N0010418RF053_-_Hydro_Accumulators.pdf

PDF 1 MB Posted

Attached to
HYDRAULIC ACCUMULATOR REPAIR IDIQ
Solicitation number
N0010418RF053
Issued by

View the file

Other files

File Type Posted
N0010418RF053.U0005.pdf PDF
N0010418RF053.U0004.pdf PDF
N0010418RF053.U0003.pdf PDF
N0010418RF053.U0002.pdf PDF
N0010418RF053.U0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 02:00 PM local time 17 Sep 2018

X

A

X B

X C X D

EX

X

G

F 53 - 62

63 - 65

X H 66

C. E-MAIL ADDRESS

AMBER.L.MILLER@navy.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

DO-A3 1 66

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00104 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

Building 410 conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

AMBER MILLER 717-605-3261

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 9

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

10 - 16

17 - 25

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

27 - 31 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 32 - 35 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 36 - 38 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code)

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

39 - 51

PART II - CO NTRACT CLAUSES

NAVSUP WEAPON SYSTEMS SUPPORT

AMBER MILLER, CODE N743.20

5450 CARLSLE PIKE

MECANICSBURG PA 17050

717603261

7176052807FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

N0010417YRA00

5. DATE ISSUED

14 Aug 2018

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0010418RF053

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 100 Each

HYDRAULIC ACCUMULATOR

FFP

Pricing by Ordering Year (OY)

OY1 1 DADC - 365 DADC $_________

OY2 366 DADC - 730 DADC $_________

OY3 731 DADC - 1,095 DADC $_________

OY4 1,096 DADC - 1,460 DADC $_________

OY5 1,461 DADC - 1,825 DADC $_________

Inspection/Acceptance: S/S

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

NSN: 2S 2030-01-460-3637

PURCHASE REQUEST NUMBER: N0010417YRA00

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0002 100 Each

HYDRAULIC ACCUMULATOR

FFP

Pricing by Ordering Year (OY)

OY1 1 DADC - 365 DADC $_________

OY2 366 DADC - 730 DADC $_________

OY3 731 DADC - 1,095 DADC $_________

OY4 1,096 DADC - 1,460 DADC $_________

OY5 1,461 DADC - 1,825 DADC $_________

Inspection/Acceptance: S/S

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

NSN: 2S 2030-01-460-3638

PURCHASE REQUEST NUMBER: N0010417YRA00

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0003 100 Each

HYDRAULIC ACCUMULATOR

FFP

Pricing by Ordering Year (OY)

OY1 1 DADC - 365 DADC $_________

OY2 366 DADC - 730 DADC $_________

OY3 731 DADC - 1,095 DADC $_________

OY4 1,096 DADC - 1,460 DADC $_________

OY5 1,461 DADC - 1,825 DADC $_________

Inspection/Acceptance: S/S

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

NSN: 4Y 3040-01-057-9152

PURCHASE REQUEST NUMBER: N0010417YRA00

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0004 100 Each

HYDRAULIC ACCUMULATOR

FFP

Pricing by Ordering Year (OY)

OY1 1 DADC - 365 DADC $_________

OY2 366 DADC - 730 DADC $_________

OY3 731 DADC - 1,095 DADC $_________

OY4 1,096 DADC - 1,460 DADC $_________

OY5 1,461 DADC - 1,825 DADC $_________

Inspection/Acceptance: S/S

NOTE: The requirements in DFARS 252.211-7003, Item Identification and

Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Origin (Shipping Point)

NSN: 4Y 3040-01-057-9154

PURCHASE REQUEST NUMBER: N0010417YRA00

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0005 UNDEFINED Set

Contract Data Requirements List Technica

FFP

TECHNICAL DATA

FFP

See DD Form 1423, Exhibit A

FOB: Destination

PURCHASE REQUEST NUMBER: N0010417YRA00

MAX

NET AMT

SECTION B

Solicitation Notes:

1. NECO bids will NOT be accepted.

2. Faxed offers will NOT be accepted.

3. Since the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer.

4. All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.

5. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to the email indicated below or by submission through AMRDEC SAFE at the URL listed below.The size limitation of an email through the NAVSUP WSS mail server is 10 MB. All files designated as .zip files will be stripped from any email sent. Files larger than the server limitation may be segregated and sent via several emails as long as they are clearly identified as such.

Email:

AMRDEC

amber.l.miller@navy.mil https://safe.amrdec.army.mil/safe/Welcome.aspx

6. The resultant contract will be indefinite delivery, indefinite quantity (IDIQ) contract for all items listed in Section B. The minimum guaranteed quantity is 5EA items in any combination of the items listed in

Section B. The minimum guarantee will be satisfied on the initial order. The below estimated quantities are shown for the purposes of pricing and evaluation only, and the Government is under no obligation to purchase any amount beyond the minimum guarantee amount.

mailto:jill.sabol@navy.mil https://safe.amrdec.army.mil/safe/Welcome.aspx

Est.

Item # QTY/Yr NSN ITEM NOMENCLATURE

0001 12 2S 2030 01 460 3637 ACCUMULATOR

0002 12 2S 2030 01 460 3638 ACCUMULATOR

0003 14 4Y 3040 01 057 9152 ACCUMULATOR,HYDRAUL

0004 14 4Y 3040 01 057 9154 ACCUMULATOR,HYDRAUL

7. The maximum quantities listed in CLINs 0001 through 0005 are for the purposes of evaluation only. The maximum quantity that may be ordered over the life of the resultant contracts, in any combination of the items listed in Section B is 400EA.

B01 - SERVICES, MATERIALS, AND PARTS TO BE FURNISHED

(a) The Government may order, in the manner provided elsewhere herein, the following types of effort:

(1) Repair and/or Modification: The contractor shall furnish effort including labor, material, and facilities as may be required to repair and/or modify the ordered quantities of spare repairable assemblies. The spare repairable assemblies to be repaired and/or modified under this contract constitute “Government Property” as defined in FAR clause 52.245-1 “Government Property” or 52.245-1 Alternate I, as applicable. Repair and/or modification of spare repairable assemblies will be accomplished in accordance with the Statement of Work (Section C03).

(2) CAVS Reporting: The Contractor shall furnish effort including labor, materials, and facilities as may be required to accumulate, format, and transmit the transactions specified in Section C02.

B02 – DFARS 252.217-7028 – OVER AND ABOVE WORK (DEC 1991)

(a) Definitions. As used in this clause—

(1) “Over and above work” means work discovered during the course of performing overhaul, maintenance, and repair efforts that is—

(i) Within the general scope of the contract;

(ii) Not covered by the line item(s) for the basic work under the contract; and

(iii) Necessary in order to satisfactorily complete the contract.

(2) “Work request” means a document prepared by the Contractor which describes over and above work being proposed.

(b) The Contractor and Administrative Contracting Officer shall mutually agree to procedures for Government administration and Contractor performance of over and above work requests. If the parties cannot agree upon the procedures, the Administrative Contracting Officer has the unilateral right to direct the over and above work procedures to be followed. These procedures shall, as a minimum, cover—

(1) The format, content, and submission of work requests by the Contractor. Work requests shall contain data on the type of discrepancy disclosed, the specific location of the discrepancy, and the estimated labor hours and material required to correct the discrepancy. Data shall be sufficient to satisfy contract requirements and obtain the authorization of the Contracting Officer to perform the proposed work;

(2) Government review, verification, and authorization of the work; and

(3) Proposal pricing, submission, negotiation, and definitization.

(c) Upon discovery of the need for over and above work, the Contractor shall prepare and furnish to the

Government a work request in accordance with the agreed-to procedures.

(d) The Government shall—

(1) Promptly review the work request;

(2) Verify that the proposed work is required and not covered under the basic contract line item(s);

(3) Verify that the proposed corrective action is appropriate; and

(4) Authorize over and above work as necessary.

(e) The Contractor shall promptly submit to the Contracting Officer, a proposal for the over and above work. The

Government and Contractor will then negotiate a settlement for the over and above work. Contract modifications will be executed to definitize all over and above work.

(f) Failure to agree on the price of over and above work shall be a dispute within the meaning of the Disputes clause of this contract.

B04 - WSSTERMBZ01 - ***IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION

REPORTING***

Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Additional information regarding reporting via Commercial Asset Visibility (CAV) is available at https://www.navsup.navy.mil/navsup/ourteam/navsupwss/business_opps/edi_local_clauses https://www.navsup.navy.mil/navsup/ourteam/navsupwss/business_opps/edi_local_clauses https://www.navsup.navy.mil/public/navsup/wss/pi_cd/.

Questions can be addressed to NAVSUPWSSCAVSOW@navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to NAVSUPWSSM.CAVSOW@navy.mil for

NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104). (06-16) https://www.navsup.navy.mil/public/navsup/wss/pi_cd/

Section C - Descriptions and Specifications

SECTION C

C01 - INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED

(a) Articles to be repaired and/or modified under this contract will be shipped at the Government's expense to the plant of the contractor.

The contractor shall receive for each shipment a list (referencing this contract number) of the articles included in the shipment.

(b) Upon receipt of such articles, the contractor shall:

(1) Verify that the articles received corresponds with the list of the articles furnished for such shipment;

(2) Inspect such articles to assure that they are candidates for servicing under this contract;

(3) Segregate those which were improperly sent to the contractor and request disposition instructions therefore from the NAVSUP Weapon Systems Support PCO;

(4) Provide adequate storage for articles to be repaired pending issuance of an order by the ACO or PCO hereunder;

(5) Not proceed with the repair of any articles (i.e., inducting any units into "M" condition) until funding authorization is received from the PCO. Retain such units in "F" condition until funding authorization/disposition instructions are received from the PCO.

(6) Advise the Government (ACO and PCO) if any portion of the required repair is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship, or otherwise not in conformance with the requirements of the contract under which such articles were originally furnished; and

(7) Further advise the Government (ACO or PCO) of the results of the foregoing preliminary inspection, together with a list of the articles and quantities required to be repaired.

C02 - SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK (SOW)(AUG 2006)

(a) SCOPE

(1) REPAIR IN ACCORDANCE WITH REFURBISHMENT INSTRUCTIONS NO. 5560-012-0717 Rev

G AND NO. 556A-012-0001 Rev A

(2) General. The items to be furnished hereunder shall be repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this Contract. Government Furnished Property (GFP), including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the Contractor unless expressly provided for by the PCO. This limitation regarding the furnishing of GFP applies notwithstanding any reference to the contrary in any drawing, manual, or specification for the Contract items.

(3) Repair Requirements. The Contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the items to a Ready For Issue (RFI) condition. RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The Contractor shall identify the governing repair manual(s)/documents for each item covered by this Contract. The Contractor must identify the facility for each item where repair, including final test and inspection, is completed.

(i) Changes to repair manuals/documents and changes to drawings or specifications for the manufacture of parts utilized in these repairs require Procuring Contracting Officer (PCO) approval in accordance with the

Configuration Management provisions of this Contract. In addition, as provided for in Section (b)(3), requests for changes to a repair source or repair facility shall be submitted in writing to the PCO and must be approved prior to making any such change.

(ii). Any repairs performed using unapproved changes to manuals, drawings, specifications, or unapproved changes to a repair source or facility are not permitted and any such changes are done entirely at the

Contractor’s own risk.

(iii) The Contractor is not entitled to any equitable adjustment to the price or Contract terms based on the

Government’s disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

(4) Beyond Physical Repair (BPR)

(i). Scope. An item is BPR when the item is not capable of being repaired in accordance with the Statement of Work due to the extent of physical damage.

(ii). Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BPR. All such determinations, including the basis for the determination and the

DCMA written concurrence shall be provided by the Contractor to the PCO, with a copy to the Inventory

Manager (IM). After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions. If provided disposition instructions, the contractor shall submit a proposal for

BER pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved

Government property disposal procedures.

(5) Beyond Economical Repair (BER)

(i) Scope. An item is BER if the cost of the repair exceeds 80% of the replacement price of the item. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this Contract.

(ii) Procedures. Items determined BER will be separately priced if the repair is authorized by the PCO. The

Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be

BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the Contractor to the PCO, with a copy to the IM. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions or contractual authority for repair of the item. The Contractor is not authorized to proceed with the repair until notification is received from the PCO. If provided disposition instructions, the contractor shall submit a proposal for BER pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.

(iii) The following additional procedures may apply, if authorized, for the replacement of a BER SRA

(Shop Repairable Assembly) within a WRA (Weapons Repairable Assembly) when the SRA has not been separately inducted. The Contractor may request authorization to:

Ship in place an accepted item from an existing spares or repair Contract, if any, or MILSTRIP the

SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with Section III.I.2.a of the WEB-BASED

COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. The Contractor must provide written notification of any item shipped in place or MILSTRIPed to the PCO and an equitable adjustment may be required. If authorization to ship in place or MILSTRIP is not provided, the Contractor shall contact the PCO for further instructions.

(6) Over and Above Repair (OAR).

(i) Scope. An item sent to the Contractor shall be considered to require Over and Above Repair (OAR) effort if the repair required is highly unusual, not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, OAR items may be subject to equitable adjustment.

(ii) Procedures. To the maximum extent possible, OAR shall be identified by the Contractor as part of the contract pricing.

(iii) The Contractor shall obtain written concurrence from DCMA for all units determined by the

Contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the Contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions or contractual authority for repair of the item. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.

(b) PARTS AND MATERIAL

1. The Contractor is responsible for supplying all parts and material necessary to perform the required repairs under this Contract unless parts or material are specifically identified as Government Furnished Material

(GFM). All parts and material used in performance of this Contract shall be in accordance with the latest approved revision of applicable drawings and specifications. The Contractor shall ensure it has access for the duration of this Contract to updated drawings and specifications for parts and material required for repairs performed under this Contract. Any change to such parts/material drawings or specifications requires

Government approval in accordance with the Configuration Management provisions of this Contract.

2. All parts and material shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization of piece parts must be approved by the

PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific additional approval by the PCO. Cannibalization or swapping, including any actions authorized under paragraphs (a)(4) and (a)(5), shall not render an item BER or BPR.

3. Purchased Material Control and Parts Control. The Contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and material purchased are in compliance with the requirements of this Contract.

(c) INSPECTION PROVISIONS

1. Government inspection shall be in accordance with FAR 52.246-2, Inspection of Supplies - Fixed-Price referenced in Section E, at source by DCMA unless otherwise specified in the Contract or as authorized by the

PCO. Acceptance testing shall be conducted under the surveillance of the DCMA QAR. These tests shall include all tests necessary to assure that the items repaired conform to the performance required to provide

Ready For-Issue material. The DCMA retains the authority to require the Contractor to conduct or reconduct any tests deemed necessary to ensure compliance with the manuals, drawings and specifications applicable to this Contract.

C03 - WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK (SOW)

The CAV Statement of Work (SOW) is located at: https://www.navsup.navy.mil/public/navsup/wss/pi_cd/.

C04 - WSSTERMCZ01 - CONFIGURATION CONTROL

(a) The Contractor shall maintain the total baseline configuration of the contract items, including, but not limited to, hardware, software and firmware, in accordance with the configuration management provisions of this contract.

(b) Definitions

(1) Critical Application Item (CAI) – CAI is defined as an item that is essential to weapon system performance or operation, or the preservation of life or safety of operational personnel, as determined by the military services. The subset of CAIs, whose failure could have catastrophic or critical safety consequences (Category I or II as defined by MIL-STD-882), are Critical Safety Items (CSI).

(2) Critical Safety Item (CSI) - CSI is defined as a part, an assembly, installation, or production system with one or more critical or critical safety characteristics that, if missing or not conforming to the design data, quality requirements, or overhaul and maintenance documentation, would result in an unsafe condition that could https://www.navsup.navy.mil/public/navsup/wss/pi_cd/ cause loss or serious damage to the end item or major components, loss of control, un-commanded engine shutdown, or serious injury or death to personnel and unsafe conditions, which relate to hazard severity categories I and II of

MIL-STD-882, System Safety Requirements. CSIs are a subset of CAIs and include, but are not limited to, items determined to be life-limited, fracture critical, or fatigue sensitive. A Critical Safety Item may also be known by terms such as a Flight Safety Critical Aircraft Part, Flight Safety Part, or Flight Safety Critical Part. For purposes of this contract, the term used will be Critical Safety Item.

(3) Engineering Change Proposal (ECP) – An ECP is the documentation by which an engineering change and its implementation for items to be delivered under this contract is proposed, justified and submitted to the appropriate authority for approval or disapproval. Class I and Class II ECPs will be classified as follows:

(i) Class I ECP. An engineering change will be classified as Class I if:

(A) it affects any physical or functional requirement in approved functional or configuration documentation, or

(B) it affects any approved functional, allocated or product configuration documentation, cost to the

Government, warranties or contract milestones, or

(C) it affects approved product configuration documentation and one or more of the following:

Government furnished equipment (including Government test equipment and associated programs such as Test

Program Sets/Software); safety; compatibility, interoperability, or logistic support; delivered technical manuals for which changes are not funded; will require retrofit of delivered units; preset adjustments or schedules affecting operating limits or performance to the extent a new identification number is required; interchangeability, substitutability, or replacement of any item down to non-repairable assemblies, sources on a source control drawing;

or skills manning, training, biomedical factors or human engineering design.

(ii) Class II ECP. An engineering change is Class II if it does not impact any of the Class I factors specified above.

(4) Deviation – A deviation is the specific written authorization to depart from a particular requirement of the item’s configuration for a specific number of units or for a specific amount of time. It is also a specific written authorization to accept items, which are found to depart from specified requirements, but which nevertheless is considered suitable for use “as is” or after correction by a specified method. The term deviation encompasses what previously had been defined as both a deviation and waiver, and therefore includes requests to depart from a known requirement before, during or after manufacture. Deviations will be classified as follows:

(i) Major. A deviation is major when it involves a departure from requirements or specifications involving: health, performance, interchangeability, reliability, survivability, maintainability or durability of the item or parts, effective use or operation of the item or system, weight or size, and appearance (when a factor).

(ii) Critical. A deviation is critical when the deviation involves or impacts safety.

(iii) Minor. A deviation is minor when the deviation does not involve factors listed above for either critical or major deviations.

(c) Configuration Management/ECPs

(1) The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the contract items and sub-assemblies. Guidelines for preparing Class I and Class II ECPs may be found in MIL-HDBK-61A, Configuration Management Guidance and ANSI/EIA-649, National Consensus Standard for Configuration Management. The Contractor will maintain configuration of the items in accordance with the requirements of this contract.

(2) The Contractor shall submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the items covered by this contract. An ECP shall be designated Class I or Class II, as defined in this contract.

(i) If the Contractor has an ECP pending with another Government activity, has an approved ECP that the Contractor proposes to incorporate under this contract, or has an ECP pending or approved under a production contract, the Contractor will notify the PCO of the status of the ECP and provide a copy of the ECP submission.

Any such Class I ECPs, however, will be incorporated only by modification to the contract.

(ii) A properly documented ECP submitted under this contract shall be processed as follows:

(A) Any Class I ECP must be submitted to the contracting officer for approval/disapproval. A Class

I change will be not be implemented until a contract modification is issued by the contracting officer.

(B) Any Class II ECP involving a non-critical item or a CAI shall be submitted to the cognizant

Defense Contract Management Agency (DCMA) for concurrence in classification and may be implemented only upon receiving DCMA concurrence. Any Class II ECP involving a CSI must be clearly identified as involving a

CSI, must be submitted to the contracting officer for review by the contracting officer and the Navy’s Basic Design

Engineer, and may be implemented only upon the approval of the contracting officer. If, however, authorized in writing by the contracting officer or if the Naval Air Systems Command has delegated authority in writing to the

DCMA to concur in Class II ECPs involving CSIs for the Contractor (which is specific to the Contractor’s location and CAGE code), a Class II ECP involving a CSI may be submitted to the DCMA and implemented upon DCMA’s concurrence with classification. If the affected Class II ECP item or items have not been identified as CAI, CSI or as non-critical by the Government, the Contractor will contact the contracting officer to obtain a classification for the affected items. The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the contractor due to a misclassification of an ECP by the contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. Class II changes shall be made at no additional cost to the Government.

(iii) The Contractor shall coordinate with the cognizant NAVAIR PMA office prior to any ECP submission. The Contractor will provide copies of configuration changes affecting FMS customers to NAVICP

FMS, Code P751.

(iv) Under this contract, a Class I ECP may be prepared in the contractor’s format but in a medium compatible with Government information management systems. In addition, a Class I ECP shall provide all information required by DI-CMAN-80639C – Engineering Change Proposal. A Class II ECP may be prepared in the contractor’s format. The minimum required data is: name and part number of item affected; name and part number of next higher assembly; description of the engineering change; need and reason for the change; all government contract numbers for which the change applies; and the change document number. Justification codes are not required for Class II ECPs.

(v) The contractor is not entitled to any equitable adjustment to the contract price or terms based on the

Government’s disapproval of a Class I or Class II ECP.

(d) Configuration Management/Deviations

(1) The Contractor shall not manufacture any item for acceptance by the Government that incorporates a known departure from technical or contractual requirements unless a request for a deviation has been approved.

Authorized deviations are a temporary departure from the requirements only and do not authorize a change to the item’s configuration baseline.

(2) Deviation requests shall be prepared in accordance with DI-CMAN-80640C – Request for Deviation.

Guidelines for preparing deviations may also be found in MIL-HDBK-61A, Configuration Management Guidance and ANSI/EIA-649, National Consensus Standard for Configuration Management.

(3) Major, critical and minor deviations are classified in accordance with the definitions in this contract.

(4) A Request for Deviation shall be processed as follows upon submission of a properly documented request:

(i) For items involving a major or critical deviation, delivery and/or shipment of such items of items under this contract is not permitted until authorized in writing by the contracting officer.

(ii) For any non-critical item or CAI involving a minor deviation, delivery and/or shipment of such items under this contract is not permitted until authorized by the cognizant DCMA. Minor deviations affecting CSI must be identified as involving a CSI, must be submitted to the contracting officer for review by the contracting officer and the Navy’s Basic Design Engineer, and may be delivered only upon the approval of the contracting officer. If, however, authorized in writing by the contracting officer or if the Naval Air Systems Command has delegated authority in writing to the DCMA to approve minor deviations involving CSIs for the Contractor (which is specific to the Contractor’s location and CAGE code), a minor deviation affecting a CSI may be reviewed by the

DCMA and may be delivered if authorization from DCMA is received. If the affected item or items have not been identified as CAI, CSI or as non-critical by the Government, the Contractor will contact the contracting officer to obtain a classification for the affected items.

(5) Recurring deviations are discouraged and shall be minimized. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government’s disapproval of a major/critical or minor deviation. In addition, the Government may be entitled consideration from the contractor if a deviation is approved. (10-04)

C05 - SPECIFICATION FOR CONSUMABLE PARTS (CONTRACTOR-FURNISHED)

The contractor shall furnish on an "as required" basis all parts required to complete servicing of repairable articles to a Ready for Issue condition within established delivery schedules. Such parts shall be in accordance with applicable drawings and specifications.

C06 – WSSTERMCZ04 GOVERNMENT INDUSTRY DATA EXCHANGE PROGRAM (GIDEP)

a. The Contractor will actively participate in the Government Industry Data Exchange Program (GIDEP) per the Operations Manual (OM). The Contractor will submit informantion concerning critical or major noncomformances, as defined in FAR 46.101, to the GIDEP informantion system.

b. The Contractor will insert paragraph (a) of this clause in any subcontract when deemed necessary by the

Contractor. When so inserted, the word "contractor" will be changed to "subcontractor."

c. The Contractor will, when it slects not to insert paragraph (a) in a subcontract, provide the subcontractor any GIDEP data which may be pertinent to items of its manufacture and verify that the subcontractor utilizes any such data.

d. The Contractor shall, whether it elects to insert paragraph (a) in a subcontract or not, verify that the subcontractor utilizes and provides feedback on any GIDEP data that may be pertinent to items of its manufacture.

e. Associated Data Item Description (DID) DI-QCIC-80125B: Alert/Safe-Alert Reporting to GIDEP. (06-17)

CLAUSES INCORPORATED BY REFERENCE

SUPTXT204-

9400(1-17)

Contractor Unclassified Access to Federally Controlled

Facilities, Sensitive Information, Information Technology

(IT) Systems or Protected Health Information

APR 2017

CLAUSES INCORPORATED BY FULL TEXT

252.209-7010 CRITICAL SAFETY ITEMS (AUG 2011)

(a) Definitions.

Aviation critical safety item means a part, an assembly, installation equipment, launch equipment, recovery equipment, or support equipment for an aircraft or aviation weapon system if the part, assembly, or equipment contains a characteristic any failure, malfunction, or absence of which could cause--

(i) A catastrophic or critical failure resulting in the loss of, or serious damage to, the aircraft or weapon system;

(ii) An unacceptable risk of personal injury or loss of life; or

(iii) An uncommanded engine shutdown that jeopardizes safety.

Design control activity. (i) With respect to an aviation critical safety item, means the systems command of a military department that is specifically responsible for ensuring the airworthiness of an aviation system or equipment, in which an aviation critical safety item is to be used; and

(ii) With respect to a ship critical safety item, means the systems command of a military department that is specifically responsible for ensuring the seaworthiness of a ship or ship equipment, in which a ship critical safety item is to be used.

Ship critical safety item means any ship part, assembly, or support equipment containing a characteristic, the failure, malfunction, or absence of which could cause--

(i) A catastrophic or critical failure resulting in loss of, or serious damage to, the ship; or

(ii) An unacceptable risk of personal injury or loss of life.

(b) Identification of critical safety items. One or more of the items being procured under this contract is an aviation or ship critical safety item. The following items have been designated aviation critical safety items or ship critical safety items by the designated design control activity:

CLINS 0001 – 00004 Hydraulic Accumulators

(c) Heightened quality assurance surveillance. Items designated in paragraph (b) of this clause are subject to heightened, risk-based surveillance by the designated quality assurance representative.

(End of clause)

Section D - Packaging and Marking

SECTION D

SECTION D - PACKAGING AND MARKING

D01 - DFARS 252. 211-7006 - PASSIVE RADIO FREQUENCY IDENTIFICATION (JUN 2016)

This clause is incorporated by reference with the same force and effect as if it were given in full text. The clause is applicable to individual cases and palletized unit loads for the shipment of items in the supply classes and to the locations identified in DFARS 211.275-2.

D02 - WSSTERMDZ03 - PRESERVATION, PACKAGING, PACKING AND MARKING

The contractor shall preserve, package, pack and mark all items as cited below.

1. PRESERVATION REQUIREMENTS

a. SYSTEM STOCK SHIPMENTS - The contractor shall preserve all items intended to enter the military distribution system (stock) in accordance with the MIL-STD-2073-1E, “Standard Practice for Military

Packaging”, Packaging Requirements Code specified in the Schedule. When a Specialized Preservation

Code/Method of Preservation (MOP) (Table J-Ia) is specified, and one or more of the following packaging fields (WM, CUD, CT, UC) value is a 00 (numeric), the Specialized Preservation/MOP procedure and materials takes precedence. Disregard “HM” and “LP” fields and replace “SPMK 99” with “00”

(numeric). Contractor can access https://tarp.navsisa.navy.mil for code interpretation.

i. Contractor shall use material produced by a Qualified Products List (QPL) manufacturer if the required packaging material has a QPL. Barrier materials that have QPLs are MIL-PRF-131, Classes 1 and 3, MIL-PRF-81705D, Type 1 and MIL-PRF-22191. These items can be identified by the following packaging field values: PM = “31”, “32”, “33”, “41”, “42”, “43”, “44”, “45”, “51”, “52”, “53”, “54”, “55”, “AW”, “BD”, “DW”, “GX”; or UC = “B2”, “B3”, “B9”, “BL”, “BS” or “SD”. Sources for

QPL material can be obtained by contacting 215-697-5842.

b. IMMEDIATE USE/INSTALLATION AND PART NUMBER BUY SHIPMENTS – Government PCO or

ACO approval to use the packaging standards outlined in this paragraph is required, and is only permitted for all items determined to be for immediate use (e.g. CASREP, AOG, or Repair line stoppage) and part number buy shipments. Any national stock numbered (NSN) item required for immediate use or direct installation, or part number item (authority granted to ship without NSN) shall be preserved and packed in accordance with ASTM D 3951-10, “Standard Practice for Commercial Packaging”, for all shipments to a

Continental United States (CONUS) government activity or contractor-owned facility. Marking shall be in accordance with MIL-STD-129R, “Military Marking for Shipment and Storage”. All buys destined for overseas shipment (OCONUS) shall be preserved in accordance with MIL-STD-2073-1E.

c. GOVERNMENT-OWNED MATERIAL – In the event that the contract expires and there is no follow-on contract, or the contract is terminated or completed and Government-owned material is to be returned to the supply system, the contractor shall preserve and package this material in accordance with the requirements of paragraph 1 a.

2. PACKING REQUIREMENTS. The contractor shall pack as follows. Exterior shipping containers for

Packing Levels A and B are detailed in MIL-STD-2073-1E, Appendix C, Table C.II. Reusable containers, fast pack containers or wood containers are shipping containers and do not require overpacking for shipment.

Domestic Shipments (CONUS): Level B

Overseas Shipments (OCONUS) (including Navy ships at sea):

Via air, FPO, APO Level B

Via freight forwarder Level B

Via surface Level A

3. MARKING REQUIREMENTS. All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129R. In addition, the following specific requirements apply:

a. ADDITIONAL MARKING FOR SPARES ONLY – Each MIL-STD-129R label shall also include the following:

i. Supplementary Procurement Instrument Identification Number (SPIIN) – the 4-digit order number that follows the long-term contract number (e.g. 0001, A001, 5001, 7001, etc.),

ii. Contract Line Item Number (CLIN) – the 4-digit individual line item number (e.g. 0001, 0002, etc.), and

iii. SubCLIN – the 6-digit sub line item number (e.g. 0001AA, 0001AB, 0002AA, 0002AB, etc.).

b. 2D BAR CODE MILITARY SHIPPING LABEL (MSL) – 2D bar code requirements in accordance with

MIL-STD-129R, Paragraph 5.2.2.6

c. RADIO FREQUENCY IDENTIFICATION (RFID) LABEL – RFID requirements in accordance with clause DFARS 252.211-7006 “Passive Radio Frequency Identification.”

d. DEPOT LEVEL REPAIRABLE (DLR) LABELS

i. Items identified with a Cognizance Code of either “7” or an even number preceding the NSN (e.g.

7RH 5826-01-428-9999) are defined as Depot Level Repairable (DLR) items. DLR items require that a DLR label be placed on the outside of the unit, the intermediate and the shipping container for accountability and control purposes. The outside of each unit, intermediate and shipping container shall be affixed with the applicable label as close to the bar code label as possible.

EXCEPTION: When a DLR item requires use of both a reusable inner unit container and a reusable outer shipping and storage container (excluding wood and fiberboard), only the inner unit container shall be affixed with a DLR label. In these cases only, DLR labels shall NOT be placed on the outer reusable container

ii. Labels can be obtained via email: tyrone.sizer@dla.mil or sandy.sullivan@dla.mil

Provide the following information in the email:

a). Contract Number

b) NSN of the size DLR Label you need (per the below)

c) POC and Address for these to be sent to.

NSN DESCRIPTION QUANTITY

PER UNIT

PACKAGE

APPLICATION FORM NUMBER

xxxxxxxxxxxxx DLR Label

2 in. x 3 in.

100 Unit

Container

NAVSUP 1397-1

xxxxxxxxxxxxx DLR Label

3 in. x 5 in.

100 Intermediate /

Shipping

Container

NAVSUP 1397

Labels may also be obtained by faxing a copy of the contract page containing the DLR label requirement and providing the POC/Address to 215-697-2424.

e. SPECIAL MATERIAL IDENTIFICATION CODE (SMIC) FOR NAVSUP WSS MECHANICSBURG

MARITIME REQUIREMENTS ONLY

i. Certain Program-related items are identified by a two-position SMIC, which appears as a suffix to the

NSN (e.g. 1H4730-00-900-1317 L1), and require special markings. Containers shall be marked with letters, maximum two inches high on two (2) sides and two (2) ends as follows:

SMIC MARKINGS COLOR TYPE CONTAINER

L1 LEVEL 1 RED Unit, intermediate and shipping

(size permitting)

S1 SURFACE

LEVEL 1

RED Unit, intermediate and shipping

(size permitting)

D4/D5/D7 DSS-SOC RED Unit, intermediate and shipping

(size permitting)

C1 * LEVEL 1 SPECIAL

CLEAN O2-N2

GREEN Unit, intermediate and shipping

CP/VG * SPECIAL CLEAN

O2-N2

GREEN Unit, intermediate and shipping mailto:sandy.sullivan@dla.mil

D0/D6/D8 * DSS-SOC SPECIAL CLEAN

O2-N2

GREEN Unit, intermediate and shipping

VU FBW SFCC VU BLUE Unit, intermediate and shipping

(size permitting)

SW FBW SFCC SW BLUE Unit, intermediate and shipping

(size permitting)

Q3/Q5 Q3 or Q5 RED Unit, intermediate and shipping

* denotes Oxygen Clean requirements in accordance with MIL-STD-1330 “Precision Cleaning and Testing of

Shipboard Oxygen, Helium, Helium-Oxygen, Nitrogen, and Hydrogen Systems.”

4. PALLETIZATION. Palletization of shipments shall be accomplished in accordance with MIL-STD-147E

“DoD Standard Practice: Palletized Unit Loads.”

5. WOOD PACKAGING MATERIAL (WPM). In accordance with the latest version of DoD Manual 4140.65-M

"Compliance for Defense Packaging: Phytosanitary Requirements for Wood Packaging Material (WPM)," assets packed in or on wood pallets, skids, load boards, pallet collars, wood boxes, reels, dunnage, crates, frames, and cleats must comply with the Heat Treatment (HT) or Heat Treatment/Kiln Dried (HT/KD)

(continuous at 56 degrees Centigrade for 30 minutes) standard. The WPM must be stamped or branded with the appropriate certification markings as detailed in DoD 4140.65-M and be certified by an accredited

American Lumber Standards Committee (ALSC)-recognized agency. The WPM certification markings must be easily visible, especially in pallet loads, to inspectors.

6. NAVY SHELF LIFE PROGRAM. Navy shelf-life requirements are listed under the item description in a 3-digit alpha/numeric code. Position one (1) is the DOD shelf-life code, defining the type of shelf-life for an item (Type I, non-extendible or Type II, extendible), and the number of months an item can remain ready for issue in a Navy specified package. Positions two (2) and three (3) combined form the Navy-unique shelf-life action codes used by storage activities, and do not impose any requirements on the contractor. The contractor shall use the applicable shelf-life paragraphs and table in MIL-STD-129R to apply either Type I or Type II shelf-life markings for an item's unit, intermediate and shipping containers. Contractors will ensure that at least eighty-five percent (85%) of the Navy shelf-life requirement is remaining when received by the first government activity.

7. REUSABLE NSN CONTAINERS. An item that has an NSN assigned in the “Container NSN” field (e.g .

8145012622982) requires shipment in a metal or plastic reusable shipping and storage container.

a. REUSABLE CONTAINERS FOR NAVSUP WEAPON SYSTEMS SUPPORT, MECHANICSBURG

SITE, MARITIME REQUIREMENTS. Reusable NSN containers for maritime material (designated by a

Cognizance Code of “7E”, “7G” and “7H”) shall be provided as contractor-furnished material (CFM).

Source lists of possible container manufacturers may be obtained by contacting 215-697-5842.

8. MATERIAL SAFETY DATA SHEETS. As required by clauses FAR 52.223-3 “Hazardous Material

Identification and Material Safety Data” and DFARS 252.223-7001 “Hazard Warning Labels” the offeror is required to list any hazardous material to be delivered under the resultant contract by the submission of

Material Safety Data Sheets (MSDSs) to the NAVSUP WSS Contracting Officer prior to award. A copy must also be provided to NAVSUP WSS, Code 0772, P.O. Box 2020, 5450 Carlisle Pike, Mechanicsburg, PA

17055-0788 or via FAX number 717-605-3480. (07-14)

252.211-7006 Passive Radio Frequency Identification MAR 2018

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2016)

(a) Definitions. As used in this clause-

Automatic identification device means a device, such as a reader or interrogator, used to retrieve data encoded on machine-readable media.

Concatenated unique item identifier means--

(1) For items that are serialized within the enterprise identifier, the linking together of the unique identifier data elements in order of the issuing agency code, enterprise identifier, and unique serial number within the enterprise identifier; or

(2) For items that are serialized within the original part, lot, or batch number, the linking together of the unique identifier data elements in order of the issuing agency code; enterprise identifier; original part, lot, or batch number;

and serial number within the original part, lot, or batch number.

Data Matrix means a two-dimensional matrix symbology, which is made up of square or, in some cases, round modules arranged within a perimeter finder pattern and uses the Error Checking and Correction 200

(ECC200) specification found within International Standards Organization (ISO)/International Electrotechnical

Commission (IEC) 16022.

Data qualifier means a specified character (or string of characters) that immediately precedes a data field that defines the general category or…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.