AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

1. CLINS 0004 and 0005 are hereby added to this requirement.

2. CLINS 0006 - 0010 are option CLINS; added to this requirement.

3. Sublclins 0002AB, 0002AC, 0003AB and 0003AC have updated LAT/investigative unit quantities.

4. The offer is hereby extended to 2:00PM EST on 6 March 2019.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 35

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0010419RK074

X 9B. DATED (SEE ITEM 11)

20-Dec-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jan-2019

CODE

NAVSUP WEAPON SYSTEMS SUPPORT

BRIAN KECKLER, CODE N772.03

5450 CARLISLE PIKE

P.O. BOX 2020

MECHANICSBURG PA 17055

N00104 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0010419RK074

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

SUBCLIN 0002AB

The CLIN extended description has changed from:

Consists of: 1 lot 240 each net, plus an additional 35 each per lot for test. (32 each for test and 3 each for investigation purposes Ownership Code: 3

To:

Consists of: 2 lots 120 each net, plus an additional 23 each per lot for test. (20 each for test and 3

The pricing detail quantity has increased by 8.00 from 32.00 to 40.00.

SUBCLIN 0002AC

Consists of: 1 lot 240 each net, plus an additional 35 each per lot for test. (32 each for test and 3

Consists of: 2 lots 120 each net, plus an additional 23 each per lot for test. (20 each for test and 3

The pricing detail quantity has increased by 3.00 from 3.00 to 6.00.

SUBCLIN 0003AB

Consists of: 1 lot 170 each net, plus an additional 35 each per lot for test. (32 each for test and 3

Consists of: 2 lot 85 each net, plus an additional 16 each per lot for test. (13 each for test and 3

The pricing detail quantity has decreased by 6.00 from 32.00 to 26.00.

SUBCLIN 0003AC

Consists of: 1 lot 170 each net, plus an additional 35 each per lot for test. (32 each for test and 3

Consists of: 2 lot 85 each net, plus an additional 16 each per lot for test. (13 each for test and 3

The pricing detail quantity has increased by 3.00 from 3.00 to 6.00.

CLIN 0004 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

MBDT - JAU-99/A Initiator

FFP

Part Number MBDT41017X

JAU-99/A Cartridge Initiator Assy DIT 0.17 second

NET AMT

SUBCLIN 0004AA is added as follows:

0004AA 1 Set NSP NSP

TECHNICAL DATA

FFP

See DD Form 1423, Exhibit A

FOB: Destination

PSC CD: 1377

SUBCLIN 0004AB is added as follows:

0004AB 40 Each NSP NSP

PRODUCTION LOT TEST SAMPLES

FFP

Consists of: 2 Lots of 120 each net, plus an additional 23 each per lot for test. (20 each for test and 3 each for investigative purposes.)

Ownership Code: 3

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

SUBCLIN 0004AC is added as follows:

0004AC 6 Each NSP NSP

INVESTIGATIVE UNIT(S)

FFP

Consists of: 2 Lots of 120 each net, plus an additional 23 each per lot for test. 20 unique identification or a DoD recognized unique identification equivalent.

SUBCLIN 0004AD is added as follows:

0004AD 240 Each

MBDT

FFP

Part Number MBDT41017X

JAU-98/A Cartridge Initiator Assy DIT 0.17 Second

T-6 requirement

Ownership Code: 5 unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

CLIN 0005 is added as follows:

MBDT - JAU-98/A Initiator

FFP

Part Number MBDT52054X

JAU-98/A cartridge Initiator Assy DIT 0.54 second

SUBCLIN 0005AA is added as follows:

0005AA 1 Set NSP NSP

TECHNICAL DATA

FFP

See DD Form 1423, Exhibit A

SUBCLIN 0005AB is added as follows:

0005AB 40 Each NSP NSP

PRODUCTION LOT TEST SAMPLES

FFP

Consists of: 2 Lots of 120 each net, plus an additional 23 each per lot for test. (20 unique identification or a DoD recognized unique identification equivalent.

SUBCLIN 0005AC is added as follows:

0005AC 6 Each NSP NSP

INVESTIGATIVE UNIT(S)

FFP

Consists of: 2 Lots of 120 each net, plus an additional 23 each per lot for test. 20 unique identification or a DoD recognized unique identification equivalent.

SUBCLIN 0005AD is added as follows:

0005AD 240 Each

MBDT

FFP

Part Number MBDT52054X

JAU-98/A cartridge Initiator Assy DIT 0.54 second

T-6 requirement

Ownership Code: 5 unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

CLIN 0006 is added as follows:

OPTION MBDT - JAU-100/A Initiator

FFP

Part Number MBDT15050A

JAU-100/A Initiator

SAME AS ITEM 0001

(PROSPECTIVE OPTION QTY UP TO 100%)

STEPLADDER

Quantity Ranges # of Lots LAT Retains

2 -50 1 8 3

51 – 70 1 13 3

CLIN 0007 is added as follows:

OPTION MBDT - JAU-93/A Initiator

FFP

Part Number MBDT14030A

JAU-93/A Initiator

SAME AS ITEM 0002

Quantity Ranges # of Lots LAT Retains

91 - 150 1 20 3

151 – 240 2 40 6

CLIN 0008 is added as follows:

OPTION MBDT - JAU-94/A Initiator

FFP

Part Number MBDT15075A

JAU-94/A Initiator

SAME AS ITEM 0003

Quantity Ranges # of Lots LAT Retains

91 - 150 1 20 3

151 - 170 2 26 6

CLIN 0009 is added as follows:

OPTION MBDT - JAU-99/A Initiator

FFP

P/N MBDT41017X

JAU-99/A Cartridge Initiator Assy DIT 0.17 sec

SAME AS ITEM 0004

Quantity Ranges # of Lots LAT Retains

51-90 1 13 3

91 - 120 1 20 3

121 - 240 2 40 6

CLIN 0010 is added as follows:

OPTION MBDT - JAU-98/A Initiator

FFP

P/N: MBDT52054X

JAU-98/A cartridge Initiator Assy DIT 0.54 sec

SAME AS ITEM 0005

Quantity Ranges # of Lots LAT Retains

51 - 90 1 13 3

91 – 120 1 20 3

121 -240 2 40 6

The following have been modified:

SECTION B NOTES

SOLICITATION NOTES:

1. Faxed offers will NOT be accepted.

2. Because the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer.

3. This item is a CSI – Critical Safety Item.

4. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to brian.k.keckler@navy.mil. The size limitation of an email through the NAVSUP

WSS mail server is 10 MB. All files designated as .zip files will be stripped from any email sent.

Files larger than the server limitation may be segregated and sent via several emails as long as they are clearly identified as such. It is highly recommended that the Offeror request email delivery confirmation or other form of acknowledgement to verify that the proposal submission was received.

5. OPTION NOTES: If no unit prices are submitted for item 0006-0010, then the unit price submitted for item 0001-0005 will be considered the unit price for all stepladders. Offerors may submit varying prices for option stepladders. Any exception to the option may render your offer non- responsive. The option(s) will be included in the evaluation for award purposes. See Section

M.

6. The option validity period is 270 days after the Government notification of first article test approval or 270) days after date of contract when first article test is not required

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

SECTION C

SECTION C – DESCRIPTION AND SPECIFICATIONS (MAY 2005)

NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS

Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon Contractor anticipation of

Government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.

NOTE 2: SPECIFICATIONS THAT DO NOT INDICATE SPECIFIC REVISION LEVELS ARE TO BE

MADE TO THE REVISION LEVELS LISTED ON THE DEPARTMENT OF DEFENSE INDEX OF

SPECIFICATION AND STANDARDS IN EFFECT AT THE TIME OF SOLICITATION ISSUANCE.

1. DATA LIST / PART NUMBERS / DRAWING NUMBERS:

CLIN DATA LIST / PART OR DRAWING NUMBERS REVISION REVISION DATE

0001 SK18012-E24TB/MBDT15050A - -

0002 DWG 3315AS482/MBDT14030A - -

0003 DWG 3315AS483/MBDT15075A - -

0004 MBDT41017X

0005 MBDT52054X

2. SPECIFICATIONS:

CLIN SPECIFICATIONS REVISION REVISION DATE

0001 MIL-DTL-32093

0002 DTL-WS-35934

0003 DTL-WS-35957

0004 DTL-WS-35993 (OS)

0005 DTL-WS-35992 (OS)

a. EXCEPTION to Specification for clin 0001: (Approved RFV FY19-V005) - For details refer to Technical

Data Package (TDP).

b. EXCEPTION to Specification for clin 0002: (Approved RFV FY19-V001) - For details refer to

Technical Data Package (TDP).

c. EXCEPTION to Specification for clin 0003: (Approved RFV FY19-V002) - For details refer to Technical

Data Package (TDP).

3. For Contractor part number, Contractor SHALL submit Product Baseline in accordance with DD1423, sequence number A001 .

SECTION C – CONFIGURATION CONTROL: SAE EIA-649 (NAVY STOCK CLASS 1377) (APR 2017)

1. Configuration Control - The Contractor shall maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration shall be provided to the

Government in electronic format.

2. Variances – Requests for Variance (RFV) - RFVs shall be designated as Critical, Major, or Minor. RFVs shall be in Contractor format and shall include information outlined in SAE EIA-649 section 5.3.4.1 and SAE EIA-649-1 section 3.3.2. DD Form 1694 is the preferred format for RFV submissions.

Note: A copy of the preferred RFV Form DD Form 1694 is available at:

http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm

Additional guidance for completion of RFV can be found at the Attachment “Request for Variance Form 1694

Additional Guidance Rev A dated 4 30 18”. This attachment is incorporated by reference with the same force and effect as if contained herein.

The Contractor's assigned RFV number shall use the following numbering format:

a. The last four alpha-numeric characters of the contract number followed by a dash (-).

b. The letter "D", followed by consecutively assigned numeric characters beginning with 001.

Definitions: (See SAE EIA 649 and MIL-HDBK-61 for additional guidance on critical, major and minor classifications.)

Critical: Critical variances impact safety, health, environment, or other critical requirement. A departure from a requirement classified as critical in configuration documentation.

Major: Major variances have significant impacts such as performance or operational limits, structural strength, interchangeability, reliability, survivability, maintainability, durability of the item or repair parts, supportability, cost, effective use or operation, weight or size, or appearance. A departure from a requirement classified as major in configuration documentation.

http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm

Minor: Minor variances are issued when departure does not involve any of the factors listed for critical or major variance. Minor variances have little or no impact and are generally associated with non-functional factory defects that can be dispositioned locally as: “use as is” or “after suitable repair”. A departure from a requirement classified as minor in configuration documentation.

3. Engineering Change Proposal (ECP) - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. ECPs shall be designated as Major (Class I) or Minor (Class II). The use of DD Form 1692 is acceptable for ECP submissions. ECPs may also be prepared in Contractor format and shall include information outlined in SAE EIA-649 section 5.3.1.4. MIL-HDBK-61 provides additional guidance for preparation of ECPs.

The Contractor's assigned ECP number shall use the following numbering format:

a. The last four alpha-numeric characters of the contract number followed by a dash (-).

b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.

Definitions: (See SAE EIA 649 and MIL-HDBK-61A for additional guidance on Major (Class I) and Minor (Class

II) classifications.)

Major (Class I):

a. A change that affects specified and approved requirements for product attributes, including safety, reliability, and supportability.

b. A change, after establishment of the product baseline, that affects compatibility with interfacing products, including such products as test equipment, support equipment, software, and products furnished by a customer or that affects one or more of the following::

- required calibration to the extent that product identification should be changed

- interchangeability or substitutability of replaceable products, assemblies, or components

- change to add a previously non-qualified supplier, where supplier selection is specified

- requires retrofit of delivered products

Minor( Class II): Affects configuration documentation (released design information), product or processes but does not affect Major Change Criteria.

4. ECP changes to Contractor drawings: Minor (Class II) and Major (Class I) ECP changes shall be approved by the

Navy Configuration Control Board (CCB) and technical approval authority prior to implementation. Contractors may use their own numbering format for ECP changes to Contractor drawings. Minor (Class II) ECP changes are defined as changes that do not affect the form, fit, or function. Minor (Class II) affects configuration documentation (released design information), product or processes but does not affect Major Change Criteria. Major (Class I) ECP changes are defined as changes that affect the form, fit, and/or function, and/or requirements, performance, interoperability, supportability, maintainability, cost, safety, addition of a vendor, or a vendor moves facility and the item has not been qualified at that site.

Definitions:

Form: the shape, external size, and marking which uniquely characterizes an item.

Fit: the ability of an item to physically interface or interconnect with and become an integral part of a higher level assembly.

Function: the action[s] that an item is designed to perform including performance, durability and safety.

The following are examples of Major (Class I) changes with regard to function

a. Change to energetic material

b. Change to component material or material properties

c. Change to electrical characteristics.

d. Change in ballistic performance.

If the Navy technical approval authority does not approve the ECP submitted by the Contractor, then the Contractor is required to revert to the Government approved revision of the drawing per the approved product baseline or to the revision used in the prior lot accepted by the Government. The Government reserves the right to invoke First

Article Testing (FAT) per paragraph 2 of “Section E-CAD/PAD Inspection and Acceptance”, or require the

Contractor to undergo qualification testing.

5. Contractors do not have MRB authority. Authorization to accept or rework any nonconformance is specifically retained by the Contracting Officer. The contractor's MRB shall not make any "use-as-is" or "rework" disposition on any nonconformance, and the MRB recommendations shall be submitted per paragraph six (6) below.

6. The Contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Local DCMA

QAR, and the technical activity below:

a. Local DCMA QAR

b. NAVSUP WSS Contracting Officer

c. NSWC IHEODTD CAD/PAD Division Acquisition Management Specialist (AMS)

7. Technical approval authority for RFVs and ECPs is NSWC IHEODTD, Lead CAD/PAD Engineer, Code E2CE.

8. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon

Systems Support.

SECTION C - IDENTIFICATION OF COVERED DEFENSE INFORMATION (252.204-7012) (OCT 2016)

1. In accordance with the DFARS clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber

Incident Reporting, the Contractor shall provide adequate security for all government and contractor owned

Technical Data Packages (TDPs), drawings and item detail specifications on all covered defense information systems that support the performance of work under this contract.

SECTION D - PACKAGING AND MARKING

SECTION D

SECTION D – UID CAD/PAD ITEM MARKING INFORMATION

The Attachment “CAD/PAD Item Marking Instruction Version 1.4”, prepared by the CAD/PAD Joint Program

Office 784 CBSG/GJ Code E25MA, NSWC IHEODTD Indian Head to include sample data is incorporated by reference with the same force and effect as if contained herein.

NOTE: UID marking is REQUIRED for investigative units (also known as retains).

SECTION D – PACKING, MARKING, AND TRANSPORTATION (APR 2017)

1. Preservation, packaging, packing, and marking shall be in accordance with MIL-STD-129, MIL-STD-2073, CFR

49 171-178, MIL-STD-1320, DLAR 4145.41.

2. Packaging and packing for production lots, first article samples and lot acceptance samples shall be IAW the following by item:

CLIN QUP IAW

0001-0003 1 SPI PHST-293

0004-0005 1 TBD

NOTE: Non-standard packaging letter to be provide later and IHC approving packaging configuration

NOTE: Quantity per Unit Pack (QUP) is defined as the first tie, wrap, or container applied to a single item, or a quantity thereof, or to a group of items of a single stock number, preserved or unpreserved, which constitutes a complete or identifiable package.

3. Labels for Human Readable Information (HRI) and Machine Readable Information (MRI) shall meet the requirements for a Grade A, Style 2, Composition (b) label as specified in MIL-PRF-61002. The performance requirements for solvent and detergent resistance are not required. The label should be the pressure sensitive adhesive type.

4. Human Readable Information (HRI) markings shall be applied to ammunition, explosives containers and units loads IAW the applicable provisions of MIL-STD-129.

a. At a minimum, inner container markings for CLIN 0001 - 0005 shall include:

National Stock Number and (DoD) Code: (see Section “B” for applicable CLIN)

Item Nomenclature: (see Section “B” for applicable CLIN)

Item Assembly Drawing Number: (see Section “B” for applicable CLIN)

Quantity: As Applicable

Lot Number: IAW MIL-STD-1168

Serial Number: Required ( x ) N/A ( )

b. At a minimum, outer container markings for CLIN 0001 - 0005 shall include:

National Stock Number and (DoD) Code: (see Section “B” for applicable CLIN)

Item Nomenclature: (see section “B” for applicable CLIN)

Item Assembly Drawing Number: (see Section “B” for applicable CLIN)

Quantity: As Applicable

Lot Number: IAW MIL-STD-1168

Serial Number: Required ( x) N/A ( )

Gross Weight and Cube: As Applicable

DoD Contract Number: As Applicable

TABLE 1: United Nations Shipping / Storage Information

CLIN NUM

UN PROPER SHIPPING

NAME

UN

NUMBE

R

HAZARD

CLASS

COMPA.

CODE

NET

EXPLOSIVE

WT (lbs)

EX

NUMBER

5. Machine Readable Information (MRI) markings shall be applied to ammunition, explosive containers and unit loads IAW the following coded elements of data from MIL-STD-129. MRI labels shall able to be read and interpreted by automatic bar code reading devices (scanners). MRI markings shall contain the minimum data elements identified below:

a. Inner container:

(N) National Stock Number: (see Section “B” for applicable CLIN)

(4R) Department of Defense identification code (DODIC): (see Section “B” for applicable CLIN)

(1P) Item Assembly Drawing Number: (see Section “B” for applicable CLIN)

(1T) Lot Number: IAW MIL-STD-1168

(S) Serial Number: Required ( x) N/A ( )

b. Outer container:

(N) National Stock Number: (see Section “B” for applicable CLIN)

(4R) Department of Defense identification code (DODIC): (see Section “B” for applicable CLIN)

(1P) Item Assembly Drawing Number: (see Section “B” for applicable CLIN)

(7Q) Quantity: As Applicable

(1T) Lot Number: IAW MIL-STD-1168

(S) Serial Number: Required (x) N/A ( )

NOTE: The parenthesis surrounding the data elements are NOT encoded in the 2D(PDF417) bar code.

6. The Contractor shall perform testing and acquire data necessary to support compliance with Performance

Oriented Packaging (POP) requirements of hazardous materials as defined in Title 49, Code of Federal Regulations

(CFR), the International Maritime Organization’s International Maritime Dangerous Goods (IMDG) Code, and the

International Civil Aviation Organization (ICAO) Technical Instructions for the safe transport of hazardous goods.

Testing shall be performed in accordance with American Society for Testing and Materials (ASTM) D4919, Testing of Hazardous Material Packaging. The Contractor shall provide a Performance Oriented Packaging (POP) Test

Report in accordance with DI-PACK-81059. The POP Test Report shall be in accordance with the contract data requirements list (CDRL) DD FORM 1423, sequence number A002. The POP Test Report shall include the contract number, DODIC, item nomenclature, National Stock Number (NSN) of the item and the Government drawing and/or contractor’s Part Number. If packaging used exceeds a single periodic retest period as regulated in 49 CFR 178.601 or comes from multiple manufacturers, multiple or additional POP Test Reports covering all periods of manufacture/manufacturers are required. A printed copy of the applicable POP report shall be included with each shipment.

a: POP Test Report is not required for non-explosives and non-regulated items.

b: Foreign Military Sales (FMS) Shipments: As applicable, all outer containers should be clearly marked with the FMS Case Designation, Requisition Number and Project Code, and Country Specific EX Numbers for

NOA required shipments- See Section "F" for proper identification.

7. Traceable Seals for shipping containers:

a. Traceable seals are required for delivery of all "ready to issue" (condition code A, B, C, or N) or "pending acceptance" (condition code D) ammunition and ordnance items, including inert configuration items.

Traceable seals provide an indication of security and certification of material serviceability and apply to more than just hazardous materials.

b. The Contractor shall ensure traceable seals are properly affixed in accordance with these requirements:

(1). Traceable seals are applied to each shipping and storage container at the time of packaging. The shipping container will normally be the outer container.

(2) WIRE SEALS: A wire seal is a wire length with an aluminum disk or pellet which is crimped or crushed using a die which imprints a “U.S.” symbol on the disk/pellet. Wire seals are applied to containers having provisions or means for application of wire seals, e.g., metal containers, drums, or cradles and wood boxes with hinged covers and/or latches.

(3) LABEL SEALS: A label seal is a nonmetallic label with a pressure sensitive backing and which is printed or stamped with a “U.S.” symbol. Label seals are applied to containers which do not have provisions or means for application of wire seals, e.g., fiberboard or wood boxes without hasps or latches. Label seals shall be applied such that the label must be cut or defaced in order to open a container. Adhesives shall adhere well enough to prevent peeling during shipping conditions and well enough to prevent lifting and replacement of the label. Particular consideration shall be given to label seals required to adhere to wood and fiberboard surfaces.

8. Restrictions Involving Non-Manufactured Wood Packaging (NMWP) and Pallets (per Defense Logistics Agency

Directive subpart 47.305-1(c)(90): “All wooden pallets and wood containers produced of non-manufactured wood shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 minutes) material and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with Non-manufactured Wood Packing Policy and Non-manufactured Wood Packing Enforcement Regulations, both dated

May 30, 2001.”

SECTION D – AMMUNITION LOT NUMBERING: MIL-STD-1168 (APR 2017)

Ammunition lot numbering shall be in accordance with MIL-STD-1168 (and MIL-DTL-85097 for Propellant

Actuated Devices). The applicable lot interfix series number will be furnished in the signed contract.

*Lot number formulation shall consist of the following:

a. The Contractor symbol: Only approved symbol is to be used. Requests for approval of marking symbol are to be submitted via the Government Inspector. Refer to MIL-HDBK-1461 for guidance, which is available on the WARP Website.

b. The year and the alpha code designating the month in which final assembly for end item of the representative lot begins (CADs only)

c. The assigned lot interfix number (provided by NSWC IHEODTD at time of award).

d. The sequence number shall be consecutive for each production lot manufactured (sequence number shall not be repeated).

e. Serialization of sub-assembly or end item under this contract shall meet the requirements of MIL-STD-1168.

Serial numbers Shall Not be repeated on the same part numbered item regardless of changes in lot numbers.

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0004:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A N/A

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AA:

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0004AD:

The following Acceptance/Inspection Schedule was added for CLIN 0005:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AA:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AB:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AC:

The following Acceptance/Inspection Schedule was added for SUBCLIN 0005AD:

The following Acceptance/Inspection Schedule was added for CLIN 0006:

The following Acceptance/Inspection Schedule was added for CLIN 0007:

The following Acceptance/Inspection Schedule was added for CLIN 0008:

The following Acceptance/Inspection Schedule was added for CLIN 0009:

The following Acceptance/Inspection Schedule was added for CLIN 0010:

SECTION E

SECTION E – PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING) (APR 2017)

1. Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001AA – 0005AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423

0001AB - 0005AB Lot Accept. Testing Contractor Government Contractor Government

0001AC - 0005AC Investigative Units Contractor Government Contractor Government

0001AD – 0005AD Production Units Contractor Government Contractor Government

If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:

Packaging House

Address

2. Test samples are required from each production lot and are to be tested in accordance with the approved test plan.

A production lot shall consist of net deliverable quantity, plus additional lot test sample/investigative units and any retained sample units for investigative purposes as may be required by Section B.

3. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative

(QAR) with all documentation required by section B. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The samples shall be selected, at random, from each production lot, by the QAR within 2 workdays for resident QARs, or 7 workdays for non-resident QARs after presentation of the lot.

4. Sample units removed for testing from different lots shall not be commingled.

5. Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by a representative of the engineering activity and/or the cognizant QAR. The Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the engineering activity, and the QAR, at least 20 calendar days prior to the planned testing date. If testing is cancelled within the 20 calendar day period, the contractor shall provide notification to the Contracting

Officer, with concurrent notification to the engineering activity. At a minimum, cancellation notification shall be sent no later than two days prior to planned test date

NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and contracting officer shall be notified within 24 hours. A

Government representative shall be allowed to participate in the failure investigation in accordance with applicable CDRLs. Contractor testing shall resume upon notification by the Contracting Officer.

6. Disposition of Production Lot Test Samples –

Production Lot Testing Samples are subject to destructive testing. These units cannot be used to meet the total contract quantity.

7. A production lot test report is required and shall be forwarded in accordance with the DD 1423 sequence number

A003 requirements to the address shown in Block 14. The test report shall include all results of testing conducted in accordance with the approved test plan.

8. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required report approved, and the lot has been released for service use. The retained samples, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.

9. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification shall be made to the

Contractor within 20 calendar days after the Contracting Officer receives the production lot test report(s) and all applicable CDRL requirements. Upon receipt of the written approval accepting a production lot(s) and final approval of the Material Inspection Receiving Report in IRAPT, the Contractor shall ship the production lot(s) as soon as possible and no later than fifteen (15) calendar days after receipt of such notice. Final acceptance of the production lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.

a. Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.

b. A notice of conditional approval may state any further action required of the Contractor. In the event the test sample fails to meet the requirements of the specification or drawing, the Contractor shall submit a Failure

Analysis and Corrective Action Report (DD Form 1423, sequence number, A004) with all associated costs and expenses to be borne solely by the Contractor.

(1) At a minimum, the following is required:

(a) Failure date

(b) Failed part number (e.g. national stock number (NSN), logistics control number, work unit code)

(c) Test or mission being performed when the failure occurred(LAT/FAT)

(d) Failure symptoms and description of detection or diagnosis methods (e.g.

Built In Test)

(e) Failure effects (e.g. none, degradation, abort)

(f) Repair action (e.g. remove/replace)

(g) Failure mode description

(h) Failure mechanism/cause of failure

(i) Contributing factors, including multiple factor interactions, or secondary effects of the failure

(j) Corrective action required to mitigate the failure mode, including:

- Identification of the failure mode

- The recommended process or process control changes, when the failure cause is due to workmanship defects

-Proposals for retrofit of all equipment already delivered or assembled, including recommended effectivity, in accordance with the contract

- Disposition of all defective material and material rendered obsolete because of any necessary redesign, to assure their exclusion from production items

-Identification of previous functional and environmental qualification tests, if any, invalidated by the corrective action changes and recommendation of those tests that should be repeated, in accordance with the terms of the contract, to demonstrate the corrective action’s effectiveness

c. A notice of disapproval may cite reasons for such. If the production lot test report(s) is disapproved by the

Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing. This direction may be given by the Contracting Officer in the notice of disapproval. The

Contractor shall furnish such additional test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and report(s), the

Contracting Officer may, at his/her discretion, equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test(s).

10. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the

Contracting Officer disapproves any production lot test report(s), the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the

Contractor of the responsibility to meet the delivery schedule for production quantities.

SECTION E – INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES (MAR 2005)

1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the

Contract Data Requirements List (DD Form 1423, sequence number, A005). The test plan shall be submitted within sixty (60) calendar days after contract award date. The Acceptance Test Plan shall identify that test fixtures are available for use at the Contractor’s Facility.

2. Notification of test plan approval, conditional approval, or disapproval shall be provided via IRAPT. This notification may be made within 30 calendar days after receipt of the Test Plan/Procedure.

3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.

4. A notice of conditional approval may state any further action required of the Contractor.

5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the

Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government may take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.

6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default.

However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.

7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:

Approved by__________________________ Date of approval___________________

Contract number and Contractor under which plan/procedure was approved__________________.

Test Plan number, revision date and NSN for which the item was previously approved_____________.

8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.

SECTION E – CAD/PAD INSPECTION AND ACCEPTANCE (APR 2017)

1. Inspection and acceptance shall be in accordance with MIL-DTL-32093, DTL-WS35934, DTL-WS-35957, SK18012-E24TB/MBDT15050A, DWG 3315AS482/MBDT14030A, and DWG 331AS483/MBDT15075A.

2. The Government reserves the right to invoke the requirement for First Article Testing (FAT) if there is a change in process, facilities, materials, equipment, or production of the item; if two years or more have passed since the item was last manufactured, or if the item has developed a problem. “Process” is defined as the steps or tasks that are performed to create a product. “Facilities” is defined as location or buildings where the process(es) are performed to manufacture a product. “Materials” is defined as all the raw ingredients that are used in the manufacturing of the item. “Equipment is” defined as all the tools used to manufacture a product. “Production” is defined as to make, manufacture, or create a product. If there is a desire to have predetermination of a potential change to the process, facilities, materials, equipment, or production of the item a proposal describing the change and any supporting documentation should be written in a formal letter and provided to the Contracting Officer. The

Contracting Officer will provide the letter with the supporting documentation of the proposed changes to the cognizant engineering activity. A formal response on the determination of whether an FAT is required may be provided within fifteen days (15) business days after the receipt from the Contracting Officer.

3. The Contractor shall provide and maintain a quality program acceptable to the Government and modeled on ISO

9001:2015 or an equivalent quality system. If the quality program is not modeled on ISO 9001:2015 the offeror/prospective Contractor shall indicate the quality system proposed along with how it is equivalent, under separate letter submitted with the offer/proposal.

ISO 9001:2015Other

This quality system along with program specific production documentation shall be made available for review by the Government’s representative upon request, at the Contractor’s facility at no cost to the Government.

4. Due to the critical nature and safety application of these items, the Contractor and the QAR are cautioned that it is mandatory to ensure the correct identification and nomenclature are assigned for all items and shipping containers prior to shipment including CAGE codes. CAD/PAD Devices are exempt from MIL-STD-129 shelf life markings on packaging; however, they shall have a minimum of 85% of the shelf life remaining at time of delivery. Any delivery from a contractor not having at least 85% shelf-life remaining shall normally be considered non-conforming.

NOTE: The shelf life for CLIN 0001-0003 is: 84 months.

NOTE: The service life for CLIN 0001-0003 is: 48 months.

NOTE: The shelf life for CLIN 0004-0005 is: 84 months.

NOTE: The service life for CLIN 0004-0005 is: 48 months.

5. Radiographic equipment and procedures shall meet the standards stipulated in the latest revisions of the following specifications: ASTM E1742, ASTM E748, and ASTM E545.

6. Radiographers shall be qualified and certified level II or III in accordance with the requirements described in specification NAS 410.

7. In order to fulfill contractual requirements, the Contractor must submit acceptable radiographs. Radiographs should be reviewed by a Level II or Level III certified radiographer in accordance with NAS 410. Radiographs not conforming to the requirements specified herein will not be reviewed by NSWC IHEODTD. Disposition of non-conforming radiographs will be by mutual agreement of the parties.

8. Radiographic Test Technique (RTT) shall include variables which affect the exposure, such as x-ray source, kV or MeV (voltage), mA (current), SFD (Source to Film Distance), or SDD (Source to Detector Distance), exposure time, and film type/detector, and include a diagram or photo of the test setup.

9. Representative Quality Indicators (RQI) should be used on radiographic film or digital images for all CAD/PAD devices. The RQI (also known as a defect standard) contains a known defect (i.e. missing explosive charge, missing

O-rings, etc.) placed next to a good unit for comparison, to aid in interpretation. Radiographic test technique shall include RQI to be used and RQI placement.

Radiographic Test Technique for X-rays and N-rays, as applicable, shall be submitted with the First Article Test

(FAT) samples to the activity cited below. If there is no FAT requirement, the radiographic test technique for X-rays and N-rays, as applicable, shall be submitted to the activity below as described in paragraphs 9a and 9b herein.

NSWC IHEODTD

ATTN: AMS Per Section H

INDIAN HEAD MD

a. Test technique information for ALL radiographs is specified in section 6 of ASTM E1742, refer to DD

Form 1423 sequence number A006. The radiographic images shall display a number of units representative of a production lot. Units shall be positioned on the radiographic plate at the areas of minimum and maximum geometric distortion.

10. The Contractor shall submit radiographic film as marked (X) below:

X-RAYS ( per applicable spec )

N-RAYS ( per

ASTM E748 )

Sample / LOT Description

First Article Sample

X Lot Acceptance Test Samples

X Production Lot Units

Explosive Sub-Assemblies (i.e., NON-GFP CTGS, Booster Sleeves, etc.)

a. Radiographs of Production Lot Units shall include Lot Acceptance Testing (LAT) samples.

11. Radiographs may be produced using film (conventional x-ray), or non-film (digital) techniques such as Digital

Detector Array (DDA), or Computed Radiography (CR), with the understanding that the Contractor must be qualified and given prior approval to use digital radiography by NSWC IHEODTD. A qualification plan must be submitted to the Level III Radiographer at NSWC Indian Head EODTD for review prior to qualification of the digital x-ray system. Once the qualification plan has been reviewed and approved, the Level III Radiographer at

NSWC Indian Head EODTD will conduct a site visit (i.e. audit) to witness the qualification of the digital x-ray system. The results of the tests performed during the digital x-ray system qualification will be documented in a qualification document, which will be submitted to the Level III Radiographer at NSWC Indian Head EODTD. An official approval letter will then be issued by the Commanding Officer, NSWC Indian Head EODTD, which authorizes the use of the digital system. Follow up audits at regular intervals (i.e. annually) may be conducted to assure the long term stability and performance of the digital x-ray system. If digital radiographs are submitted, they shall be in the form of raw data that is Digital Imaging and Communication in Nondestructive Evaluation

(DICONDE) compliant. In addition to the raw DICONDE data, 16 bit Tagged Image Format (TIF) images of the digital radiographs must be submitted. The qualification of non-film techniques will be done IAW the latest versions of standards referenced in the latest version of ASTM E1742 (currently ASTM E1742/E1742M-12), such as ASTM

E2698 and ASTM E2737 (for the qualification of Digital Detector Array (DDA) detectors), or ASTM E2033 and

ASTM E2445 (for the qualification of Computed Radiography (CR) systems).

12. Notification of approval/rejection of the RTT shall be made by the Contracting Officer after receipt at NSWC

IHEODTD in iRAPT. Written notification of rejection will be provided by the Contracting Officer. Approval of the

RTT must be received prior to performing radiographic inspection of the production lot units. The Contractor shall then follow the approved technique to produce subsequent radiographs in accordance with the approved RTT. Any change in the approved radiographic technique or equipment requires submittal and approval of new RTT at the

Contractor's expense.

a. There is hereby created an option for the Government to waive the requirement for submission of a RTT. The

Contractor may only request a waiver for the submission of the RTT as long as the Cognizant Engineering

Organization (CEO), which is NSWC IHEODTD, has an approved RTT on file from a previous contract, and the x-ray equipment or RTT has not changed since the referenced contract. The following information shall be furnished by the Contractor when submitting the waiver for RTT:

Approved by ____________________________ Date of approval __________________

Contract number under which RTT was approved ________________________________

b. If the submission of the RTT is waived, the previously approved technique shall apply to the contract.

c. If the Contractor requests waiver of submission of the RTT after time of award, an offer of adequate consideration shall accompany the request.

13. An acceptable radiographic image is required for each line item on this contract.

14. When submitting the radiographic images, the Contractor shall also submit a report of radiographic inspection.

This report shall clearly indicate the units subjected to radiographic inspection by the following data:

Item Nomenclature and DODIC Government drawing or part number

Complete lot number Span of serial numbers displayed

Complete contract number Nonconforming units by serial number and reason for rejection

Missing units by serial number

Any units found to be nonconforming shall be clearly identified. The specific nature of the non-conformance shall be cited, as well as any assignable cause or analysis related to the occurrence.

15. When undergoing radiographic inspection, each unit in the sample or lot shall be permanently serialized in consecutive numerical order per MIL-STD-1168 before radiographic inspection. Serial numbers shall not be repeated on items with the same part number regardless of changes in the lot number. The numbering shall be from left to right, top to bottom with the first item on the left of each row having the lowest serial number. All annotation must be represented using a method which leaves a permanent image on the film, such as placing lead letters on the film cassette or digital detector prior to each exposure. It is NOT acceptable to use adhesive labels, or to write annotation on the film using a marker or other writing instrument. Units that are missing on a radiograph must be indicated by identifying the serial number of the unit immediately preceding, and immediately following, the missing unit(s).

All units shall be arranged on trays or boards in consecutive numerical order.