go #1: Pull Weight testing. All six samples will be tested for their pull weight. Samples must have a pull weight within specification (3.5 - 4.5 lbs.) and must have a functioning safety with a true, two position, operation of fire and safe with no other perceived positions. If any of the six product samples do not meet these requirements the submission will no longer be considered for award.
Go/ No-Go #2: Drop testing. If all of the samples pass pull weight testing, then three triggers will be randomly selected from the six product samples to be used for initial screening via drop testing. During drop testing one fired primer is considered a failure. If any one of the three samples tested fails drop testing, the submission will no longer be considered.
Go/ No-Go #3: Endurance testing. If all three triggers pass drop testing, the other three samples that were not drop tested will be used for endurance testing. Endurance testing is function of the weapon 2,500 times. At 500 round increments the trigger will be tested for safety. When the safety is placed in the SAFE position it must not fire, when it is placed in the FIRE position it must fire. With rapid bolt manipulation it must not slam fire. If any one of the three samples tested fails endurance testing, the submission will no longer be considered.
Product sample(s) failing the Go/No Go requirements will be rejected and both the product samples and the written technical proposals will not be further evaluated for award. Product samples that successfully pass this initial evaluation will continue with the full evaluation.
If the product samples pass all Go/No-Go criteria, the three triggers that were used for endurance testing will be used for the full technical evaluation. The full technical evaluation shall consist of the samples being subjected to salt fog testing and evaluation of the Offerors’ written technical proposal against the factors and subfactors identified in the solicitation. The other considerations for award will be previous contract performance and proposed price.
Product samples shall be sent to the address below:
Naval Surface Warfare Center Crane Division UIC N00164 Bldg 2390, J. Scott Johnson, JXNN 300 Highway 361 Crane, IN 47522-5001 812-854-5857
Product samples will not be returned to the offeror after evaluation.
B. Written Technical Proposal (Volume I)
a) The Technical proposal volume of the proposal shall be submitted as Volume I, and shall be no more than 30 pages in total (excluding coversheet, glossary of terms and Table of Contents (TOC)).
b) No pricing information shall be contained in the Technical proposal.
c) Each Technical proposal shall enable Government evaluating personnel to make a thorough evaluation and arrive at a sound determination as to whether or not the proposal will meet the requirements of the government. Each technical proposal shall be specific, detailed, and complete as to clearly and fully demonstrate that the prospective contractor has a thorough knowledge and understanding of the requirements and has valid and practical solutions to technical problems. Statements that paraphrase the Statement of Work or attest that "standard procedures will be employed” are inadequate to demonstrate how the proposal complies with the requirements of the Statement of Work. Unsupported promises to comply with contractual requirements will not be sufficient. Proposals must contain supporting rationale for any statements relating to proposed performance. No assumptions will be made by evaluators regarding areas that are not addressed in the Offeror’s written proposal.
A hard copy of the following documentation in response to the factors and subfactors described in the solicitation shall be provided in such detail as to allow the Government to evaluate the proposal.
1) Written Performance Specification Compliance. Each offeror shall provide the following:
1. The Offeror shall provide its depth and breadth of technical expertise in the production of
MK13, MK15, or similar Trigger Assemblies by describing the primary processes and procedures the Offeror typically uses. A detailed description of how the prime contractor will plan to meet the requirements of the specifications shall be provided. The Offeror may provide examples of tasks performed in the functional areas to illustrate technical expertise by the Offeror or a proposed subcontractor (if so CLEARLY IDENTIFY WHETHER THE
OFFEROR PERFORMED THE TASK OR IDENTIFY WHICH SUBCONTRACTOR
PERFORMED THE TASK).
The Offeror shall provide a Compliance Matrix to cross-reference compliance with the technical requirements to the paragraph in the Offeror’s written technical proposal that demonstrates the Offeror’s ability to meet the requirements listed in the Performance Specification. This will facilitate Government verification that all items have been addressed.
2) Statement of Work Compliance
1. A detailed description of how the prime contractor will plan to meet the requirements of the statement of work shall be provided. The Offeror may provide examples of tasks performed in the functional areas to illustrate technical expertise by the Offeror or a proposed subcontractor (if so CLEARLY IDENTIFY WHETHER THE OFFEROR PERFORMED
THE TASK OR IDENTIFY WHICH SUBCONTRACTOR PERFORMED THE TASK).
The Offeror shall provide a matrix to summarize compliance with the technical requirements to the paragraph in the Offeror’s written technical proposal that demonstrates the Offeror’s ability to meet the requirements listed in the Statement of Work. The matrix shall be cross referenced to the Statement of Work by paragraph number and title to facilitate Government verification that all items have been addressed.
2. The Offeror shall discuss how it will implement a Configuration Management (CM) Program that complies with Section 3.8, Configuration Management, of the Statement of Work (SOW).
The Offeror shall demonstrate an understanding of the CM requirements for this acquisition and describe how it will implement a CM Program that will help manage baseline configuration and design changes. The Offeror shall address an ECP process, and how this will be implemented through its CM Program. The Offeror shall describe its experience implementing CM programs and provide examples of how it has successfully initiated CM on a previous program of similar complexity.
3. Offeror shall describe its quality management approach and define how it intends to ensure the production quality of the production systems. The Offeror shall describe how its quality management approach meets the requirements of ANSI/ASQC C9001.
4. Offeror shall demonstrate the capability to manage changes or deviations to the provided Technical Data Package (TDP) that may be submitted via the Engineering Change Proposal (ECP) process.
5. The Offeror shall describe its management information system for acquisition of material, material control, and monitoring delivery status of material previously ordered. The Offeror shall explain the automated qualities of its management information systems. This explanation shall include a discussion of the notification of problems, delay in material ordering/deliveries and how those problems and delays will be handled once they are identified by the system.
6. The Offeror shall identify key cost, schedule, performance and technical risks and why these were identified as risks. The Contractor shall discuss the risks, including dependencies and mitigation of each identified risk.
C. Production Delivery Schedule (Volume II)
1. Offeror shall demonstrate the capability to manufacture, assemble, test, and deliver production of MK 13 MOD 7 AND MK 15 MOD 1 Trigger Assemblies which will meet the specified performance requirements within the required delivery schedule.
2. Offeror shall provide production lead time for delivery of the trigger assemblies ordered under delivery orders and delivery schedules for subsequent remaining units and rate of delivery per month thereafter.
a. * Each * calendar days from the effective date of funded delivery order with * Each every 30 calendar days thereafter until complete.
NOTE: A proposed accelerated delivery schedule is advantageous to the Government. See Section F – Deliveries or Performance for the Government minimum required delivery schedule for all line items.
FACTOR II - Past Performance—Volume III-15 page limit
a) The Past Performance portion of the proposal shall be submitted as a part of Volume III, and shall be no more than a maximum of fifteen (15) pages for the narrative not including the matrix (Attachment (01) – Past Performance Matrix).
b) The offeror shall provide a minimum of three (3) and a maximum of five (5) past performance references on prior contracts that are recent and relevant to this requirement. See below for what constitutes a “recent” and “relevant” prior contract for purposes of this solicitation. The offeror shall contact past performance references directly and request that they complete and submit directly to the agency, the Past Performance Questionnaire (PPQ) (Attachment (02) – Past Performance Questionnaire) to the address in Block 7 of SF33, Page 1 of the Solicitation or to kristina.wagoner@navy.mil in accordance with the timeline set in Block 9 of SF33, Page 1 of the Solicitation. .
The completed questionnaires shall be sent directly from the reference POC to the contract specialist, Kristina Wagoner. Under no circumstances shall the questionnaires be returned to the offerors. Any information provided by the offeror’s references is subject to verification/validation by the Government during the evaluation process. The Government may make contact and follow up with the listed references identified on the Contractor Past Performance Data matrix. The Offeror may provide information on problems encountered on the identified contracts as well as the Offeror’s corrective actions.
c) Offeror shall provide a matrix (Attachment (01) – Past Performance Matrix) for each of the Past Performance Questionnaires (Attachment (02) – Past Performance Questionnaire) sent out listing the following:
1) Organization/Customer
2) Brief Description
3) Contract Number
4) Telephone & E-mail of Organization/Customer Point of Contact (POC)
5) Date PPQ being sent to POC and transmission method utilized
The offeror’s matrix shall contain a minimum of three (3) and a maximum of five (5) references to contracts that are recent and relevant to this requirement. Proposals must acknowledge PPQs have been sent to each POC listed in the Matrix. Failure to send the PPQ to each POC will be considered a proposal concern and may result in exclusion of the offeror’s proposal from consideration for award. The offeror shall exert its best efforts to ensure that the POC for each relevant contract submits a completed Present/Past Performance Questionnaire directly to the Government.
The offeror shall submit a description of a minimum of three (3) and a maximum of five (5) past performance references that are prime contracts or major subcontracts received, or in performance, during the past three (3) years which are relevant to the effort required by this solicitation. Commercial and state/local contracts may be included, if necessary.
The description shall include the following information in the following format:
1. Identify in specific detail for each contract listed, why or how you consider that effort relevant or similar to the effort required by this solicitation.
2. Your (and/or your subcontractor's) CAGE and DUNS numbers
3. Government or commercial contracting activity, address, and telephone number
4. Procuring Contracting Officer's (PCO's) name and telephone number
5. Government or commercial contracting activity technical representative, or COR; and telephone numbers
6. Government or commercial contract administration activity, and the name and telephone number of the Administrative Contracting Officer (ACO)
7. Contract number
8. Contract award date
9. Contract type
10. Awarded price/cost
11. Final, or projected final, price/cost
12. Original delivery schedule
13. Final or projected final, delivery schedule
14. A narrative explanation on each previous contract listed describing the objectives achieved and any cost growth or schedule delays encountered and any revised delivery schedules as well as the reason(s) the delivery schedule was revised. For any contracts which did not or do not meet original requirements with regard to cost, schedule, or technical performance, a brief explanation of the reason(s) for such shortcomings and any demonstrated corrective actions taken to avoid recurrence. The offeror shall also provide as an attachment a copy of any cure notices or show cause letters received on each previous contract listed and a description of any corrective action by the offeror or proposed subcontractor.
15. The reason(s) for such shortcomings and any demonstrated corrective actions taken to avoid recurrence. The offeror shall also provide a copy of any cure notices or show cause letters received on each previous contract listed and a description of any corrective action by the offeror or proposed subcontractor.
The offeror shall also provide the above required information for any and all contracts under which it has been terminated in whole or in part, for default or cause during the past 10 years, to include those currently in the process of such termination as well as those which are not similar to the proposed effort.
New corporate entities which lack past performance information, or for which such information is not available, shall submit the above required past performance data on its predecessor companies and its key personnel that will perform this contract who have relevant experience, which shall serve as the basis for the Government’s past performance evaluation of such Offerors. However, in addition to the other requirements in this section, the offeror shall discuss in detail the role performed by such persons in the prior contracts cited.
Offerors shall provide an outline of how the effort required by the solicitation will be assigned for performance within the contractor's corporate entity and among proposed subcontractors. Information required in the above paragraphs shall be provided for each proposed subcontractor who will perform a significant portion of the effort. "Significant" is defined for these purposes in terms of criticality of the subcontracted work to the whole. With regard to prime contract assignments that will be performed by the Offeror and not a proposed subcontractor, the Offeror shall indicate:
1) what internal corporate bodies/divisions will accomplish which portions of the effort,
2) whether or not those divisions were responsible for performance under the previous contracts for which the Offeror is providing information under the instant proposal, and
3) if those divisions have relocated since the accomplishment of previous cited contract efforts, a description of any changes arising from that relocation in terms of key personnel, processes, facilities and equipment.
Offerors shall include in their proposal the written consent of their proposed significant subcontractors to allow the Government to discuss the subcontractor's past performance assessment with the offeror during negotiations.
Note: Offerors are reminded that both independent data and data provided by offerors in their proposals may be used to assess offeror past performance. Since the Government may not necessarily interview all of the sources provided by the offerors, it is incumbent upon the offeror to explain the relevance of the data provided. The Government does not assume the duty to search for data to cure problems it finds in proposals. The burden of providing thorough and complete past performance source data remains with the offerors. Proposals that do not contain the information requested by this paragraph risk rejection or high performance risk assessment by the Government.
d) For the purposes of this solicitation, recent contracts are defined as those on which performance occurred during the last three (3) years. In determining relevancy, the offeror should consider the size, content, and complexity type and value of the contract, and the type of requirement compared to this solicited requirement. The offeror should also consider the level or amount of effort. The offeror must provide details (if its Past Performance reference is based upon “related technology” as a reference) including how the “related technology” is applicable to the solicited effort. Should the offeror not explain how the related technology is applicable, the reference may not be considered relevant. If an offeror has no current or relevant past performance information for itself, its predecessor companies, or its key personnel who will perform this contract, the Offeror should so state that in this volume and explain.
e) Each offeror shall submit present and past performance information for itself on projects of similar size, scope, and technical complexity. The Offerors may choose to submit present and past performance information for team members, or joint venture partners that have experience in projects of similar size, scope, and technical complexity with its proposal. The total number of past performance references for each offeror shall not exceed five (including any references submitted by subcontractors, team members and/or joint ventures). This volume shall provide a list of current and relevant contracts on which the offeror has performed in the format requested in the Proposal Requirements portion of this document. This information, as well as other information the Government may obtain elsewhere via Government databases (CPARs, PPIRs etc.) and other government agencies (DCMA, DCAA etc.), will be used to evaluate the offeror's past performance. The Government reserves the right to solicit feedback beyond what is identified in the questionnaire. NO CLASSIFIED PAST PERFORMANCE SUPPLEMENTS WILL BE ACCEPTED. The offeror may submit performance on classified programs as long as that information can be verified. If the offeror intends to submit in this manner the information that is classified (customer, contract number, etc.) should be marked “reserved” and the description/write up of the work performed shall remain unclassified. If the offeror cannot describe what work was accomplished in an unclassified manner the offeror cannot submit that program for Past Performance evaluation. Offerors are notified that the Government will evaluate the data provided in this volume and data obtained from other sources that is determined to be current and relevant to the effort at hand in the development of its performance risk assessments.
Factor III -- Price –Volume IV
a) The Signed RFP with Amendments,cover letter, and completed pricing matrices shall be submitted as
Volume IV. Each Offeror is required to submit the price volume separate from the other volumes, in the required number of copies and paper/electronic media format. Electronic copies of this volume shall be submitted on separate media, using MS Word or MS Excel, including all formulas. Electronic copies of any tables must be capable of being edited (i.e. not embedded pictures or screenshots) within MS Word or MS Excel. Excel files shall not include macros or pivot tables. In addition, all formulas and numerical relationships shall be retained and accessible in the MS Excel files. MS Excel or MS Word shall be used for supporting documentation, and failure to follow this instruction may result in rejection of the proposal.
b) Offerors shall specify break points for quantity discounts that would be more advantageous to the Government.
Note: The maximum total dollar value of the prospective contract(s) is anticipated Not-to Exceed $2.5 Million over a five-year period across all line items.
CLIN 0003 -Engineering Services- will be evaluated using a Not-To-Exceed amount of $500,000.
Offferors do NOT need to compelte pricing for this line item.
CLIN 0004 – Training- Offerors should propose pricing in accordance with SOW paragraph 3.4. NOTE:
Training (if needed) would be a one-time cost to provide instruction on how to properly install and adjust the triggers. If standard installation is applicable, and triggers are non-adjustable, training would not be needed.
NOTE: OFFERORS SHALL COMPLETE PRICING MATRICES IN SECTION B IN ITS ENTIRETY
EXCEPTIONS
Offerors are not encouraged to take exceptions to this solicitation, however, any exceptions taken to the specifications, statement of work, or terms and conditions of this solicitation shall be explained in detail and set forth in a cover letter as well as in the cost/price proposal. Offerors are to detail the particular section, clause paragraph and page to which they are taking exception. This information shall be submitted as a part of Volume I.
The Government is not required to concur with any exceptions, and offerors are placed on notice that exceptions, depending on their significance, may result in an offer being determined unacceptable.
(End of Summary of Changes)